Free Simultaneous Operations (Simops) Plan - Oil & Gas Industry template for oil & gas you can edit online and download as PDF. Covers operations interface matrix, communication protocol, emergency response coordination.
| PROJECT: SIMOPS ID: SIM- DATE PREPARED: VALID FROM: ______/______/______ | LOCATION: FACILITY: REVISION: 01 VALID TO: ______/______/______ |
|---|---|
| SIMULTANEOUS OPERATIONS: ☐ Drilling & Production ☐ Construction & Production ☐ Maintenance & Drilling ☐ Commissioning & Operations ☐ Well Intervention & Production | OPERATIONS COORDINATOR: NAME: ______________ CONTACT: ______________ RADIO CHANNEL: ______________ EMERGENCY CONTACT: ___________ |
| Operation A | Operation B | Conflict Level | Risk Level | Control Measures | Responsible Person |
|---|---|---|---|---|---|
| Drilling | Production | High ☐ Med ☐ Low ☐ | High ☐ Med ☐ Low ☐ | ☐ 500m Exclusion ☐ Gas Mon | __________ |
| Crane Lifting | Helicopter Ops | High ☐ Med ☐ Low ☐ | High ☐ Med ☐ Low ☐ | ☐ Flight Restrict ☐ Radio | __________ |
| Hot Work | Hydrocarbon Transfer | High ☐ Med ☐ Low ☐ | High ☐ Med ☐ Low ☐ | ☐ Gas Test ☐ Fire Watch | __________ |
| Construction | Production | High ☐ Med ☐ Low ☐ | High ☐ Med ☐ Low ☐ | ☐ Barrier Check ☐ Comm. | __________ |
| Operation | Primary Comm | Secondary Comm | Emergency Comm | Update Frequency | Key Contacts |
|---|---|---|---|---|---|
| Drilling | UHF CH5 | VHF CH3 | SAT Phone | Hourly | __________ |
| Production | UHF CH2 | VHF CH4 | SAT Phone | Continuous__________ |
|---|
| Construction | UHF CH6 | VHF CH2 | SAT Phone | 2-hourly | __________ |
|---|
| Marine | VHF CH16 | UHF CH4 | SSB Radio | Continuous__________ |
|---|
| Scenario | Primary Response | Support Response | Evacuation Route | Assembly Point | Mustering Headcount |
|---|---|---|---|---|---|
| Hydrocarbon Release | ESD | Deluge | Route A | MSP-1 | By Supervisor |
| Fire/Explosion | F&G | Fire Team | Route B | MSP-2 | By Department |
| Medical Emergency | First Aid | Medevac | Route C | Helideck | By Area |
| Severe Weather | Secure | Monitor | Route D | TR-1 | Roll Call |
Operations Manager: ______________ Date: ______________
HSE Advisor: ______________ Date: ______________
SIMOPS Coordinator: ______________ Date: ______________
PLAN STATUS: ACTIVE ☐ SUSPENDED ☐ ARCHIVED
╰──────────────────────────────────────────────────────────────────────────────╯