Free Hazard And Operability (Hazop) Study - Oil & Gas Industry template for oil & gas you can edit online and download as PDF. Covers hazop study worksheet, risk assessment & recommendations, study close-out.
| STUDY ID: HZ- SYSTEM/UNIT: DESIGN INTENT: PARTICIPANTS: | FACILITY: STUDY DATE: REVISION: 01 STUDY LEADER: |
|---|---|
| HAZOP TEAM: ☐ Process Engineer ☐ Operations Representative ☐ Mechanical Engineer ☐ Instrument Engineer ☐ HSE Advisor | METHODOLOGY: ☐ Guide Words ☐ Parameters ☐ Deviation Analysis ☐ Risk Ranking ☐ Safeguard Review |
| Node/Parameter | Guide Word | Deviation | Causes | Consequences | Safeguards |
|---|---|---|---|---|---|
| Feed Gas Line Pressure | MORE | More Pressure | ☐ Control Valve Failure ☐ Upstream Upset | ☐ High Pressure ☐ Line Rupture ☐ Fire | ☐ PSV-001 ☐ PSH-002 ☐ ESD System |
| Crude Oil Transfer Flow | LESS | Less Flow | ☐ Pump Failure ☐ Blockage ☐ Leak | ☐ Low Flow ☐ Pump Damage | ☐ LSL-015 ☐ SDV-008 ☐ Recycle Valve |
| Separator Level Control | NO | No Level Control | ☐ LIT Failure ☐ Control System Failure | ☐ Vessel Overflow ☐ Liquid Carryover | ☐ LAL-101 ☐ LSH-102 ☐ Bypass Controller |
| Fuel Gas System | REVERSE | Reverse Flow | ☐ Check Valve Failure ☐ Low Pressure | ☐ Backflow ☐ Fire/ Explosion | ☐ NRV-205 ☐ PSV-206 ☐ ESD Isolation |
| Deviation | Risk Ranking | Action Required | Priority | Responsible Party | Due Date |
|---|---|---|---|---|---|
| High Pressure in Feed Line | High | Install Additional PSV | High | Engineering__________ Dept. | |
| No Level Control | Medium | Add Redundant LSHH | Medium | Operations__________ | |
| Reverse Flow in Fuel Gas | High | Install Double Block Valve | High | Maintenance__________ |
HAZOP Leader: ______________ Date: ______________
Actions Verified By: ______________ Date: ______________
Management Review: ______________ Date: ______________
STUDY STATUS: COMPLETED ☐ IN PROGRESS ☐ PENDING REVIEW
╰──────────────────────────────────────────────────────────────────────────────╯