Free Simultaneous Operations (Simops) Risk Assessment template for oil & gas you can edit online and download as PDF. Covers simops information, simultaneous operations matrix, current simops activities assessment.
ASSESSMENT ID: SIM-__________ DATE: ______________ TIME: ______________
FACILITY NAME: ______________ LOCATION: ______________ AREA: ______________
SIMOPS COORDINATOR: ______________ VALIDITY PERIOD: FROM: ______________ TO: ______________
DESCRIPTION OF SIMOPS ACTIVITIES: ______________
______________
LEGEND: = Compatible (No restrictions) = Caution (Requires controls) = Not Permitted (Exclusive)
= Hazardous interaction (Special permit required)
| ACTIVITY 1 | ACTIVITY 2 | COMPATIBILITY | KEY INTERACTION HAZARDS | REQUIRED CONTROLS | PERMIT REQUIRED |
|---|---|---|---|---|---|
| Drilling Operations | Production Operations | / | -Gas release ignition -Well control event -Dropped objects -Communication failure | -Gas detection -ESD coordination -Isolation zones -Communication | ☐ SIMOPS Permit ☐ Hot Work ☐ PTW |
| Drilling Operations | Lifting Operations | -Load over live equip -Crane/rig conflicts -Swing radius overlap -Dropped objects | -Exclusion zones -Lifting plan -Banksman -Communication | ☐ SIMOPS Permit ☐ Lifting ☐ PTW | |
| Drilling Operations (Offshore) | Vessel Operations (Supply) | -Vessel collision -Riser damage -Mooring conflicts -Transfer operations | -Watch circle -DP trials -Fender systems -Communication | ☐ SIMOPS Permit ☐ Marine ☐ PTW | |
| Production Operations | Lifting Operations | -Load over process -Ignition sources -Dropped objects -Process release | -Barricading -Hot work permit -Exclusion zones -Communication | ☐ SIMOPS Permit ☐ Lifting ☐ PTW | |
| Production Operations | Maintenance (Non-hot) | / | -Process isolation -Equipment start-up -Pressure/energy sources -Personnel safety | -LOTO -Isolation -Boundary limits -Communication | ☐ SIMOPS Permit ☐ PTW ☐ LOTO |
| Production Operations | Hot Work (Welding) | / | -Ignition sources -Fire/explosion -Hydrocarbon release -Personnel injury | -Gas testing -Fire watch -Cover/flange -Isolation | ☐ SIMOPS Permit ☐ Hot Work ☐ PTW ☐ Gas Test |
| Lifting Operations (Multiple cranes) | Lifting Operations | / (Same zone) | -Crane/crane conflict -Load collision -Communication failure -Swing radius overlap | -One crane at a time -Lifting plan -Supervisor | ☐ SIMOPS Permit ☐ Lifting ☐ PTW |
| Lifting Operations | Personnel Activities | -Load over personnel -Dropped objects -Crane movement -Communication | -Exclusion zones -Barricading -Banksman -Communication | ☐ SIMOPS Permit ☐ Lifting ☐ PTW | |
| Construction / Fabrication (Hot work) | Production Operations | / | -Ignition sources -Fire/explosion -Process release -Personnel injury | -Gas testing -Fire watch -Isolation -Boundary limits | ☐ SIMOPS Permit ☐ Hot Work ☐ PTW |
| Diving Operations | All other operations | (Within dive zone) | -Diver entanglement -Vessel collision -Crane operations -Pressure in equipment | -Exclusion zone -Dive plan -Communications -Standby diver | ☐ SIMOPS Permit ☐ Marine ☐ PTW |
ACTIVITY 1: ______________ PRIORITY: High ☐ Med ☐ Low ☐
ACTIVITY 2: ______________ PRIORITY: High ☐ Med ☐ Low ☐
ACTIVITY 3: ______________ PRIORITY: High ☐ Med ☐ Low ☐
ACTIVITY 4: ______________ PRIORITY: High ☐ Med ☐ Low ☐
INTERACTION HAZARDS IDENTIFIED:
| HAZARD SCENARIO ________ ________ ________ ________ ________ | LIKELIHOOD __________ __________ __________ __________ __________ | SEVERITY _________ _________ _________ _________ _________ | RISK _____ _____ _____ _____ _____ | CONTROLS REQUIRED ________ ________ ________ ________ ________ |
|---|
COMMUNICATION PROTOCOLS:
| ☐ Dedicated SIMOPS radio channel - Channel: _______ Monitored by: ______________ ☐ Pre-job coordination meeting - Time: ______________ Attendees: All supervisors ☐ Daily SIMOPS meeting - Time: ______________ Location: ______________ ☐ Activity status board - Location: ______________ Updated by: ______________ ☐ Handover communication - Shift change time: ______________ Process: ______________ |
|---|
ZONING AND BARRIERS:
| ZONE/AREA ________ ________ ________ ________ Exclusion Zone Hot Work Area Process Area | ACTIVITY ________ ________ ________ ________ Lifting Welding Production | HAZARD TYPE __________ __________ __________ __________ Dropped objects Ignition source Release | BOUNDARIES __________ __________ __________ __________ ___m radius ___m radius Entire unit | ACCESS CONTROL ________ ________ ________ ________ Barricades Fire blankets Gate access | SIGNAGE _______ _______ _______ _______ Yes Yes Yes | STATUS ________ Active ☐ Active ☐ Active ☐ Established ☐ Established ☐ Operational ☐ |
|---|
TEMPORARY CONTROLS:
| CONTROL MEASURE ________ Blast mats Fire blankets Water curtains Temporary wind walls Additional gas monitors Temporary lighting | APPLIES TO ACTIVITY ________ Drilling/Production Hot Work Area Process Area Lifting Zone All Areas Work Areas | INSTALLED __________ Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No | VERIFIED BY ____________ ____________ ____________ ____________ ____________ ____________ ____________ | REMOVAL DATE _____________ _____________ _____________ _____________ _____________ _____________ _____________ | STATUS ____________ In Place ☐ In Place ☐ Active ☐ Installed ☐ Active ☐ Active ☐ |
|---|
PERMIT MATRIX FOR CURRENT ACTIVITIES:
| PERMIT TYPE ________ SIMOPS Permit Hot Work Permit Confined Space Lift Plan Isolation/LOTO Ground Disturbance Radioactive Source | ACTIVITY 1 __________ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ | ACTIVITY 2 __________ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ | ACTIVITY 3 __________ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ | ACTIVITY 4 __________ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ | ISSUED BY _________ _________ _________ _________ _________ _________ _________ _________ | VALID UNTIL ________ ________ ________ ________ ________ ________ ________ ________ |
|---|
ACTIVITY PAIR: Drilling Operations & Production Operations
| CONTROL MEASURE ________ Continuous gas monitoring in both areas ESD system test & coordination Communication check between driller and control room Exclusion zone around wellhead Stop work authority emphasized Simultaneous drilling/production procedure review | RESPONSIBLE ___________ Operator Driller/OIM Both Operator Supervisor OIM | VERIFICATION ____________ Log check Function test Radio check Walk down Toolbox talk Review | FREQUENCY _________ Continuous Daily Hourly Per shift Daily Pre-job | STATUS ________ Active ☐ Complete ☐ Active ☐ Established ☐ Completed ☐ Approved ☐ |
|---|
ACTIVITY PAIR: Lifting Operations & Personnel Activities
| CONTROL MEASURE ________ Barricade lift zone Exclusion zone - no personnel under load Tag lines on all loads Banksman in continuous communication with crane operator Crane pre-use inspection Wind speed monitoring | RESPONSIBLE ___________ Banksman All Rigger Banksman Operator Operator | VERIFICATION ____________ Visual Spot check Inspection Radio check Checklist Anemometer | FREQUENCY _________ Each lift Continuous Each lift Each lift Daily Continuous | STATUS ________ In Place ☐ Enforced ☐ Used ☐ Active ☐ Complete ☐ Within limits ☐ |
|---|
ACTIVITY PAIR: Hot Work & Production Operations
| CONTROL MEASURE ________ Gas test prior to hot work Continuous gas monitoring during work Fire watch posted with extinguisher Process isolation verified Flanges/connections covered Hot work permit issued and posted Emergency shutdown pre-brief | RESPONSIBLE ___________ Gas Tester Fire Watch Fire Watch Operator Maintenance Supervisor OIM | VERIFICATION ____________ Test record Monitor Visual LOTO check Visual Permit board Meeting | FREQUENCY _________ Pre-job Continuous Continuous Pre-job Pre-job Per shift Pre-job | STATUS ________ Pass ☐ Active ☐ On station ☐ Verified ☐ Covered ☐ Active ☐ Completed ☐ |
|---|
| # | HAZARD / SCENARIO | INITIAL RISK | CONTROLS | RESIDUAL RISK | ||
|---|---|---|---|---|---|---|
| 1 2 3 4 5 | Dropped object from crane onto process equipment causing hydrocarbon release Ignition of gas release from hot work during production operations Vessel collision with platform during supply operations while drilling Communication failure between driller and control room during well control event Crane/crane conflict during dual lift operations | 16 (EXTREME) 20 (EXTREME) 12 (HIGH) 9 (MEDIUM) 16 (EXTREME) | Exclusion zone Lift plan Barricading Gas testing Fire watch Isolation Watch circle DP trials Fendering Dedicated radio channel Hand signals Single crane operation Lift plan Supervisor | 9 (MEDIUM) 8 (MEDIUM) 6 (LOW) 4 (LOW) 4 (LOW) |
PRE-JOB SIMOPS MEETING:
Date: ______________ Time: ______________ Location: ______________ Chair: ______________
Attendees: ______________
______________
AGENDA ITEMS DISCUSSED:
☐ Scope of each activity ☐ Hazard identification
☐ Control measures verification ☐ Communication protocols
☐ Emergency procedures ☐ Permit requirements
☐ Stop work authority ☐ Simultaneous operations matrix
☐ Roles and responsibilities ☐ Handover procedures
KEY DECISIONS / ACTIONS:
1. ______________
2. ______________
3. ______________
DAILY SIMOPS MEETING (Toolbox Talk):
Time: ______________ Location: ______________ Leader: ______________
Weather forecast: ______________ Wind: ______________ Waves: ______________
ACTIVITY STATUS FOR TODAY:
Activity 1: ______________ Status: Active ☐ Completed ☐ Delayed ☐
Activity 2: ______________ Status: Active ☐ Completed ☐ Delayed ☐
Activity 3: ______________ Status: Active ☐ Completed ☐ Delayed ☐
Activity 4: ______________ Status: Active ☐ Completed ☐ Delayed ☐
CHANGES FROM PLAN: ______________
______________
NEXT DAY'S PLAN: ______________
______________
EMERGENCY SCENARIO-SPECIFIC SIMOPS PROCEDURES:
| SCENARIO ________ Gas Alarm (Level 1) Gas Alarm (Level 2/ESD) Fire Alarm Well Control Event Dropped Object Medical Emergency Severe Weather Vessel Collision Threat | ACTION BY ACTIVITY 1 ________ ________ ________ ________ ________ ________ ________ ________ ________ | ACTION BY ACTIVITY 2 ________ ________ ________ ________ ________ ________ ________ ________ ________ | COORDINATION ________ ________ ________ ________ ________ ________ ________ ________ ________ |
|---|
EMERGENCY SHUTDOWN (ESD) HIERARCHY:
☐ Unit ESD - Affects: ______________ Initiated by: ______________
☐ Platform ESD - Affects: ______________ Initiated by: OIM
☐ Pipeline ESD - Affects: ______________ Initiated by: ______________
☐ Simultaneous Activities Shutdown - Affects: _______ Initiated by: SIMOPS Coordinator
ESD RESPONSIBILITIES DURING SIMOPS:
- Driller actions: ______________
- Control Room actions: ______________
- Crane Operator actions: ______________
- Vessel actions: ______________
- Diving Supervisor actions: ______________
KEY PERSONNEL SIMOPS COMPETENCY:
| ROLE ________ SIMOPS Coordinator OIM / Platform Manager Driller Crane Operator Production Supervisor Maintenance Supervisor Marine Supervisor Diving Supervisor Safety Officer | NAME ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ | SIMOPS TRAINING ________ Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No | LAST ASSESSED _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ | COMPETENCY LEVEL ________ Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic |
|---|
SIMOPS TRAINING REQUIREMENTS:
☐ SIMOPS Awareness - Required for: All personnel in SIMOPS areas
☐ SIMOPS Coordinator - Required for: Designated coordinator, 5+ years experience
☐ Advanced SIMOPS Planning - Required for: Supervisors, OIM, Drilling Supervisors
☐ SIMOPS Drills - Frequency: ______________ Last Drill: ______________ Next Drill: ______________
DAILY VERIFICATION CHECKLIST:
| ITEM ________ All permits issued and valid Gas detectors operational and alarms tested Communication check between all activities Exclusion zones barricaded and signed Emergency equipment in place and accessible Weather within operating limits Personnel count verified (POB) SIMOPS board/status display updated Stop work authority understood | VERIFIED BY ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ | TIME _____ _____ _____ _____ _____ _____ _____ _____ _____ _____ | STATUS ________ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ |
|---|
WEEKLY SIMOPS AUDIT:
Last Audit: ______________ Auditor: ______________ Findings: ______________
Next Audit: ______________
ANY PERSON HAS THE AUTHORITY AND RESPONSIBILITY TO STOP WORK WHEN:
☐ An unsafe condition is observed
☐ A change in conditions occurs
☐ Communication is lost
☐ A permit violation is observed
☐ Weather exceeds operating limits
☐ An unplanned event occurs
☐ If unsure about safety
STOP WORK PROCEDURE:
1. Immediately stop the task
2. Make the area safe
3. Notify supervisor/SIMOPS coordinator
4. Do not resume until cleared by supervisor
STOP WORK AUTHORITY ACKNOWLEDGMENT:
I understand my Stop Work Authority and responsibility:
Name: ______________ Signature: ______________ Date: ______________
| # | ACTION REQUIRED | RESPONSIBLE | DUE DATE | STATUS | ||
|---|---|---|---|---|---|---|
| 1 2 3 4 5 | Conduct pre-SIMOPS meeting for next week's activities (drilling + production) Repair radio communication interference between crane and driller Update SIMOPS matrix with new diving ops Replace missing barricades at exclusion zone Conduct SIMOPS drill with all activities | SIMOPS Coord Comms Tech Safety Officer Maintenance OIM | 01/24/2025 01/20/2025 01/30/2025 01/18/2025 02/15/2025 | Planned ☐ In Progress ☐ Open ☐ Complete ☐ Planned ☐ |
ASSESSMENT TEAM:
Name: ______________ Title: SIMOPS Coordinator Signature: ______________
Name: ______________ Title: OIM / Platform Manager Signature: ______________
Name: ______________ Title: Drilling Supervisor Signature: ______________
Name: ______________ Title: Production Supervisor Signature: ______________
Name: ______________ Title: Safety Officer Signature: ______________
APPROVALS:
Operations Manager: ______________ Date: ______________ Signature: ______________
HSE Manager: ______________ Date: ______________ Signature: ______________
SIMOPS Coordinator: ______________ Date: ______________ Signature: ______________
REVIEW DATE: ______________ NEXT REVIEW DATE: ______________