Free Drilling Procedure Method Statement template for oil & gas you can edit online and download as PDF. Covers well information, 1.0 scope of work, 2.0 references and applicable codes.
METHOD STATEMENT ID: DRIL-MS-__________ DATE: ______________ REVISION: ______________
WELL NAME: ______________ WELL #: ______________ RIG #: ______________
LOCATION: ______________ FIELD: ______________ BLOCK: ______________
OPERATOR: ______________ CONTRACTOR: ______________ TOOLPUSHER: ______________
This method statement covers the safe drilling operations from spud to total depth, including:
☐ Rig up and BOP installation ☐ Drilling surface hole (_____________")
☐ Running and cementing conductor casing ☐ Drilling intermediate hole (_____________")
☐ Running and cementing surface casing ☐ Drilling production hole (_____________")
☐ BOP testing and function checks ☐ Logging and evaluation
☐ Directional drilling (if applicable) ☐ Running and cementing production casing
☐ Well control drills ☐ Preparing to hand over for completion
All operations shall be conducted in accordance with the approved drilling program, API standards, and
relevant statutory requirements.
STANDARD/CODE DESCRIPTION REVISION/DATE
API RP 54 Occupational Safety for Oil & Gas Well Drilling Current
API RP 59 Well Control Operations Current
API RP 53 Blowout Prevention Equipment Systems Current
API RP 65 Cementing Shallow Water Flows Current
IADC Drilling Manual Drilling Practices and Guidelines Current
OSHA 29 CFR 1910 General Industry Standards Current
Company Drilling Program Well-specific instructions #: __________
ROLE NAME RESPONSIBILITIES
Drilling Superintendent ______________ • Overall drilling program oversight
• Resource allocation
• Client liaison
Toolpusher ______________ • Rig site management
• Drilling operations coordination
• Safety compliance
Driller ______________ • Direct drilling operations
• Crew supervision
• Well control drills
Company Man ______________ • Operator representative
• Program adherence
• Critical decisions
Mud Engineer ______________ • Mud program execution
• Mud properties monitoring
• Solids control
Directional Driller ______________ • Well trajectory control (if applicable)
Safety Officer ______________ • HSE compliance monitoring
• Permit to work system
• Incident reporting
4.1 Drilling Equipment:
☐ Drilling rig (_____________ HP) ☐ Top drive system ☐ Rotary table
☐ Drawworks ☐ Mud pumps (x_____) ☐ Mud tanks (_____________ bbl)
☐ Shale shakers ☐ Degasser ☐ Desander/desilter
☐ BOP stack (_____________") ☐ Choke manifold ☐ Kill manifold
☐ Accumulator unit ☐ Drilling line ☐ Crown-o-matic
4.2 Drill String and Bottom Hole Assembly:
☐ Drill pipe (_____________", _____________#/ft) ☐ Heavy weight drill pipe ☐ Drill collars (x_____)
☐ Bit (_____________", type: _____________) ☐ Stabilizers ☐ MWD/LWD tools
☐ Jars ☐ Shock tools ☐ Crossovers
4.3 Casing and Cementing:
☐ Conductor casing (_____________") ☐ Surface casing (_____________") ☐ Intermediate casing (_____________")
☐ Production casing (_____________") ☐ Casing accessories ☐ Cementing equipment
4.4 Safety Equipment:
☐ H2S monitors (personal/fixed) ☐ SCBA/escape packs ☐ Fire extinguishers
☐ First aid stations ☐ Eye wash stations ☐ Emergency shower
☐ Life rafts (offshore) ☐ Immersion suits (offshore) ☐ Marine radio
5.1 Rig Acceptance and Site Preparation:
• Verify rig is positioned correctly over well center
• Check rig level and alignment
• Conduct rig acceptance inspection
• Verify all safety systems operational
• Check BOP and accumulator function
• Test all alarms and communications
5.2 Pre-Spud Meeting and Drills:
• Conduct pre-spud safety meeting with all personnel
• Review drilling program and critical depths
• Conduct well control drill (all crews)
• Conduct H2S drill (if applicable)
• Conduct fire and emergency drills
• Review stuck pipe prevention measures
5.3 Conductor Installation (if not pre-installed):
• Drill conductor hole (_____________" x _____________ ft)
• Run conductor casing (_____________" x _____________ ft)
• Cement conductor with _____________ sxs
• Weld conductor to wellhead
6.1 Surface Hole Drilling (_____________" to _____________ ft):
• Make up BHA: Bit + mud motor + MWD + drill collars + HWDP + drill pipe
• Spud in and drill with _____________ GPM, _____________ RPM
• Maintain mud properties per program (MW _____________ ppg, PV _____________ cp)
• Monitor drilling parameters (WOB, ROP, torque, pressure)
• Perform flow checks at connections
• Collect cuttings samples every _____________ ft
• At section TD, circulate bottoms up and condition mud
• Run wireline logs as required
6.2 Surface Casing Running and Cementing:
• Inspect casing and drift all joints
• Make up casing with _____________ connections
• Fill casing every _____________ joints while running
• Land casing at _____________ ft with _____________ ft above seabed
• Circulate and condition mud before cementing
• Pump cement slurry (lead _____________ sxs, tail _____________ sxs)
• Displace with _____________ bbls at _____________ bpm
• Bump plug with _____________ psi
• Wait on cement (WOC) _____________ hours
• Nipple up BOP and test to _____________ psi
6.3 Intermediate Hole Drilling (_____________" to _____________ ft):
• Drill out cement and shoe track
• Perform formation integrity test (FIT) at _____________ psi
• Drill ahead with _____________ GPM, _____________ RPM
• Monitor for kicks and losses continuously
• Perform directional work as per program
• Circulate and condition mud at connections
• At section TD, circulate and condition for logs
• Run wireline logs
6.4 Intermediate Casing Running and Cementing:
• Similar procedure as surface casing
• Ensure centralizers at _____________ ft spacing
• Cement with _____________ sxs lead, _____________ sxs tail
• WOC _____________ hours
• Test BOP to _____________ psi
6.5 Production Hole Drilling (_____________" to TD @ _____________ ft):
• Drill out shoe and perform FIT
• Drill to TD with optimized parameters
• Monitor for H2S if expected
• Perform wiper trips as needed
• At TD, circulate bottoms up and condition mud
• Run comprehensive log suite
6.6 Production Casing Running and Cementing:
• Run casing with _____________ centralizers
• Fill casing every _____________ joints
• Land at _____________ ft
• Cement with _____________ sxs lead, _____________ sxs tail
• Displace with _____________ bbls
• Bump plug and hold pressure
• WOC _____________ hours
• Test casing to _____________ psi
7.1 Primary Well Control (Mud):
• Maintain mud weight between _____________ and _____________ ppg
• Monitor pit volume continuously (_____________ bbl increase alarm)
• Monitor flow show at connections
• Check mud properties every _____________ hours
• Keep mud logging unit operational
7.2 Secondary Well Control (BOP):
• BOP tested to _____________ psi every _____________ days
• Function test BOP every _____________ days
• Accumulator pressure maintained at _____________ psi
• Choke manifold tested weekly
• All crew members trained in BOP operations
7.3 Kick Detection and Handling:
• Flow check immediately if pit gain or flow observed
• If positive flow, shut well in using hard shut-in procedure
• Record SIDPP and SICP
• Use driller's method or wait and weight method per program
• Circulate kick out through choke manifold
• Maintain _____________ psi on casing at all times
• Monitor for gas at surface
7.4 Well Control Drills:
• Conduct weekly well control drills (all crews)
• Record drill times and performance
• Debrief after each drill
• Maintain well control training for all personnel
8.1 Well Trajectory:
• Target coordinates: _____________ N/S, _____________ E/W, _____________ ft TVD
• Kick-off point: _____________ ft
• Build rate: _____________°/100 ft to _____________° inclination
• Hold angle: _____________° to _____________ ft
• Drop rate: _____________°/100 ft
8.2 Survey Program:
• Survey interval: every _____________ ft drilled
• Survey type: ☐ MWD ☐ Gyro ☐ Magnetic single shot
• Calculate and plot actual vs planned trajectory
• Correct trajectory if deviation > _____________ ft
8.3 Anti-Collision:
• Conduct anti-collision analysis before drilling
• Maintain minimum separation factor > 1.5
• Plot proximity to offset wells
• Stop drilling if separation factor < 1.0
9.1 Daily Drilling Report (IADC format):
• Report prepared by: Toolpusher/Company Man
• Submitted by: _____________ hrs daily
• Contents:
- Operations summary for last 24 hours
- Current depth and status
- Drilling parameters (WOB, RPM, GPM, SPP, ROP)
- Mud properties and pit volumes
- BOP status and test results
- Personnel on board
- HSE incidents and near misses
- Planned operations for next 24 hours
9.2 End of Well Report:
• Final well schematic with depths and casing sizes
• Final drilling parameters summary
• Bit records and dull grading
• Mud recap and chemical usage
• Time breakdown by operation
• Lessons learned and recommendations
10.1 H2S Monitoring:
• Fixed H2S sensors at: rig floor, shale shakers, mud pits, BOP area
• Personal H2S monitors for all personnel
• H2S monitors bump tested before each tour
• Wind direction indicator (windsock) visible from all areas
• Alarm set points: 10 ppm (caution), 15 ppm (warning), 20+ ppm (evacuate)
10.2 H2S Contingency Plan:
• Upon H2S alarm (10+ ppm):
1. All personnel don escape packs immediately
2. Move upwind to muster point
3. Account for all personnel
4. H2S team dons SCBA and investigates source
5. If increasing, evacuate non-essential personnel
• Escape packs located at: rig floor, catwalk, shale shakers, living quarters
• SCBA units at: rig floor, BOP area, safe zone
• Weekly H2S drills conducted
11.1 Waste Management:
• Cuttings disposal: ☐ Offshore discharge ☐ Cuttings reinjection ☐ Skip and ship
• Mud and chemical spills: Spill kits at all handling areas
• Used oil: Collected in labeled drums for recycling
• Domestic waste: Segregated and disposed ashore
11.2 Discharge Permits:
• All discharges comply with local regulations
• No discharge of oil or oily water
• Maintain discharge log
12.1 Emergency Contacts:
• Rig Medic: ______________ Channel: ____ Phone: ______________
• Onshore Base: ______________ Phone: ______________
• Coast Guard (offshore): Channel 16 / ______________
• Hospital: ______________ Phone: ______________
• Operator Emergency: ______________ Phone: ______________
12.2 Emergency Scenarios:
• WELL CONTROL EMERGENCY:
- Shut in well immediately
- Sound general alarm
- Muster at designated safe area
- Activate emergency response plan
- Notify operator and authorities
• H2S RELEASE:
- Don escape packs/SCBA
- Move upwind
- Account for personnel
- Investigate source with H2S team
• MEDICAL EMERGENCY:
- Call medic to location
- Administer first aid
- Prepare for evacuation if required
- Contact onshore base
• FIRE:
- Sound alarm
- Attempt to extinguish if safe
- Evacuate if fire grows
- Muster and account for all
12.3 Muster Points and Escape Routes:
• Primary Muster: ______________
• Secondary Muster: ______________
• Abandon Rig Muster (offshore): ______________
• Escape routes posted at all exits
Item Mon Tue Wed Thu Fri Sat Sun
Pre-tour safety meeting held ☐ ☐ ☐ ☐ ☐ ☐ ☐
BOP function test (weekly) N/A N/A N/A ☐ N/A N/A N/A
Well control drill conducted ☐ ☐ ☐ ☐ ☐ ☐ ☐
H2S monitor bump test ☐ ☐ ☐ ☐ ☐ ☐ ☐
SCBA/escape pack inspected ☐ ☐ ☐ ☐ ☐ ☐ ☐
Fire extinguishers checked ☐ ☐ ☐ ☐ ☐ ☐ ☐
Housekeeping inspection ☐ ☐ ☐ ☐ ☐ ☐ ☐
Spill kits inspected ☐ ☐ ☐ ☐ ☐ ☐ ☐
Communication systems tested ☐ ☐ ☐ ☐ ☐ ☐ ☐
Toolpusher Initials ___ ___ ___ ___ ___ ___ ___
The following documents are attached to this method statement:
☐ Detailed drilling program (Doc #: ______________)
☐ Well trajectory plan (if directional)
☐ BOP test procedure and records
☐ Mud program
☐ Cementing program
☐ H2S contingency plan
☐ Emergency response plan
☐ Rig acceptance checklist
☐ Safety case (if applicable)
☐ Environmental permit
This method statement has been reviewed and approved by the following:
Prepared By (Toolpusher):
Name: ______________ Signature: ______________ Date: ______________
Reviewed By (Drilling Superintendent):
Name: ______________ Signature: ______________ Date: ______________
Comments: ______________
Reviewed By (Company Man):
Name: ______________ Signature: ______________ Date: ______________
Comments: ______________
Approved By (Operator Representative):
Name: ______________ Signature: ______________ Date: ______________
Comments: ______________
This method statement has been distributed to:
☐ Toolpusher ☐ Driller ☐ Assistant Driller ☐ Derrickman
☐ Floorman (x_____) ☐ Mud Engineer ☐ Safety Officer ☐ Company Man
☐ Third Party Services ☐ Rig File ☐ Operator Office ☐ Regulatory Authority
ACKNOWLEDGMENT OF RECEIPT AND UNDERSTANDING:
I acknowledge that I have read, understood, and will comply with this drilling procedure method statement.
Name (Print) Signature Date
______________ ______________ ______________
______________ ______________ ______________
______________ ______________ ______________
______________ ______________ ______________
______________ ______________ ______________
______________ ______________ ______________
______________ ______________ ______________
______________ ______________ ______________