Free Permit To Work (Ptw) Risk Assessment template for oil & gas you can edit online and download as PDF. Covers permit to work system information, permit to work risk assessment, permit classification and requirements.
ASSESSMENT ID: PTW-__________ DATE: ______________ TIME: ______________
FACILITY NAME: ______________ LOCATION: ______________ UNIT/AREA: ______________
PTW COORDINATOR: ______________ SHIFT: Days ☐ Nights ☐ DATE OF REVIEW: ______________
PERMIT NUMBER: ______________ PERMIT TYPE: Hot Work ☐ Cold Work ☐ Confined Space ☐ Other ☐
| WORK ACTIVITY DESCRIPTION | HAZARD IDENTIFIED | POTENTIAL CONSEQUENCE | EXISTING CONTROLS | LIKELIHOOD (1-5) | SEVERITY (A-E) | RISK INDEX |
|---|---|---|---|---|---|---|
| _____________ _____________ _____________ _____________ _____________ | _____________ _____________ _____________ _____________ _____________ | _____________ _____________ _____________ _____________ _____________ | _____________ _____________ _____________ _____________ _____________ | _ _ _ _ _ | _ _ _ _ _ | _ _ _ _ _ |
PERMIT TYPES:
| ☐ HOT WORK PERMIT - Work involving ignition sources (welding, grinding, cutting, spark-producing tools) Additional Requirements: Fire watch, gas testing, fire extinguisher, cover drains/flanges | |
|---|---|
| ☐ COLD WORK PERMIT - Work not involving ignition sources (mechanical, electrical, general maintenance) Additional Requirements: Area assessment, isolation as required, proper tools | |
| ☐ CONFINED SPACE ENTRY PERMIT - Entry into confined spaces (tanks, vessels, pits, excavations) Additional Requirements: Gas testing, ventilation, attendant, rescue plan, harness/lifeline | |
| ☐ ELECTRICAL PERMIT / LOTO - Work on electrical systems Additional Requirements: Isolation, LOTO, testing for dead, qualified electrician | |
| ☐ EXCAVATION / GROUND DISTURBANCE PERMIT - Digging, trenching, ground penetration Additional Requirements: Utility locate, shoring, barricading, slope protection | |
| ☐ RADIOACTIVE SOURCE / X-RAY PERMIT - NDT, logging, radiography Additional Requirements: RSO authorization, exclusion zone, dosimetry, signage | |
| ☐ HEAVY LIFT PERMIT - Critical or heavy lifts (>80% capacity, complex lifts) Additional Requirements: Lift plan, engineered lift, crane certification, banksman |
SECTION A: JOB INFORMATION (To be completed by Applicant)
| Job Title/Description: ______________ Work Location: ______________ Company/Contractor: ______________ Supervisor: ______________ Workers names: ______________ | |
|---|---|
| Start Date: ______________ Start Time: ______________ End Date: ______________ End Time: __________ Is this a continuation of previous permit? Yes ☐ No ☐ Previous Permit #: ______________ |
SECTION B: HAZARD IDENTIFICATION (To be completed by Applicant)
| Check all hazards applicable to this work: ☐ Flammable materials ☐ Toxic/chemicals ☐ Oxygen deficiency ☐ Pressurized systems ☐ Electrical ☐ Confined space ☐ Hot work sources ☐ Heights >2m ☐ Lifting operations ☐ Excavation ☐ Heavy equipment ☐ Noise >85dB ☐ Radiation sources ☐ Biological ☐ Asbestos/Silica ☐ Manual handling ☐ Simultaneous ops ☐ Dropped objects ☐ Sharp objects ☐ Slip/trip hazards ☐ Environmental ☐ Weather extremes ☐ Night work ☐ Remote location Other hazards: ______________ |
|---|
SECTION C: CONTROL MEASURES (To be completed by Applicant)
| ISOLATION REQUIREMENTS: ☐ Electrical LOTO - Tag #: ______________ Verified by: ______________ ☐ Mechanical Isolation - Blind/Blank #: ______________ Line/Equipment: ______________ ☐ Double Block & Bleed - Valves: ______________ Bleed open: Yes ☐ No ☐ ☐ Drain/Purge Completed - Medium: ______________ Verified by: ______________ ☐ Disconnected - Spool removed: Yes ☐ No ☐ Location: ______________ | |
|---|---|
| PPE REQUIREMENTS: ☐ Hard hat ☐ Safety glasses ☐ Steel toes ☐ Gloves (type: ______) ☐ Coveralls ☐ Face shield ☐ Ear protection ☐ Chemical suit ☐ Flame resistant (FR) ☐ Anti-static ☐ Life jacket ☐ Harness/Lanyard ☐ SCBA/BA ☐ Respirator (type: ______) | |
| SPECIAL CONTROLS: ☐ Gas Test Required - Frequency: Continuous ☐ Pre-job ☐ Hourly ☐ ☐ Fire Watch Required - Number: ______ Equipment: Extinguisher ☐ Hose ☐ Monitor ☐ ☐ Ventilation Required - Type: Natural ☐ Mechanical ☐ Air mover #: ______ ☐ Lighting Required - Type: Explosion-proof ☐ Portable ☐ Generator ☐ ☐ Barricading/Signing Required - Type: ______________ Location: ______________ ☐ Communications Required - Type: Radio ☐ Hand signals ☐ Phone ☐ PA ☐ ☐ Standby Person Required - Name: ______________ Role: ______________ |
(MUST BE COMPLETED IMMEDIATELY BEFORE AND DURING HOT WORK / CONFINED SPACE ENTRY)
| LOCATION OF TEST: ______________ DATE: ______________ | |
|---|---|
| TEST RESULTS: |
| TEST PARAMETER | ACCEPTABLE RANGE | ACTUAL READING | |
|---|---|---|---|
| Oxygen (O2) Lower Explosive Limit (LEL) Hydrogen Sulfide (H2S) Carbon Monoxide (CO) Sulfur Dioxide (SO2) Volatile Organic Compounds (VOC) Other (_____________) | 19.5% - 23.0% <10% LEL <10 ppm <25 ppm <2 ppm <50 ppm ________ | _____________% _____________% LEL _____________ ppm _____________ ppm _____________ ppm _____________ ppm _____________ |
| TEST TIME | TESTED BY | EQUIPMENT ID | CAL DUE DATE | PASS/FAIL | COMMENTS | |
|---|---|---|---|---|---|---|
| ___________ ___________ ___________ ___________ | __________ __________ __________ __________ | ____________ ____________ ____________ ____________ | ____________ ____________ ____________ ____________ | Pass/Fail Pass/Fail Pass/Fail Pass/Fail | ________ ________ ________ ________ |
I CERTIFY THAT THE ATMOSPHERE IN THE WORK AREA HAS BEEN TESTED AND FOUND SAFE FOR THE WORK DESCRIBED.
Gas Tester Signature: ______________ Date: ______________ Time: ______________
| ENERGY SOURCE ________ Electrical Mechanical Pneumatic Hydraulic Chemical Thermal Gravity/Potential Stored Energy | ISOLATED? _________ Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No | LOCKED? _______ Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No | TAGGED? _______ Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No | VERIFIED BY ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ | TIME/DATE ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ | ZERO ENERGY TESTED? ________ Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No |
|---|
LOTO BOX NUMBER: ______________ KEY(S) DEPOSITED BY: ______________ DATE: ______________
NUMBER OF LOCKS ON BOX: ______ ALL TEAM MEMBERS HAVE PERSONAL LOCK? Yes ☐ No ☐
I VERIFY THAT ALL ENERGY SOURCES HAVE BEEN PROPERLY ISOLATED, LOCKED, AND TESTED.
Authorized Isolator: ______________ Signature: ______________ Date: ______________
SECTION D: SITE CHECK (To be completed by Area Authority / Operator)
| I have inspected the work area and verified: ☐ Area is safe for work described ☐ Isolation/LOTO is complete and verified ☐ Gas test results are acceptable ☐ Adjacent activities considered (SIMOPS) ☐ Safety equipment is in place ☐ Emergency equipment is available ☐ Access/egress is clear ☐ Lighting/ventilation adequate ☐ No conflicting permits in same area ☐ Workers have required PPE and training | |
|---|---|
| Comments: ______________ | |
| Area Authority Name: ______________ Signature: ______________ Date: ____________ |
SECTION E: PERMIT AUTHORIZATION (To be completed by PTW Coordinator / Issuing Authority)
| I have reviewed this permit and confirm: ☐ All sections completed correctly ☐ Hazards identified and controlled ☐ Controls are appropriate ☐ Workers are competent for task ☐ SIMOPS considerations addressed ☐ Emergency procedures understood ☐ Permit duration is appropriate ☐ Supporting permits attached (if required) | |
|---|---|
| This permit is: ☐ APPROVED ☐ APPROVED WITH CONDITIONS ☐ NOT APPROVED - See comments | |
| Conditions/Notes: ______________ | |
| PTW Coordinator Name: ______________ Signature: ______________ Date: ____________ Endorsing Supervisor (if required): ______________ Signature: ______________ |
SECTION F: JOB RECEIPT AND ACKNOWLEDGMENT (To be completed by Performing Authority / Supervisor)
| I have received this permit and understand: ☐ The scope of work ☐ All hazards and controls ☐ My responsibilities during the work ☐ Stop Work Authority ☐ Emergency procedures for this area ☐ Permit validity and handover requirements | |
|---|---|
| I confirm that all workers have been briefed on this permit. | |
| Supervisor Name: ______________ Signature: ______________ Time: ______________ Date: ______________ |
ACTIVE PERMITS BOARD:
| PERMIT # _________ _________ _________ _________ _________ | TYPE _________ _________ _________ _________ _________ | LOCATION __________ __________ __________ __________ __________ | COMPANY _______ _______ _______ _______ _______ | SUPERVISOR __________ __________ __________ __________ __________ | START _______ _______ _______ _______ _______ | END _______ _______ _______ _______ _______ | STATUS _______ Active Hold Active Closed | SIMOPS NOTES ________ ________ ________ ________ N/A |
|---|
PERMIT COORDINATION MEETING:
☐ Pre-shift meeting held at: ______________ Attendees: ______________
☐ Conflicting permits identified: ______________ Resolution: ______________
☐ SIMOPS activities coordinated: ______________ Plan: ______________
HANDOVER (Shift Change):
| Work Status at handover: ______________ New Supervisor: ______________ Old Supervisor: ______________ Workers briefed on status: Yes ☐ No ☐ Permit reviewed with new crew: Yes ☐ No ☐ Handover Time: ______________ Date: ______________ New Supervisor Signature: ______________ |
|---|
SUSPENSION (Work Interrupted):
| Reason for suspension: ______________ Work suspended at: ______________ Date: ______________ By: ______________ Area made safe: Yes ☐ No ☐ Permit retained at board: Yes ☐ No ☐ |
|---|
EXTENSION:
| Extension requested to: ______________ Date: ______________ Reason for extension: ______________ Approved by: ______________ Signature: ______________ Date: ______________ |
|---|
CLOSURE:
| Work completed: Yes ☐ No ☐ (If No, explain: ______________) Work area cleaned and returned to normal: Yes ☐ No ☐ Isolation/LOTO removed: Yes ☐ No ☐ By: ______________ All personnel accounted for: Yes ☐ No ☐ Permit closed at: ______________ Date: ______________ | |
|---|---|
| Supervisor: ______________ Signature: ______________ PTW Coordinator: ______________ Signature: ______________ |
I understand that I have the authority and responsibility to Stop Work if:
☐ Conditions change from the permit
☐ I discover an uncontrolled hazard
☐ I am unsure about the safety of the task
☐ Gas test fails or alarms activate
☐ Weather conditions exceed safe limits
☐ Someone is at risk of injury
STOP WORK PROCEDURE:
1. Immediately stop the task
2. Make the area safe
3. Notify supervisor and PTW Coordinator
4. Do not resume until authorized
All workers acknowledge Stop Work Authority:
Name: ______________ Signature: ______________
Name: ______________ Signature: ______________
Name: ______________ Signature: ______________
Name: ______________ Signature: ______________
| AUDIT ITEM ________ Permits are properly completed Hazard identification is accurate Control measures are appropriate and in place Gas tests are current and within limits Isolation/LOTO is verified PTW board is up to date Handovers are documented Permit duration is appropriate Workers understand permit requirements SIMOPS considerations addressed Permit closure is complete | COMPLIANT _________ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | PARTIAL _______ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | NON-COMPLIANT _____________ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | N/A ___ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | COMMENTS ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ |
|---|
AUDIT DATE: ______________ AUDITOR: ______________ NEXT AUDIT: ______________
| # | ACTION REQUIRED | RESPONSIBLE | DUE DATE | STATUS | ||
|---|---|---|---|---|---|---|
| 1 2 3 4 5 | ________ ________ ________ ________ ________ | _____________ _____________ _____________ _____________ _____________ | _____________ _____________ _____________ _____________ _____________ | Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ |
ASSESSMENT TEAM:
Name: ______________ Title: PTW Coordinator Signature: ______________
Name: ______________ Title: Area Authority / Operator Signature: ______________
Name: ______________ Title: Performing Supervisor Signature: ______________
Name: ______________ Title: Safety Officer Signature: ______________
APPROVALS:
Operations Manager: ______________ Date: ______________ Signature: ______________
HSE Manager: ______________ Date: ______________ Signature: ______________
PTW Coordinator: ______________ Date: ______________ Signature: ______________
REVIEW DATE: ______________ NEXT REVIEW DATE: ______________