Free Safety Case Method Statement template for oil & gas you can edit online and download as PDF. Covers facility information, 3.0 safety case structure, 4.0 safety critical elements (sces) register.
METHOD STATEMENT ID: SC-MS-__________ DATE: ______________ REVISION: ______________
FACILITY/ RIG: ______________ LOCATION: ______________ FIELD: ______________
OPERATOR: ______________ REGULATORY BODY: ______________ VERIFICATION BODY: ________
SAFETY CASE TYPE: ☐ Design ☐ Operation ☐ Combined VALIDITY PERIOD: ______________ to ______________
2.0 REGULATORY REFERENCES:
• Offshore Installations (Safety Case) Regulations
• Health and Safety at Work Act
• Management of Health and Safety at Work Regulations
• Relevant national regulations (_____________)
SECTION 1: FACILITY DESCRIPTION
• Facility overview and layout
• Main systems and equipment
• Operational parameters
• Accommodation and manning levels
SECTION 2: SAFETY MANAGEMENT SYSTEM (SMS)
• Safety policy and objectives
• Organizational structure and responsibilities
• Competence and training
• Permit to work system
• Safety representatives and committees
SECTION 3: MAJOR HAZARD IDENTIFICATION
• Hazard identification process
• Major Accident Hazard (MAH) register
• Hydrocarbon releases
• Process safety risks
• Structural integrity risks
• Marine operations risks
• Dropped objects
• Ship collision
• Helicopter operations
• Fire and explosion
SECTION 4: RISK ASSESSMENT
• Quantitative Risk Assessment (QRA)
• Temporary Refuge (TR) impairment
• Escape, Evacuation and Rescue (EER) analysis
• Individual Risk Per Annum (IRPA)
• Societal risk (PLL)
• ALARP demonstration
SECTION 5: CONTROLS AND MITIGATIONS
• Primary controls (prevention)
• Secondary controls (detection and control)
• Tertiary controls (mitigation and EER)
• Performance standards
• Safety Critical Elements (SCEs)
• Verification scheme
SECTION 6: EMERGENCY RESPONSE
• Emergency Response Plan (ERP)
• Emergency organization and roles
• Muster and evacuation procedures
• Temporary Refuge (TR) procedures
• Rescue and first aid
• External emergency support
• Communication during emergencies
SECTION 7: WELL OPERATIONS (if applicable)
• Well control philosophy
• Well operations risk assessment
• Barrier philosophy
• BOP and well control equipment
• Simultaneous Operations (SIMOPS)
SECTION 8: PERFORMANCE MONITORING
• Safety performance indicators
• Audit schedule
• Inspection and maintenance
• Incident reporting and investigation
• Management review
SCE ID DESCRIPTION PERFORMANCE STANDARD VERIFICATION STATUS
SCE-01 Primary structure _____________ ☐ Verified ☐ OK
SCE-02 Process containment _____________ ☐ Verified ☐ OK
SCE-03 Emergency shutdown system _____________ ☐ Verified ☐ OK
SCE-04 Fire and gas detection _____________ ☐ Verified ☐ OK
SCE-05 Active fire protection _____________ ☐ Verified ☐ OK
SCE-06 Passive fire protection _____________ ☐ Verified ☐ OK
SCE-07 Temporary refuge _____________ ☐ Verified ☐ OK
SCE-08 Escape routes _____________ ☐ Verified ☐ OK
SCE-09 Lifeboats/ TEMPSC _____________ ☐ Verified ☐ OK
SCE-10 Helideck _____________ ☐ Verified ☐ OK
SCE-11 BOP system _____________ ☐ Verified ☐ OK
SCE-12 Wellhead/ Xmas tree _____________ ☐ Verified ☐ OK
HAZARD ID DESCRIPTION RISK LEVEL CONTROLS RESIDUAL RISK STATUS
MAH-01 Hydrocarbon release H/M/L _____________ H/M/L ☐ Managed
MAH-02 Well blowout H/M/L _____________ H/M/L ☐ Managed
MAH-03 Process fire H/M/L _____________ H/M/L ☐ Managed
MAH-04 Structural failure H/M/L _____________ H/M/L ☐ Managed
MAH-05 Ship collision H/M/L _____________ H/M/L ☐ Managed
MAH-06 Helicopter crash H/M/L _____________ H/M/L ☐ Managed
MAH-07 Dropped object H/M/L _____________ H/M/L ☐ Managed
MAH-08 H2S release H/M/L _____________ H/M/L ☐ Managed
Verification Body: ______________ Contact: ______________ Frequency: ______________
VERIFICATION ACTIVITIES:
• Independent examination of SCEs
• Review of SMS implementation
• Audit of safety critical procedures
• Examination of maintenance records
• Witnessing of tests and drills
• Reporting to regulatory body
Submission Date: ______________ Regulatory Body: ______________ Reference #: ______________
Acceptance Date: ______________ Valid Until: ______________
CONDITIONS OF ACCEPTANCE:
1. ______________
2. ______________
3. ______________
PREPARED BY: ______________ DATE: ______________ APPROVED: ______________ DATE: _____