Environmental Protection Method Statement template

Free Environmental Protection Method Statement template for oil & gas you can edit online and download as PDF. Covers facility information, 3.0 waste management plan, 4.0 discharge permit requirements.

Facility Information

METHOD STATEMENT ID: ENV-MS-__________ DATE: ______________ REVISION: ______________

FACILITY/ RIG: ______________ LOCATION: ______________ FIELD: ______________

OPERATOR: ______________ ENVIRONMENTAL OFFICER: ______________ PERMIT #: ______________

OPERATION TYPE: ☐ Drilling ☐ Production ☐ Well Test ☐ Construction

1.0 SCOPE: This procedure ensures all operations comply with environmental regulations and minimize impact.

2.0 APPLICABLE REGULATIONS:

• MARPOL 73/78 (Annex I-V) • EPA Regulations (40 CFR)

• OPA 90 (Oil Pollution Act) • Local/ National Regulations

• Discharge Permits (NPDES/ equivalent) • Waste Management Regulations

3.0 Waste Management Plan

WASTE TYPE STORAGE METHOD DISPOSAL ROUTE MANIFEST REQUIRED

Oily water ☐ Tank ☐ Overboard (treated) ☐ Yes ☐ No

Oily rags/ absorbents ☐ Drum (red) ☐ Incineration/ shore ☐ Yes ☐ No

Used oil ☐ Drum (black) ☐ Recycling ☐ Yes ☐ No

Oil filters ☐ Drum (black) ☐ Recycling ☐ Yes ☐ No

Drilling cuttings ☐ Skip ☐ ☐ Overboard ☐ Shore ☐ Yes ☐ No

Spent mud ☐ Tank ☐ ☐ Overboard ☐ Shore ☐ Yes ☐ No

Chemical containers ☐ Skip/ pallet ☐ Recycling/ landfill ☐ Yes ☐ No

Domestic waste ☐ Skip ☐ Shore/ incineration ☐ Yes ☐ No

Food waste ☐ Skip ☐ Shore/ macerated ☐ Yes ☐ No

Medical waste ☐ Yellow drum ☐ Incineration ☐ Yes ☐ No

Scrap metal ☐ Skip ☐ Recycling ☐ Yes ☐ No

Batteries ☐ Drum (labeled) ☐ Recycling ☐ Yes ☐ No

Fluorescent tubes ☐ Drum (labeled) ☐ Recycling ☐ Yes ☐ No

Electronics ☐ Pallet ☐ Recycling ☐ Yes ☐ No

4.0 Discharge Permit Requirements

PERMITTED DISCHARGES:

4.1 Cuttings Discharge:

• Water-based mud cuttings: ☐ Permitted ☐ Not Permitted

• Oil-based mud cuttings: ☐ Permitted ☐ Not Permitted

• Synthetic-based cuttings: ☐ Permitted ☐ Not Permitted

• Discharge location: ______________ Water depth: ______________ ft

• Limitations: ______________

4.2 Produced Water Discharge:

• Treatment required: ☐ Yes ☐ No Method: ______________

• Oil in water limit: ______________ ppm (typical: 15-29 ppm)

• Monitoring frequency: ______________

• Sample retention: ______________ days

4.3 Cooling Water/ Ballast Discharge:

• Treatment required: ☐ Yes ☐ No

• Temperature limit: ______________ °F/°C

• Biocide residual limit: ______________ ppm

5.0 Spill Prevention And Response

5.1 Spill Prevention Measures:

• Secondary containment for all tanks and drums: ☐ In place ☐ Adequate

• Drip pans under all potential leak points: ☐ In place

• Transfer procedures posted: ☐ Yes

• Automatic shut-off on fuel transfers: ☐ Yes

• Regular inspection of hoses and connections: ☐ Yes

• Spill drills conducted: Frequency: ______________ Last: ______________

5.2 Spill Response Equipment Inventory:

EQUIPMENT LOCATION QUANTITY INSPECTED

Spill kits (general) ______________ _____ _____________

Spill kits (fuel areas) ______________ _____ _____________

Oil absorbent booms ______________ _____ ft _____________

Oil absorbent pads ______________ _____ bales _____________

Oil spill dispersant ______________ _____ gal _____________

Portable containment ______________ _____ _____________

Shovels/ brooms ______________ _____ _____________

Empty drums ______________ _____ _____________

Personal protective equipment ______________ _____ sets _____________

5.3 Spill Response Procedure:

MINOR SPILL (< _____ bbl):

1. Stop source if safe

2. Contain using spill kit materials

3. Notify supervisor

4. Clean up and dispose as hazardous waste

5. Document in spill log

MAJOR SPILL (≥ _____ bbl):

1. Stop source if safe

2. Sound alarm and notify IM

3. Activate emergency response plan

4. Deploy containment booms

5. Notify authorities (within required time)

6. Mobilize spill response team

7. Initiate cleanup

8. Complete full investigation and report

6.0 Waste Tracking And Manifest System

WASTE MANIFEST FORM:

Manifest #: ______________ Date: ______________

Waste Type: ______________ Quantity: ______________ (bbls/ lbs/ units)

Generator: ______________ Transporter: ______________

Destination Facility: ______________ Approval #: ______________

SHIPPER'S CERTIFICATION:

I certify that the above waste is properly described and packaged according to regulations.

Name: ______________ Signature: ______________ Date: ______________

TRANSPORTER ACKNOWLEDGMENT:

Name: ______________ Signature: ______________ Date: ______________

RECEIVER ACKNOWLEDGMENT:

Name: ______________ Signature: ______________ Date: ______________

7.0 Environmental Monitoring Program

7.1 Water Quality Monitoring:

PARAMETER FREQUENCY LOCATION ACTION LEVEL

Oil in water _____________ _____________ > _____________ ppm

pH _____________ _____________ < _____ or > _____

Turbidity _____________ _____________ > _____________ NTU

Dissolved oxygen _____________ _____________ < _____________ mg/L

Temperature _____________ _____________ > _____________ °F

7.2 Air Quality Monitoring:

PARAMETER FREQUENCY LOCATION ACTION LEVEL

H2S Continuous _____________ > 10 ppm

SO2 _____________ _____________ > _____________ ppm

NOx _____________ _____________ > _____________ ppm

Particulates _____________ _____________ > _____________ μg/m3

7.3 Discharge Sampling Log:

DATE TIME SAMPLE ID PARAMETER RESULT LIMIT COMPLIANT TECHNICIAN

______ _____ _________ _________ _______ _______ ☐ Yes ☐ No _________

______ _____ _________ _________ _______ _______ ☐ Yes ☐ No _________

______ _____ _________ _________ _______ _______ ☐ Yes ☐ No _________

8.0 Chemical Management

8.1 Chemical Inventory:

CHEMICAL NAME PRODUCT ID QUANTITY LOCATION MSDS AVAILABLE ENV DATA SHEET

______________ _________ _______ _________ ☐ Yes ☐ No ☐ Yes ☐ No

______________ _________ _______ _________ ☐ Yes ☐ No ☐ Yes ☐ No

______________ _________ _______ _________ ☐ Yes ☐ No ☐ Yes ☐ No

8.2 Chemical Handling Procedures:

• All chemicals must have approved environmental data sheet before use

• Secondary containment for all liquid chemicals

• Transfer areas have spill kits

• Chemical training for all handlers

• Monthly chemical inventory review

9.0 Environmental Training Records

TRAINING TOPIC FREQUENCY LAST TRAINING NEXT TRAINING TRAINER

Waste management Annual _____________ _____________ _________

Spill response Annual _____________ _____________ _________

Chemical handling Annual _____________ _____________ _________

Environmental awareness Annual _____________ _____________ _________

Discharge permit compliance Annual _____________ _____________ _________

MARPOL/ regulations Annual _____________ _____________ _________

PERSONNEL TRAINING LOG:

NAME JOB TITLE WASTE MGMT SPILL RESP CHEM HAND DATE TRAINER

_________ _________ ☐ ☐ ☐ _________ _________

_________ _________ ☐ ☐ ☐ _________ _________

10.0 Daily Environmental Checklist

ITEM STATUS COMMENTS INITIALS

All waste containers labeled correctly ☐ OK ☐ Not ______________ _______

Secondary containment free of liquid ☐ OK ☐ Not ______________ _______

Spill kits complete and accessible ☐ OK ☐ Not ______________ _______

No visible sheen on discharge water ☐ OK ☐ Not ______________ _______

Deck drains clear and clean ☐ OK ☐ Not ______________ _______

Drip pans in place under equipment ☐ OK ☐ Not ______________ _______

Chemical storage area secure ☐ OK ☐ Not ______________ _______

Waste storage area organized ☐ OK ☐ Not ______________ _______

Discharge monitoring equipment operational ☐ OK ☐ Not ______________ _______

Environmental permit posted ☐ OK ☐ Not ______________ _______

11.0 Incident Reporting

REPORTABLE INCIDENTS:

• Any spill to environment (any size)

• Exceedance of discharge permit limits

• Non-compliance with regulations

• Wildlife impact

• Community complaint

REPORTING REQUIREMENTS:

• Internal report: Within 24 hours

• Regulatory report: Within _____________ hours to _____________

• Spill hotline: ______________

INCIDENT REPORT FORM:

Date: ______________ Time: ______________ Location: ______________

Incident Type: ______________ Description: ______________

Quantity Released: ______________ Material: ______________

Cause: ______________ Actions Taken: ______________

Reported To: ______________ Time Reported: ______________

Corrective Actions: ______________

Prepared By: ______________ Date: ______________

PREPARED BY: ______________ DATE: ______________ APPROVED: ______________ DATE: _____

ENVIRONMENTAL OFFICER: ______________ DATE: ______________

More templates