Free Simops Procedure Method Statement template for oil & gas you can edit online and download as PDF. Covers simops information, 3.0 simops hazard identification, 4.0 simops risk assessment matrix.
METHOD STATEMENT ID: SIMOPS-MS-__________ DATE: ______________ REVISION: ______________
FACILITY/ RIG: ______________ LOCATION: ______________ FIELD: ______________
SIMOPS COORDINATOR: ______________ CONTACT: ______________ CHANNEL: ______________
OPERATIONS INVOLVED:
• Primary: ______________ • Secondary: ______________
• Tertiary: ______________ • Support: ______________
1.0 SCOPE: This procedure manages simultaneous operations to prevent interference and cumulative risk.
2.0 OPERATIONS DESCRIPTION:
Operation A: ______________ (Location: ______________, Duration: ______________)
Operation B: ______________ (Location: ______________, Duration: ______________)
Operation C: ______________ (Location: ______________, Duration: ______________)
INTERACTION HAZARDS:
1. Spatial Interference:
• Overlapping work areas? ☐ Yes ☐ No Location: ______________
• Common access/ egress routes? ☐ Yes ☐ No Mitigation: ______________
• Shared lifting zones? ☐ Yes ☐ No Mitigation: ______________
2. Temporal Interference:
• Simultaneous critical lifts? ☐ Yes ☐ No Mitigation: ______________
• Concurrent high-noise activities? ☐ Yes ☐ No Mitigation: ______________
• Shared equipment/ resources? ☐ Yes ☐ No Mitigation: ______________
3. Hazard Interaction:
• Dropped object zones overlapping? ☐ Yes ☐ No Mitigation: ______________
• Fire/ explosion sources near flammables?☐ Yes ☐ No Mitigation: ______________
• Pressure testing near other ops? ☐ Yes ☐ No Mitigation: ______________
• Hot work near hazardous areas? ☐ Yes ☐ No Mitigation: ______________
• H2S risk from one op affecting others? ☐ Yes ☐ No Mitigation: ______________
4. Communication Interference:
• Radio channel conflicts? ☐ Yes ☐ No Mitigation: ______________
• Alarm audibility concerns? ☐ Yes ☐ No Mitigation: ______________
• Language barriers? ☐ Yes ☐ No Mitigation: ______________
HAZARD LIKELIHOOD CONSEQUENCE RISK RATING CONTROL MEASURES RESIDUAL RISK
Spatial overlap ☐ H ☐ M ☐ L ☐ H ☐ M ☐ L ___________ ______________ ☐ H ☐ M ☐ L
Dropped objects ☐ H ☐ M ☐ L ☐ H ☐ M ☐ L ___________ ______________ ☐ H ☐ M ☐ L
Fire/ explosion ☐ H ☐ M ☐ L ☐ H ☐ M ☐ L ___________ ______________ ☐ H ☐ M ☐ L
Pressure release ☐ H ☐ M ☐ L ☐ H ☐ M ☐ L ___________ ______________ ☐ H ☐ M ☐ L
H2S release ☐ H ☐ M ☐ L ☐ H ☐ M ☐ L ___________ ______________ ☐ H ☐ M ☐ L
Crane ops ☐ H ☐ M ☐ L ☐ H ☐ M ☐ L ___________ ______________ ☐ H ☐ M ☐ L
Noise exposure ☐ H ☐ M ☐ L ☐ H ☐ M ☐ L ___________ ______________ ☐ H ☐ M ☐ L
Evacuation ☐ H ☐ M ☐ L ☐ H ☐ M ☐ L ___________ ______________ ☐ H ☐ M ☐ L
interference
CONTROL TYPE MEASURE RESPONSIBLE VERIFICATION
Engineering Controls Physical barriers _____________ ☐ Installed
Dedicated exclusion zones _____________ ☐ Marked
Segregated access _____________ ☐ Signed
Procedural Controls SIMOPS permit requirement _____________ ☐ Issued
Staggered work schedules _____________ ☐ Agreed
Synchronized lifting plans _____________ ☐ Approved
Common communication protocol _____________ ☐ Tested
Administrative Dedicated SIMOPS coordinator _____________ ☐ Assigned
Controls Regular coordination meetings _____________ ☐ Schedule
Common radio channel _____________ ☐ Established
Shared emergency plan _____________ ☐ Reviewed
Emergency Controls Combined emergency drill _____________ ☐ Scheduled
Mutual aid agreements _____________ ☐ Confirmed
Shared muster areas _____________ ☐ Designated
COMMUNICATION MATRIX:
Between: Method: Frequency: Responsible:
OIM & SIMOPS Coordinator Radio/ phone Continuous OIM
SIMOPS Coordinator & Ops A Lead Radio/ face-to-face Hourly SIMOPS Coord
SIMOPS Coordinator & Ops B Lead Radio/ face-to-face Hourly SIMOPS Coord
Ops A Lead & Crew Radio/ PA As needed Ops A Lead
Ops B Lead & Crew Radio/ PA As needed Ops B Lead
All parties SIMOPS meeting Daily 07:00 SIMOPS Coord
Emergency Communications: Channel 16 (offshore) / Channel ______________
Emergency Code Words:
• General Emergency: "SIMOPS ALERT"
• Evacuate Area A: "CODE RED - AREA A"
• All Clear: "SIMOPS ALL CLEAR"
A SIMOPS permit is required when:
☐ Operations overlap in same area
☐ Operations share equipment/ resources
☐ One operation creates hazard for another
☐ Cumulative noise > 85 dBA
☐ Multiple lifting operations within 50m
☐ Hot work near well operations
☐ Vessel operations near rig
SIMOPS PERMIT FORM:
Permit #: ______________ Date: ______________ Valid From: ______________ To: ______________
Operations Covered: ______________ Location: ______________
Key Hazards: ______________ Controls in Place: ______________
Issued By: ______________ Accepted By (Ops A): ______________
Accepted By (Ops B): ______________ Accepted By (Ops C): ______________
ZONE A: Operation A Area - Boundaries: ______________
• Access restrictions: ______________
• Required PPE: ______________
ZONE B: Operation B Area - Boundaries: ______________
• Access restrictions: ______________
• Required PPE: ______________
ZONE C: Shared Area - Boundaries: ______________
• Access protocol: ______________
• Time sharing schedule: ______________
PHYSICAL BARRIERS:
☐ Heras fencing at: ______________
☐ Warning tape at: ______________
☐ Signs posted at: ______________
☐ Physical segregation walls at: ______________
DATE: ______________ TIME: ______________ LOCATION: ______________ CHAIR: ______________
ATTENDEES: ______________
AGENDA ITEM DISCUSSION ACTION BY
Operations update - A ______________ ________ ______
Operations update - B ______________ ________ ______
Operations update - C ______________ ________ ______
Safety observations ______________ ________ ______
Hazards identified ______________ ________ ______
Coordination issues ______________ ________ ______
Next period plan ______________ ________ ______
Any other business ______________ ________ ______
SCENARIO: Emergency in Operation A area affecting Operation B
1. Operation A Lead declares emergency on common channel
2. SIMOPS Coordinator assesses impact on Operation B
3. If safe, Operation B continues with caution
4. If impacted, Operation B initiates safe shutdown
5. Both operations muster at designated points
6. Account for all personnel
7. Standby for further instructions
SCENARIO: Facility-wide emergency
1. General alarm sounded
2. ALL operations cease immediately
3. ALL personnel muster at primary muster point
4. SIMOPS Coordinator accounts for all personnel from all ops
5. Follow ERP for further actions
PREPARED BY: ______________ DATE: ______________ APPROVED: ______________ DATE: _____
ACKNOWLEDGMENT (All Operation Leads): 1. ______________ 2. ______________ 3. ______________