Rig Inspection Method Statement template

Free Rig Inspection Method Statement template for oil & gas you can edit online and download as PDF. Covers rig information, 3.0 daily inspection checklist, 4.0 weekly inspection checklist.

Rig Information

METHOD STATEMENT ID: RIGINSP-MS-__________ DATE: ______________ REVISION: ______________

RIG #: ______________ RIG TYPE: ☐ Land ☐ Jackup ☐ Semisub ☐ Drillship

LOCATION: ______________ OPERATOR: ______________ CONTRACTOR: ______________

INSPECTION TYPE: ☐ Pre-spud ☐ Weekly ☐ Monthly ☐ Annual ☐ Critical item

1.0 SCOPE: This procedure covers systematic inspection of all drilling rig equipment and systems.

2.0 RESPONSIBILITIES:

• Toolpusher: Overall inspection coordination • Driller: Floor & rotary equipment

• Chief Mechanic: Engines, pumps, mechanical systems • Chief Electrician: Electrical systems

• Safety Officer: Safety equipment, alarms, PPE • Third-party inspectors (as required)

3.0 Daily Inspection Checklist

AREA ITEM STATUS COMMENTS INSPECTOR

RIG FLOOR: Rotary table ☐ OK ☐ Not

Top drive ☐ OK ☐ Not

Iron roughneck ☐ OK ☐ Not

Slips/elevators ☐ OK ☐ Not

Tong dies ☐ OK ☐ Not

Drill line condition ☐ OK ☐ Not

Floor housekeeping ☐ OK ☐ Not

DRAWWORKS: Brake system ☐ OK ☐ Not

Drum/ spooling ☐ OK ☐ Not

Catheads ☐ OK ☐ Not

Guards ☐ OK ☐ Not

Oil levels ☐ OK ☐ Not

MUD PUMPS: Fluid end ☐ OK ☐ Not

Power end ☐ OK ☐ Not

Liners/pistons ☐ OK ☐ Not

Valves ☐ OK ☐ Not

Relief valve ☐ OK ☐ Not

BOP AREA: BOP stack condition ☐ OK ☐ Not

Accumulator pressure ☐ OK ☐ Not

Choke manifold ☐ OK ☐ Not

Kill manifold ☐ OK ☐ Not

Hoses/ lines ☐ OK ☐ Not

ENGINES: Oil levels ☐ OK ☐ Not

Coolant ☐ OK ☐ Not

Belts ☐ OK ☐ Not

Leaks ☐ OK ☐ Not

Exhaust system ☐ OK ☐ Not

SAFETY: Fire extinguishers ☐ OK ☐ Not

SCBA units ☐ OK ☐ Not

Escape packs ☐ OK ☐ Not

H2S monitors ☐ OK ☐ Not

First aid kits ☐ OK ☐ Not

Eye wash stations ☐ OK ☐ Not

Emergency showers ☐ OK ☐ Not

Alarms ☐ OK ☐ Not

4.0 Weekly Inspection Checklist

ITEM STATUS NEXT DUE INSPECTOR

Drill pipe inspection (visual) ☐ OK ☐ Not _____________ _________

Drill collars inspection ☐ OK ☐ Not _____________ _________

BOP function test ☐ OK ☐ Not _____________ _________

Accumulator pre-charge ☐ OK ☐ Not _____________ _________

Wire rope inspection (crown block) ☐ OK ☐ Not _____________ _________

Wire rope inspection (traveling block) ☐ OK ☐ Not _____________ _________

Wire rope inspection (dead line) ☐ OK ☐ Not _____________ _________

Deadline anchor inspection ☐ OK ☐ Not _____________ _________

Cranes and lifting equipment ☐ OK ☐ Not _____________ _________

Forklifts/ material handlers ☐ OK ☐ Not _____________ _________

Fuel tanks and piping ☐ OK ☐ Not _____________ _________

Mud tank agitators ☐ OK ☐ Not _____________ _________

Shale shakers ☐ OK ☐ Not _____________ _________

Degasser ☐ OK ☐ Not _____________ _________

Desander/ desilter ☐ OK ☐ Not _____________ _________

5.0 Monthly Inspection Checklist

ITEM STATUS NEXT DUE INSPECTOR

Drill pipe inspection (NDT) ☐ OK ☐ Not _____________ _________

BOP high pressure test ☐ OK ☐ Not _____________ _________

Accumulator pressure test ☐ OK ☐ Not _____________ _________

Derrick/ mast inspection ☐ OK ☐ Not _____________ _________

Substructure inspection ☐ OK ☐ Not _____________ _________

Guy wire tension ☐ OK ☐ Not _____________ _________

Crown-o-matic test ☐ OK ☐ Not _____________ _________

All safety valves tested ☐ OK ☐ Not _____________ _________

Electrical systems inspection ☐ OK ☐ Not _____________ _________

Lighting systems ☐ OK ☐ Not _____________ _________

Generators load test ☐ OK ☐ Not _____________ _________

Fuel and water tanks calibration ☐ OK ☐ Not _____________ _________

Fire detection system test ☐ OK ☐ Not _____________ _________

Gas detection system test ☐ OK ☐ Not _____________ _________

Emergency shutdown system test ☐ OK ☐ Not _____________ _________

6.0 Annual/ Third-Party Inspections

ITEM LAST DUE NEXT DUE COMPANY

API derrick/ mast certification ___________ ___________ _________

BOP recertification ___________ ___________ _________

Accumulator certification ___________ ___________ _________

Wire rope replacement ___________ ___________ _________

Crane load test ___________ ___________ _________

Pressure vessels inspection ___________ ___________ _________

Electrical certification ___________ ___________ _________

Fire system certification ___________ ___________ _________

Life raft inspection (offshore) ___________ ___________ _________

Immersion suits inspection (offshore) ___________ ___________ _________

7.0 Critical Item Inspection Procedure

7.1 Drill Line Inspection:

• Inspect for broken wires (max 6 per lay)

• Check for birdcaging, crushing, or kinks

• Measure diameter reduction (max 5%)

• Check lubrication condition

• Record ton-miles and slip/ cut program

7.2 BOP Stack Inspection:

• Visual inspection for damage, corrosion

• Check all bolts/ fasteners torque

• Verify ram type and size for current operation

• Inspect choke and kill lines for erosion

• Check all hydraulic connections

7.3 Traveling Equipment Inspection:

• Inspect traveling block sheaves

• Check hook condition and latch

• Inspect elevator links and ears

• Verify top drive swivel and IBOP function

8.0 Inspection Report Form

RIG #: ______________ DATE: ______________ INSPECTION TYPE: ______________

DEFICIENCY REPORT:

# Location Item Deficiency Description Corrective Action Due Date

1 _____________ _____________ ______________ ______________ ________

2 _____________ _____________ ______________ ______________ ________

3 _____________ _____________ ______________ ______________ ________

SUMMARY:

Total items inspected: ______________ Items OK: ______________ Deficiencies: ______________

Critical deficiencies: ______________ Corrected on spot: ______________ Pending: ______________

INSPECTOR: ______________ SIGNATURE: ______________ DATE: ______________

TOOLPUSHER REVIEW: ______________ SIGNATURE: ______________ DATE: ______________

PREPARED BY: ______________ DATE: ______________ APPROVED: ______________ DATE: _____

More templates