Well Control Risk Assessment template

Free Well Control Risk Assessment template for oil & gas you can edit online and download as PDF. Covers well information, well control equipment status and certification, well control drills and personnel competency.

Well Information

ASSESSMENT ID: WCL-__________ DATE: ______________ TIME: ______________

WELL NAME: ______________ WELL ID: ______________ FIELD: ______________

OPERATOR: ______________ CONTRACTOR: ______________ RIG: ______________

WELL TYPE: Exploration ☐ Development ☐ Injection ☐ Production ☐

WELL STATUS: Drilling ☐ Completing ☐ Producing ☐ Workover ☐ Abandoned ☐

CURRENT DEPTH: _____________ ft/m TARGET DEPTH: _____________ ft/m WATER DEPTH: _____________ ft/m

Well Control Risk Assessment Matrix - Iadc Well Control Guidelines

BARRIER ELEMENTFAILURE SCENARIOPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (A-E)RISK INDEX
Primary Well Control (Mud Column)-Inadequate mud weight
-Lost circulation
-Swabbing
-Surge
-Gas cut mud
-Insufficient hole fill
-Influx/ Kick
-Underground flow
-Formation fracture
-Well control event
-Mud program design
-ECD monitoring
-Trip schedules
-Mud treatment
-PWD tool
3 (Occasional)D (Hazardous)9 (HIGH)
Secondary Well Control (BOP System)-BOP component failure
-Annular preventer leak
-Pipe ram seal failure
-Shear ram fails to cut
-Control system leak
-Blowout
-Uncontrolled release
-Fire/Explosion
-Platform loss
-Loss of life
-Environmental damage
-BOP testing schedule
-Function tests
-Control system redundancy
-Accumulator capacity
-Remote operation
2 (Remote)E (Catastrophic)8 (HIGH)
Tertiary Well Control (Kill Methods)-Kill line failure
-Choke line failure
-Choke manifold failure
-Pump failure
-Insufficient kill mud volume
-Underground blowout
-Broken casing
-Lost well
-Underground communication
-Relief well required
-Kill mud preparation
-Dynamic kill
-Volumetric method
-Lubricate & bleed
-Relief well planning
2 (Remote)E (Catastrophic)8 (HIGH)
Casing/ Cement Barriers-Casing collapse
-Casing burst
-Shoe failure
-Zonal isolation failure
-Micro-annulus
-Channeling
-Loss of well control
-Underground blowout
-Gas migration
-Sustained casing pressure (SCP)
-Casing design
-Centralization
-Cement slurry design
-Cement evaluation
-CBL/VDL logs
2 (Remote)E (Catastrophic)8 (HIGH)
Subsea BOP Systems (Offshore)-MUX control pod failure
-LMRP connector failure
-Flex joint failure
-Choke/ kill line failure
-Hydraulic connector leak
-Inability to close BOP
-Blowout
-Riser disconnect unable
-Environmental release
-ROV intervention
-Acoustic backup
-Deadman auto shear
-Autoshear
-Docking station
-Redundant pods
2 (Remote)E (Catastrophic)8 (HIGH)
Detection & Monitoring Systems-Kick detection delay
-Gas detection failure
-Pit volume totalizer malfunction
-Flow sensor failure
-Gas trap malfunction
-Delayed response
-Rapid escalation
-Larger influx volume
-Well control event
-Flow show indicators
-Trip tank monitoring
-Pit volume totalizer
-Gas detectors
-Mud logging
-DCS alarms
3 (Occasional)D (Hazardous)9 (HIGH)

Well Control Equipment Status And Certification

BOP STACK DETAILS:

COMPONENT ________ Annular Preventer Pipe Ram (Top) Pipe Ram (Middle) Variable Bore Ram Blind/Shear Ram Casing Ram Choke Line Valve Kill Line ValveSIZE ____ ____ ____ ____ ____ ____ ____ ____ ____RATING ______ ______ ______ ______ ______ ______ ______ ______ ______MFG ____ ____ ____ ____ ____ ____ ____ ____ ____MODEL _____ _____ _____ _____ _____ _____ _____ _____ _____LAST TESTED ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________LAST FUNCTION _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________STATUS ________ Operational Operational Operational Operational Operational Operational Operational OperationalNEXT DUE ________ ________ ________ ________ ________ ________ ________ ________ ________

BOP CONTROL SYSTEM:

CONTROL SYSTEM PARAMETER ________ Accumulator Operating Pressure Accumulator Pre-charge Pressure Accumulator Fluid Volume Regulator Pressure Setting Manifold Pressure Control Fluid Level USB Voltage Nitrogen Backup PressureVALUE ________ _____________ psi _____________ psi _____________ gal _____________ psi _____________ psi _____________ % _____________ VDC _____________ psiSTATUS _________ Good/Low Good/Low Adequate/Insufficient Good/Low Good/Low Good/Low Good/Low Good/LowLAST CHECK __________ __________ __________ __________ __________ __________ __________ __________ __________NEXT CHECK ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________

CHOKE MANIFOLD:

COMPONENT ________ Remote Choke (Primary) Remote Choke (Secondary) Manual Choke Upstream Valve Downstream Valve Pressure Gauges Buffer Tank Flare Line ValveSIZE ____ ____ ____ ____ ____ ____ ____ ____ ____RATING ______ ______ ______ ______ ______ ______ ______ ______ ______LAST TEST __________ __________ __________ __________ __________ __________ N/A __________ __________LAST CAL _________ _________ _________ _________ N/A N/A _________ N/A N/ASTATUS ________ Operational Operational Operational Operational Operational Operational Operational OperationalREMARKS ________ ________ ________ ________ ________ ________ ________ ________ ________

Well Control Drills And Personnel Competency

WELL CONTROL DRILLS:

DRILL TYPE ________ Kick Detection Drill Trip Drill/Margin Drill BOP Function Test Choke Drill Diverter Drill Strip/Stripping Drill Riser Gas Handling Drill Emergency Disconnect Drill (Offshore)FREQUENCY _________ Weekly Weekly Weekly Monthly Monthly Quarterly Quarterly QuarterlyLAST DRILL __________ __________ __________ __________ __________ __________ __________ __________ __________NEXT DUE ________ ________ ________ ________ ________ ________ ________ ________ ________RESPONSE TIME _____________ ________ min ________ min ________ min ________ min ________ min ________ min ________ min ________ minPERFORMANCE ________ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐NOTES _______ _______ _______ _______ _______ _______ _______ _______ _______

PERSONNEL WELL CONTROL CERTIFICATION:

NAME ________ ________ ________ ________ ________ ________ ________POSITION _____________ _____________ _____________ _____________ _____________ _____________ _____________CERT LEVEL __________ __________ __________ __________ __________ __________ __________CERT DATE __________ __________ __________ __________ __________ __________ __________EXPIRE DATE ___________ ___________ ___________ ___________ ___________ ___________ ___________LAST ASSESS ___________ ___________ ___________ ___________ ___________ ___________ ___________COMPETENCY _____________ Level 1-5 Level 1-5 Level 1-5 Level 1-5 Level 1-5 Level 1-5

IADC WELL CONTROL CERTIFICATION LEVELS:

Level 1: Introductory / Awareness

Level 2: Drilling Operations (Driller, Asst Driller, Operator Rep)

Level 3: Drilling Supervisor / OIM

Level 4: Workover / Completion Operations

Level 5: Well Control Instructor

Kill Mud Availability And Capabilities

KILL MUD RESOURCES:

MUD TYPE ________ Primary Kill Mud Secondary Kill Mud Heavy Weight Pill Base Oil/Crude Fresh Water Barite Inventory Bentonite Inventory Chemical AdditivesWEIGHT (ppg) ____________ ____________ ____________ ____________ ____________ ____________ N/A N/A N/AVOLUME AVAIL _____________ ________ bbl ________ bbl ________ bbl ________ bbl ________ bbl ________ tons ________ tons ________ lbsMIX RATE CAP ____________ ________ bph ________ bph N/A ________ bph ________ bph ________ ton/hr ________ ton/hr N/AREMARKS/STORAGE LOC ________ ________ ________ ________ ________ ________ ________ ________ ________

MIXING AND PUMPING CAPABILITIES:

PUMP/EQUIPMENT ________ Mud Pump #1 Mud Pump #2 Cement Unit Mud Mixer Mud Gas Separator DegasserTYPE _____________ _____________ _____________ _____________ _____________ _____________ _____________MAX PRESSURE ____________ ________ psi ________ psi ________ psi N/A N/A N/AMAX RATE ________ ________ ________ ________ ________ ________ ________STATUS _________ Ready Ready Available Ready Ready ReadyLAST TEST _________ _________ _________ _________ _________ _________ _________REMARKS ________ ________ ________ ________ ________ ________ ________

Shallow Gas / Shallow Water Flow Hazards (Offshore)

SHALLOW HAZARD ASSESSMENT:

HAZARD TYPE ________ Shallow Gas Shallow Water Flow Shallow Overpressure Gas HydratesDEPTH RANGE ___________ ____ - ____ ____ - ____ ____ - ____ ____ - ____PROBABILITY ____________ Low/Med/High Low/Med/High Low/Med/High Low/Med/HighDETECTION METHOD ________ SBP / 3D Seismic SBP / 3D Seismic Seismic / Offsets Seismic / LogsMITIGATION MEASURES ________ Diverter / Displace / Pump ahead Weight up / Pump ahead Mud weight / Casing point Inhibited mud / Cool mud

DIVERTER SYSTEM STATUS:

COMPONENT ________ Diverter Housing/Packing Diverter Line Valves Vent Line Diverter Control SystemSIZE ____ ____ ____ ____ ____RATING ______ ______ ______ ______ N/ALAST TEST __________ __________ __________ __________ __________STATUS _________ Operational Operational Clear OperationalREMARKS ________ ________ ________ ________ ________

Kick Tolerance And Well Control Procedures

KICK TOLERANCE CALCULATIONS:

PARAMETER ________ Current Mud Weight Formation Integrity Test (FIT) Leak-Off Test (LOT) Maximum Allowable Annular Surface Pressure (MAASP) Kick Tolerance at Current Depth Maximum Influx Height Dynamic Kick ToleranceVALUE ________ _____________ ppg _____________ ppg EMW _____________ ppg EMW _____________ psi _____________ bbl _____________ ft _____________ ppgREMARKS ________ Date: _____________ Depth: _____________ Date: _____________ Depth: _____________ Based on casing burst/shoe strength Maximum influx volume before fracture While circulating

WELL CONTROL PROCEDURES:

☐ Drillers Method - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________

☐ Wait & Weight Method - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________

☐ Volumetric Method - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________

☐ Lubricate & Bleed - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________

☐ Bullheading - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________

☐ Snubbing/Stripping - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________

☐ Riser Gas Handling - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________

Action Plan And Corrective Actions

#ACTION REQUIREDRESPONSIBLEDUE DATESTATUS
1 2 3 4 5________ ________ ________ ________ _____________________ _____________ _____________ _____________ __________________________ _____________ _____________ _____________ _____________Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐

Assessment Team And Approval

ASSESSMENT TEAM:

Name: ______________ Title: ______________ Signature: ______________

Name: ______________ Title: ______________ Signature: ______________

Name: ______________ Title: ______________ Signature: ______________

Name: ______________ Title: ______________ Signature: ______________

APPROVALS:

Operations Manager: ______________ Date: ______________ Signature: ______________

Drilling Superintendent: ______________ Date: ______________ Signature: ______________

Company Man: ______________ Date: ______________ Signature: ______________

Toolpusher: ______________ Date: ______________ Signature: ______________

REVIEW DATE: ______________ NEXT REVIEW DATE: ______________