Simultaneous Operations (Simops) Risk Assessment template

Free Simultaneous Operations (Simops) Risk Assessment template for oil & gas you can edit online and download as PDF. Covers simops information, simultaneous operations matrix, current simops activities assessment.

Simops Information

ASSESSMENT ID: SIM-__________ DATE: ______________ TIME: ______________

FACILITY NAME: ______________ LOCATION: ______________ AREA: ______________

SIMOPS COORDINATOR: ______________ VALIDITY PERIOD: FROM: ______________ TO: ______________

DESCRIPTION OF SIMOPS ACTIVITIES: ______________

______________

Simultaneous Operations Matrix

LEGEND: = Compatible (No restrictions) = Caution (Requires controls) = Not Permitted (Exclusive)

= Hazardous interaction (Special permit required)

ACTIVITY 1ACTIVITY 2COMPATIBILITYKEY INTERACTION HAZARDSREQUIRED CONTROLSPERMIT REQUIRED
Drilling OperationsProduction Operations/-Gas release ignition
-Well control event
-Dropped objects
-Communication failure
-Gas detection
-ESD coordination
-Isolation zones
-Communication
☐ SIMOPS Permit
☐ Hot Work
☐ PTW
Drilling OperationsLifting Operations-Load over live equip
-Crane/rig conflicts
-Swing radius overlap
-Dropped objects
-Exclusion zones
-Lifting plan
-Banksman
-Communication
☐ SIMOPS Permit
☐ Lifting
☐ PTW
Drilling Operations (Offshore)Vessel Operations (Supply)-Vessel collision
-Riser damage
-Mooring conflicts
-Transfer operations
-Watch circle
-DP trials
-Fender systems
-Communication
☐ SIMOPS Permit
☐ Marine
☐ PTW
Production OperationsLifting Operations-Load over process
-Ignition sources
-Dropped objects
-Process release
-Barricading
-Hot work permit
-Exclusion zones
-Communication
☐ SIMOPS Permit
☐ Lifting
☐ PTW
Production OperationsMaintenance (Non-hot)/-Process isolation
-Equipment start-up
-Pressure/energy sources
-Personnel safety
-LOTO
-Isolation
-Boundary limits
-Communication
☐ SIMOPS Permit
☐ PTW
☐ LOTO
Production OperationsHot Work (Welding)/-Ignition sources
-Fire/explosion
-Hydrocarbon release
-Personnel injury
-Gas testing
-Fire watch
-Cover/flange
-Isolation
☐ SIMOPS Permit
☐ Hot Work
☐ PTW
☐ Gas Test
Lifting Operations (Multiple cranes)Lifting Operations/ (Same zone)-Crane/crane conflict
-Load collision
-Communication failure
-Swing radius overlap
-One crane at a time
-Lifting plan
-Supervisor
☐ SIMOPS Permit
☐ Lifting
☐ PTW
Lifting OperationsPersonnel Activities-Load over personnel
-Dropped objects
-Crane movement
-Communication
-Exclusion zones
-Barricading
-Banksman
-Communication
☐ SIMOPS Permit
☐ Lifting
☐ PTW
Construction / Fabrication (Hot work)Production Operations/-Ignition sources
-Fire/explosion
-Process release
-Personnel injury
-Gas testing
-Fire watch
-Isolation
-Boundary limits
☐ SIMOPS Permit
☐ Hot Work
☐ PTW
Diving OperationsAll other operations(Within dive zone)-Diver entanglement
-Vessel collision
-Crane operations
-Pressure in equipment
-Exclusion zone
-Dive plan
-Communications
-Standby diver
☐ SIMOPS Permit
☐ Marine
☐ PTW

Current Simops Activities Assessment

ACTIVITY 1: ______________ PRIORITY: High ☐ Med ☐ Low ☐

ACTIVITY 2: ______________ PRIORITY: High ☐ Med ☐ Low ☐

ACTIVITY 3: ______________ PRIORITY: High ☐ Med ☐ Low ☐

ACTIVITY 4: ______________ PRIORITY: High ☐ Med ☐ Low ☐

INTERACTION HAZARDS IDENTIFIED:

HAZARD SCENARIO ________ ________ ________ ________ ________LIKELIHOOD __________ __________ __________ __________ __________SEVERITY _________ _________ _________ _________ _________RISK _____ _____ _____ _____ _____CONTROLS REQUIRED ________ ________ ________ ________ ________

Simops Control Measures

COMMUNICATION PROTOCOLS:

☐ Dedicated SIMOPS radio channel - Channel: _______ Monitored by: ______________
☐ Pre-job coordination meeting - Time: ______________ Attendees: All supervisors
☐ Daily SIMOPS meeting - Time: ______________ Location: ______________
☐ Activity status board - Location: ______________ Updated by: ______________
☐ Handover communication - Shift change time: ______________ Process: ______________

ZONING AND BARRIERS:

ZONE/AREA ________ ________ ________ ________ Exclusion Zone Hot Work Area Process AreaACTIVITY ________ ________ ________ ________ Lifting Welding ProductionHAZARD TYPE __________ __________ __________ __________ Dropped objects Ignition source ReleaseBOUNDARIES __________ __________ __________ __________ ___m radius ___m radius Entire unitACCESS CONTROL ________ ________ ________ ________ Barricades Fire blankets Gate accessSIGNAGE _______ _______ _______ _______ Yes Yes YesSTATUS ________ Active ☐ Active ☐ Active ☐ Established ☐ Established ☐ Operational ☐

TEMPORARY CONTROLS:

CONTROL MEASURE ________ Blast mats Fire blankets Water curtains Temporary wind walls Additional gas monitors Temporary lightingAPPLIES TO ACTIVITY ________ Drilling/Production Hot Work Area Process Area Lifting Zone All Areas Work AreasINSTALLED __________ Yes/No Yes/No Yes/No Yes/No Yes/No Yes/NoVERIFIED BY ____________ ____________ ____________ ____________ ____________ ____________ ____________REMOVAL DATE _____________ _____________ _____________ _____________ _____________ _____________ _____________STATUS ____________ In Place ☐ In Place ☐ Active ☐ Installed ☐ Active ☐ Active ☐

Simops Permit Requirements

PERMIT MATRIX FOR CURRENT ACTIVITIES:

PERMIT TYPE ________ SIMOPS Permit Hot Work Permit Confined Space Lift Plan Isolation/LOTO Ground Disturbance Radioactive SourceACTIVITY 1 __________ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ACTIVITY 2 __________ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ACTIVITY 3 __________ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ACTIVITY 4 __________ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ Required ☐ Not Req ☐ISSUED BY _________ _________ _________ _________ _________ _________ _________ _________VALID UNTIL ________ ________ ________ ________ ________ ________ ________ ________

Simops Specific Controls By Activity Pair

ACTIVITY PAIR: Drilling Operations & Production Operations

CONTROL MEASURE ________ Continuous gas monitoring in both areas ESD system test & coordination Communication check between driller and control room Exclusion zone around wellhead Stop work authority emphasized Simultaneous drilling/production procedure reviewRESPONSIBLE ___________ Operator Driller/OIM Both Operator Supervisor OIMVERIFICATION ____________ Log check Function test Radio check Walk down Toolbox talk ReviewFREQUENCY _________ Continuous Daily Hourly Per shift Daily Pre-jobSTATUS ________ Active ☐ Complete ☐ Active ☐ Established ☐ Completed ☐ Approved ☐

ACTIVITY PAIR: Lifting Operations & Personnel Activities

CONTROL MEASURE ________ Barricade lift zone Exclusion zone - no personnel under load Tag lines on all loads Banksman in continuous communication with crane operator Crane pre-use inspection Wind speed monitoringRESPONSIBLE ___________ Banksman All Rigger Banksman Operator OperatorVERIFICATION ____________ Visual Spot check Inspection Radio check Checklist AnemometerFREQUENCY _________ Each lift Continuous Each lift Each lift Daily ContinuousSTATUS ________ In Place ☐ Enforced ☐ Used ☐ Active ☐ Complete ☐ Within limits ☐

ACTIVITY PAIR: Hot Work & Production Operations

CONTROL MEASURE ________ Gas test prior to hot work Continuous gas monitoring during work Fire watch posted with extinguisher Process isolation verified Flanges/connections covered Hot work permit issued and posted Emergency shutdown pre-briefRESPONSIBLE ___________ Gas Tester Fire Watch Fire Watch Operator Maintenance Supervisor OIMVERIFICATION ____________ Test record Monitor Visual LOTO check Visual Permit board MeetingFREQUENCY _________ Pre-job Continuous Continuous Pre-job Pre-job Per shift Pre-jobSTATUS ________ Pass ☐ Active ☐ On station ☐ Verified ☐ Covered ☐ Active ☐ Completed ☐

Simops Risk Register

#HAZARD / SCENARIOINITIAL RISKCONTROLSRESIDUAL RISK
1 2 3 4 5Dropped object from crane onto process equipment causing hydrocarbon release Ignition of gas release from hot work during production operations Vessel collision with platform during supply operations while drilling Communication failure between driller and control room during well control event Crane/crane conflict during dual lift operations16 (EXTREME) 20 (EXTREME) 12 (HIGH) 9 (MEDIUM) 16 (EXTREME)Exclusion zone Lift plan Barricading Gas testing Fire watch Isolation Watch circle DP trials Fendering Dedicated radio channel Hand signals Single crane operation Lift plan Supervisor9 (MEDIUM) 8 (MEDIUM) 6 (LOW) 4 (LOW) 4 (LOW)

Simops Coordination Meeting Minutes

PRE-JOB SIMOPS MEETING:

Date: ______________ Time: ______________ Location: ______________ Chair: ______________

Attendees: ______________

______________

AGENDA ITEMS DISCUSSED:

☐ Scope of each activity ☐ Hazard identification

☐ Control measures verification ☐ Communication protocols

☐ Emergency procedures ☐ Permit requirements

☐ Stop work authority ☐ Simultaneous operations matrix

☐ Roles and responsibilities ☐ Handover procedures

KEY DECISIONS / ACTIONS:

1. ______________

2. ______________

3. ______________

DAILY SIMOPS MEETING (Toolbox Talk):

Time: ______________ Location: ______________ Leader: ______________

Weather forecast: ______________ Wind: ______________ Waves: ______________

ACTIVITY STATUS FOR TODAY:

Activity 1: ______________ Status: Active ☐ Completed ☐ Delayed ☐

Activity 2: ______________ Status: Active ☐ Completed ☐ Delayed ☐

Activity 3: ______________ Status: Active ☐ Completed ☐ Delayed ☐

Activity 4: ______________ Status: Active ☐ Completed ☐ Delayed ☐

CHANGES FROM PLAN: ______________

______________

NEXT DAY'S PLAN: ______________

______________

Simops Emergency Procedures

EMERGENCY SCENARIO-SPECIFIC SIMOPS PROCEDURES:

SCENARIO ________ Gas Alarm (Level 1) Gas Alarm (Level 2/ESD) Fire Alarm Well Control Event Dropped Object Medical Emergency Severe Weather Vessel Collision ThreatACTION BY ACTIVITY 1 ________ ________ ________ ________ ________ ________ ________ ________ ________ACTION BY ACTIVITY 2 ________ ________ ________ ________ ________ ________ ________ ________ ________COORDINATION ________ ________ ________ ________ ________ ________ ________ ________ ________

EMERGENCY SHUTDOWN (ESD) HIERARCHY:

☐ Unit ESD - Affects: ______________ Initiated by: ______________

☐ Platform ESD - Affects: ______________ Initiated by: OIM

☐ Pipeline ESD - Affects: ______________ Initiated by: ______________

☐ Simultaneous Activities Shutdown - Affects: _______ Initiated by: SIMOPS Coordinator

ESD RESPONSIBILITIES DURING SIMOPS:

- Driller actions: ______________

- Control Room actions: ______________

- Crane Operator actions: ______________

- Vessel actions: ______________

- Diving Supervisor actions: ______________

Simops Competency And Training

KEY PERSONNEL SIMOPS COMPETENCY:

ROLE ________ SIMOPS Coordinator OIM / Platform Manager Driller Crane Operator Production Supervisor Maintenance Supervisor Marine Supervisor Diving Supervisor Safety OfficerNAME ________ ________ ________ ________ ________ ________ ________ ________ ________ ________SIMOPS TRAINING ________ Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/NoLAST ASSESSED _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________COMPETENCY LEVEL ________ Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic Advanced/Intermediate/Basic

SIMOPS TRAINING REQUIREMENTS:

☐ SIMOPS Awareness - Required for: All personnel in SIMOPS areas

☐ SIMOPS Coordinator - Required for: Designated coordinator, 5+ years experience

☐ Advanced SIMOPS Planning - Required for: Supervisors, OIM, Drilling Supervisors

☐ SIMOPS Drills - Frequency: ______________ Last Drill: ______________ Next Drill: ______________

Simops Audit And Verification

DAILY VERIFICATION CHECKLIST:

ITEM ________ All permits issued and valid Gas detectors operational and alarms tested Communication check between all activities Exclusion zones barricaded and signed Emergency equipment in place and accessible Weather within operating limits Personnel count verified (POB) SIMOPS board/status display updated Stop work authority understoodVERIFIED BY ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________TIME _____ _____ _____ _____ _____ _____ _____ _____ _____ _____STATUS ________ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐ Yes ☐ No ☐ N/A ☐

WEEKLY SIMOPS AUDIT:

Last Audit: ______________ Auditor: ______________ Findings: ______________

Next Audit: ______________

Stop Work Authority

ANY PERSON HAS THE AUTHORITY AND RESPONSIBILITY TO STOP WORK WHEN:

☐ An unsafe condition is observed

☐ A change in conditions occurs

☐ Communication is lost

☐ A permit violation is observed

☐ Weather exceeds operating limits

☐ An unplanned event occurs

☐ If unsure about safety

STOP WORK PROCEDURE:

1. Immediately stop the task

2. Make the area safe

3. Notify supervisor/SIMOPS coordinator

4. Do not resume until cleared by supervisor

STOP WORK AUTHORITY ACKNOWLEDGMENT:

I understand my Stop Work Authority and responsibility:

Name: ______________ Signature: ______________ Date: ______________

Action Plan And Corrective Actions

#ACTION REQUIREDRESPONSIBLEDUE DATESTATUS
1 2 3 4 5Conduct pre-SIMOPS meeting for next week's activities (drilling + production) Repair radio communication interference between crane and driller Update SIMOPS matrix with new diving ops Replace missing barricades at exclusion zone Conduct SIMOPS drill with all activitiesSIMOPS Coord Comms Tech Safety Officer Maintenance OIM01/24/2025 01/20/2025 01/30/2025 01/18/2025 02/15/2025Planned ☐ In Progress ☐ Open ☐ Complete ☐ Planned ☐

Assessment Team And Approval

ASSESSMENT TEAM:

Name: ______________ Title: SIMOPS Coordinator Signature: ______________

Name: ______________ Title: OIM / Platform Manager Signature: ______________

Name: ______________ Title: Drilling Supervisor Signature: ______________

Name: ______________ Title: Production Supervisor Signature: ______________

Name: ______________ Title: Safety Officer Signature: ______________

APPROVALS:

Operations Manager: ______________ Date: ______________ Signature: ______________

HSE Manager: ______________ Date: ______________ Signature: ______________

SIMOPS Coordinator: ______________ Date: ______________ Signature: ______________

REVIEW DATE: ______________ NEXT REVIEW DATE: ______________

More templates