Free Well Control Risk Assessment template for oil & gas you can edit online and download as PDF. Covers well information, well control equipment status and certification, well control drills and personnel competency.
ASSESSMENT ID: WCL-__________ DATE: ______________ TIME: ______________
WELL NAME: ______________ WELL ID: ______________ FIELD: ______________
OPERATOR: ______________ CONTRACTOR: ______________ RIG: ______________
WELL TYPE: Exploration ☐ Development ☐ Injection ☐ Production ☐
WELL STATUS: Drilling ☐ Completing ☐ Producing ☐ Workover ☐ Abandoned ☐
CURRENT DEPTH: _____________ ft/m TARGET DEPTH: _____________ ft/m WATER DEPTH: _____________ ft/m
| BARRIER ELEMENT | FAILURE SCENARIO | POTENTIAL CONSEQUENCE | EXISTING CONTROLS | LIKELIHOOD (1-5) | SEVERITY (A-E) | RISK INDEX |
|---|---|---|---|---|---|---|
| Primary Well Control (Mud Column) | -Inadequate mud weight -Lost circulation -Swabbing -Surge -Gas cut mud -Insufficient hole fill | -Influx/ Kick -Underground flow -Formation fracture -Well control event | -Mud program design -ECD monitoring -Trip schedules -Mud treatment -PWD tool | 3 (Occasional) | D (Hazardous) | 9 (HIGH) |
| Secondary Well Control (BOP System) | -BOP component failure -Annular preventer leak -Pipe ram seal failure -Shear ram fails to cut -Control system leak | -Blowout -Uncontrolled release -Fire/Explosion -Platform loss -Loss of life -Environmental damage | -BOP testing schedule -Function tests -Control system redundancy -Accumulator capacity -Remote operation | 2 (Remote) | E (Catastrophic) | 8 (HIGH) |
| Tertiary Well Control (Kill Methods) | -Kill line failure -Choke line failure -Choke manifold failure -Pump failure -Insufficient kill mud volume | -Underground blowout -Broken casing -Lost well -Underground communication -Relief well required | -Kill mud preparation -Dynamic kill -Volumetric method -Lubricate & bleed -Relief well planning | 2 (Remote) | E (Catastrophic) | 8 (HIGH) |
| Casing/ Cement Barriers | -Casing collapse -Casing burst -Shoe failure -Zonal isolation failure -Micro-annulus -Channeling | -Loss of well control -Underground blowout -Gas migration -Sustained casing pressure (SCP) | -Casing design -Centralization -Cement slurry design -Cement evaluation -CBL/VDL logs | 2 (Remote) | E (Catastrophic) | 8 (HIGH) |
| Subsea BOP Systems (Offshore) | -MUX control pod failure -LMRP connector failure -Flex joint failure -Choke/ kill line failure -Hydraulic connector leak | -Inability to close BOP -Blowout -Riser disconnect unable -Environmental release | -ROV intervention -Acoustic backup -Deadman auto shear -Autoshear -Docking station -Redundant pods | 2 (Remote) | E (Catastrophic) | 8 (HIGH) |
| Detection & Monitoring Systems | -Kick detection delay -Gas detection failure -Pit volume totalizer malfunction -Flow sensor failure -Gas trap malfunction | -Delayed response -Rapid escalation -Larger influx volume -Well control event | -Flow show indicators -Trip tank monitoring -Pit volume totalizer -Gas detectors -Mud logging -DCS alarms | 3 (Occasional) | D (Hazardous) | 9 (HIGH) |
BOP STACK DETAILS:
| COMPONENT ________ Annular Preventer Pipe Ram (Top) Pipe Ram (Middle) Variable Bore Ram Blind/Shear Ram Casing Ram Choke Line Valve Kill Line Valve | SIZE ____ ____ ____ ____ ____ ____ ____ ____ ____ | RATING ______ ______ ______ ______ ______ ______ ______ ______ ______ | MFG ____ ____ ____ ____ ____ ____ ____ ____ ____ | MODEL _____ _____ _____ _____ _____ _____ _____ _____ _____ | LAST TESTED ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ | LAST FUNCTION _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ | STATUS ________ Operational Operational Operational Operational Operational Operational Operational Operational | NEXT DUE ________ ________ ________ ________ ________ ________ ________ ________ ________ |
|---|
BOP CONTROL SYSTEM:
| CONTROL SYSTEM PARAMETER ________ Accumulator Operating Pressure Accumulator Pre-charge Pressure Accumulator Fluid Volume Regulator Pressure Setting Manifold Pressure Control Fluid Level USB Voltage Nitrogen Backup Pressure | VALUE ________ _____________ psi _____________ psi _____________ gal _____________ psi _____________ psi _____________ % _____________ VDC _____________ psi | STATUS _________ Good/Low Good/Low Adequate/Insufficient Good/Low Good/Low Good/Low Good/Low Good/Low | LAST CHECK __________ __________ __________ __________ __________ __________ __________ __________ __________ | NEXT CHECK ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ |
|---|
CHOKE MANIFOLD:
| COMPONENT ________ Remote Choke (Primary) Remote Choke (Secondary) Manual Choke Upstream Valve Downstream Valve Pressure Gauges Buffer Tank Flare Line Valve | SIZE ____ ____ ____ ____ ____ ____ ____ ____ ____ | RATING ______ ______ ______ ______ ______ ______ ______ ______ ______ | LAST TEST __________ __________ __________ __________ __________ __________ N/A __________ __________ | LAST CAL _________ _________ _________ _________ N/A N/A _________ N/A N/A | STATUS ________ Operational Operational Operational Operational Operational Operational Operational Operational | REMARKS ________ ________ ________ ________ ________ ________ ________ ________ ________ |
|---|
WELL CONTROL DRILLS:
| DRILL TYPE ________ Kick Detection Drill Trip Drill/Margin Drill BOP Function Test Choke Drill Diverter Drill Strip/Stripping Drill Riser Gas Handling Drill Emergency Disconnect Drill (Offshore) | FREQUENCY _________ Weekly Weekly Weekly Monthly Monthly Quarterly Quarterly Quarterly | LAST DRILL __________ __________ __________ __________ __________ __________ __________ __________ __________ | NEXT DUE ________ ________ ________ ________ ________ ________ ________ ________ ________ | RESPONSE TIME _____________ ________ min ________ min ________ min ________ min ________ min ________ min ________ min ________ min | PERFORMANCE ________ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐ Satisfactory ☐ Needs Improv ☐ | NOTES _______ _______ _______ _______ _______ _______ _______ _______ _______ |
|---|
PERSONNEL WELL CONTROL CERTIFICATION:
| NAME ________ ________ ________ ________ ________ ________ ________ | POSITION _____________ _____________ _____________ _____________ _____________ _____________ _____________ | CERT LEVEL __________ __________ __________ __________ __________ __________ __________ | CERT DATE __________ __________ __________ __________ __________ __________ __________ | EXPIRE DATE ___________ ___________ ___________ ___________ ___________ ___________ ___________ | LAST ASSESS ___________ ___________ ___________ ___________ ___________ ___________ ___________ | COMPETENCY _____________ Level 1-5 Level 1-5 Level 1-5 Level 1-5 Level 1-5 Level 1-5 |
|---|
IADC WELL CONTROL CERTIFICATION LEVELS:
Level 1: Introductory / Awareness
Level 2: Drilling Operations (Driller, Asst Driller, Operator Rep)
Level 3: Drilling Supervisor / OIM
Level 4: Workover / Completion Operations
Level 5: Well Control Instructor
KILL MUD RESOURCES:
| MUD TYPE ________ Primary Kill Mud Secondary Kill Mud Heavy Weight Pill Base Oil/Crude Fresh Water Barite Inventory Bentonite Inventory Chemical Additives | WEIGHT (ppg) ____________ ____________ ____________ ____________ ____________ ____________ N/A N/A N/A | VOLUME AVAIL _____________ ________ bbl ________ bbl ________ bbl ________ bbl ________ bbl ________ tons ________ tons ________ lbs | MIX RATE CAP ____________ ________ bph ________ bph N/A ________ bph ________ bph ________ ton/hr ________ ton/hr N/A | REMARKS/STORAGE LOC ________ ________ ________ ________ ________ ________ ________ ________ ________ |
|---|
MIXING AND PUMPING CAPABILITIES:
| PUMP/EQUIPMENT ________ Mud Pump #1 Mud Pump #2 Cement Unit Mud Mixer Mud Gas Separator Degasser | TYPE _____________ _____________ _____________ _____________ _____________ _____________ _____________ | MAX PRESSURE ____________ ________ psi ________ psi ________ psi N/A N/A N/A | MAX RATE ________ ________ ________ ________ ________ ________ ________ | STATUS _________ Ready Ready Available Ready Ready Ready | LAST TEST _________ _________ _________ _________ _________ _________ _________ | REMARKS ________ ________ ________ ________ ________ ________ ________ |
|---|
SHALLOW HAZARD ASSESSMENT:
| HAZARD TYPE ________ Shallow Gas Shallow Water Flow Shallow Overpressure Gas Hydrates | DEPTH RANGE ___________ ____ - ____ ____ - ____ ____ - ____ ____ - ____ | PROBABILITY ____________ Low/Med/High Low/Med/High Low/Med/High Low/Med/High | DETECTION METHOD ________ SBP / 3D Seismic SBP / 3D Seismic Seismic / Offsets Seismic / Logs | MITIGATION MEASURES ________ Diverter / Displace / Pump ahead Weight up / Pump ahead Mud weight / Casing point Inhibited mud / Cool mud |
|---|
DIVERTER SYSTEM STATUS:
| COMPONENT ________ Diverter Housing/Packing Diverter Line Valves Vent Line Diverter Control System | SIZE ____ ____ ____ ____ ____ | RATING ______ ______ ______ ______ N/A | LAST TEST __________ __________ __________ __________ __________ | STATUS _________ Operational Operational Clear Operational | REMARKS ________ ________ ________ ________ ________ |
|---|
KICK TOLERANCE CALCULATIONS:
| PARAMETER ________ Current Mud Weight Formation Integrity Test (FIT) Leak-Off Test (LOT) Maximum Allowable Annular Surface Pressure (MAASP) Kick Tolerance at Current Depth Maximum Influx Height Dynamic Kick Tolerance | VALUE ________ _____________ ppg _____________ ppg EMW _____________ ppg EMW _____________ psi _____________ bbl _____________ ft _____________ ppg | REMARKS ________ Date: _____________ Depth: _____________ Date: _____________ Depth: _____________ Based on casing burst/shoe strength Maximum influx volume before fracture While circulating |
|---|
WELL CONTROL PROCEDURES:
☐ Drillers Method - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________
☐ Wait & Weight Method - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________
☐ Volumetric Method - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________
☐ Lubricate & Bleed - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________
☐ Bullheading - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________
☐ Snubbing/Stripping - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________
☐ Riser Gas Handling - Procedure Posted: Yes ☐ No ☐ Last Reviewed: _____________
| # | ACTION REQUIRED | RESPONSIBLE | DUE DATE | STATUS | ||
|---|---|---|---|---|---|---|
| 1 2 3 4 5 | ________ ________ ________ ________ ________ | _____________ _____________ _____________ _____________ _____________ | _____________ _____________ _____________ _____________ _____________ | Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ |
ASSESSMENT TEAM:
Name: ______________ Title: ______________ Signature: ______________
Name: ______________ Title: ______________ Signature: ______________
Name: ______________ Title: ______________ Signature: ______________
Name: ______________ Title: ______________ Signature: ______________
APPROVALS:
Operations Manager: ______________ Date: ______________ Signature: ______________
Drilling Superintendent: ______________ Date: ______________ Signature: ______________
Company Man: ______________ Date: ______________ Signature: ______________
Toolpusher: ______________ Date: ______________ Signature: ______________
REVIEW DATE: ______________ NEXT REVIEW DATE: ______________