Free Offshore Operations Risk Assessment template for oil & gas you can edit online and download as PDF. Covers offshore facility information, temporary refuge (tr) and muster area status, emergency evacuation and escape equipment
ASSESSMENT ID: OFF-__________ DATE: ______________ TIME: ______________
FACILITY NAME: ______________ LOCATION: ______________ BLOCK: ______________
FACILITY TYPE: Fixed Platform ☐ Jackup ☐ Semi ☐ Drillship ☐ FPSO ☐ TLP ☐ Spar ☐
WATER DEPTH: _____________ ft DISTANCE TO SHORE: _____________ miles HELIPORT: Yes ☐ No ☐
OPERATOR: ______________ CONTRACTOR: ______________ PERSONNEL ON BOARD: ______
| HAZARD CATEGORY | HAZARD DESCRIPTION | POTENTIAL CONSEQUENCE | EXISTING CONTROLS | LIKELIHOOD (1-5) | SEVERITY (A-E) | RISK INDEX |
|---|---|---|---|---|---|---|
| Marine Operations / Vessel Interface | -Vessel collision -Supply boat strike -Mooring failure -Dynamic positioning failure -Loading hose failure | -Collision -Platform damage -Loss of integrity -Personnel injury -Environmental release | -VTS/Vessel traffic system -Standby vessel -Radar -Fender systems -DP trials -Watch circles | 3 (Occasional) | E (Catastrophic) | 12 (HIGH) |
| Helicopter Operations | -Helicopter crash -Hard landing -Refueling incident -Sling load drop -Personnel transfer incident | -Fatalities -Platform fire -Loss of air transport access | -Helideck cert -Fuel isolation -Foam system -Net perimeter -HLO training | 2 (Remote) | E (Catastrophic) | 8 (HIGH) |
| Lifting Operations (Offshore) | -Crane failure -Overload -Sling failure -Tag line entanglement -Load swing -Boom failure | -Dropped object -Personnel injury -Equipment damage -Vessel/ platform damage | -Crane cert -Load testing -Hand signals -Exclusion zones -Lifting plan | 4 (Probable) | D (Hazardous) | 12 (HIGH) |
| Structural Integrity | -Extreme weather -Hurricane/ Cyclone -Fatigue cracking -Corrosion -Seismic -Scour -Boat impact | -Platform collapse -Loss of life -Loss of production -Environmental release | -Structural monitoring -FMEA/ inspection -Sacrificial anodes -Coatings -Marine growth removal | 2 (Remote) | E (Catastrophic) | 8 (HIGH) |
| Fire & Explosion | -Hydrocarbon release -Ignition -Gas cloud explosion -Jet fire -Pool fire -BLEVE | -Escalation -Multiple fatalities -Platform evacuation -Total loss | -Fire and gas detection -Deluge system -Blast walls -Passive fire protection | 3 (Occasional) | E (Catastrophic) | 12 (HIGH) |
| Evacuation & Escape | -Facility abandonment -Lifeboat malfunction -Davits failure -Muster area compromised -Means of escape blocked -Abandonment in rough seas | -Inability to evacuate -Drowning -Hypothermia -Mass casualty | -TEMPSC (lifeboat) -Muster areas -Life rafts -Escape routes -PA/GA system -MOB boat | 3 (Occasional) | E (Catastrophic) | 12 (HIGH) |
| Diving Operations (if applicable) | -Diving emergencies -Equipment failure -Lost diver -Mixed gas issues -Decompression chamber fire | -Decompression sickness -Arterial gas embolism -Drowning -Fatality | -Diving supervisor -Dive plan -Standby diver -Hyperbaric lifeboat -Chamber | 3 (Occasional) | E (Catastrophic) | 12 (HIGH) |
TEMPORARY REFUGE (TR) INFORMATION:
| TR LOCATION: ______________ CAPACITY: ______ persons CURRENT POB: ______ | |
|---|---|
| TR SYSTEMS STATUS: |
| SYSTEM ________ HVAC/Overpressure Fire/gas detection Communications (internal) Communications (external) Emergency lighting Breathing air supply Survivor support equipment TR integrity (fire rated) | STATUS _____________ Operational ☐ Operational ☐ Operational ☐ Operational ☐ Operational ☐ Operational ☐ Complete ☐ Verified ☐ | LAST TEST __________ __________ __________ __________ __________ __________ __________ __________ __________ | NEXT TEST __________ __________ __________ __________ __________ __________ __________ __________ __________ | COMMENTS ________ ________ ________ ________ ________ ________ __________ hours remaining Food/Water/Blankets A60/A0 rating |
|---|
MUSTER AREAS:
| AREA ____________ Primary Secondary Helideck | LOCATION ___________ ___________ ___________ ___________ | CAPACITY ________ ______ ______ ______ | PROTECTION __________ Covered ☐ Covered ☐ Open ☐ | COMMUNICATIONS ________ PA/Radio PA/Radio Radio | EQUIPMENT ________ Life jackets Life jackets Fire fighting | STATUS ________ Ready ☐ Ready ☐ Ready ☐ |
|---|
TEMPSC (TOTALLY ENCLOSED MOTOR PROPELLED SURVIVAL CRAFT) - LIFEBOATS:
| BOAT # ______ #1 #2 #3 #4 | TYPE ________ Freefall Twin-fall Twin-fall Freefall | CAPACITY ________ ______ ______ ______ ______ | DAVIT TYPE __________ Freefall Gravity Gravity Freefall | LAST LAUNCH __________ __________ __________ __________ __________ | NEXT DUE _________ _________ _________ _________ _________ | STATUS __________ Ready ☐ Ready ☐ Ready ☐ Ready ☐ | COMMENTS ________ ________ ________ ________ ________ |
|---|
LIFE RAFTS AND OTHER EQUIPMENT:
| EQUIPMENT TYPE ________ Liferafts (davit) Liferafts (throw-over) Lifebuoys Life Jackets Immersion Suits EPIRBs SARTs MOB Boat First Aid Stations | QUANTITY ________ ________ ________ ________ ________ ________ ________ ________ 1 ________ | LOCATION ________ ________ ________ ________ All areas All areas TR/Bridge Bridge/Lifeboats Crane area Various | LAST INSPECT ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ | NEXT DUE _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ | STATUS ________ Ready ☐ Ready ☐ Complete ☐ _____% stocked _____% stocked Tested ☐ Tested ☐ Ready ☐ Stocked ☐ |
|---|
CRANE INVENTORY:
| CRANE # _______ Crane 1 Crane 2 Crane 3 | TYPE ________ Pedestal Pedestal Knuckle Boom | CAPACITY ________ ____ tons ____ tons ____ tons | LOCATION _________ Main Deck Main Deck Helideck | LAST CERT __________ __________ __________ __________ | NEXT CERT __________ __________ __________ __________ | OPERATOR _________ _________ _________ _________ | STATUS ________ Operational ☐ Operational ☐ Operational ☐ |
|---|
LIFTING ACCESSORIES:
| ITEM ________ Slings (wire) Slings (synthetic) Shackles Lifting Lugs Lifting Beams Baskets/Cages Padeyes | QUANTITY ________ ________ ________ ________ ________ ________ ________ ________ | LAST INSPECT ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ | NEXT INSPECT ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ | CERTIFIED _________ Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No | COLOR CODE __________ __________ __________ __________ N/A __________ N/A N/A | STATUS ________ Good/Damaged Good/Damaged Good/Damaged Inspected ☐ Good/Damaged Good/Damaged Inspected ☐ |
|---|
HELIDECK INFORMATION:
| PARAMETER ________ Helideck Type D Value (Largest Helicopter) Helideck Certification Load Rating Fire Fighting System Perimeter Netting Fueling System Bonding/Grounding Weather Station | VALUE ________ Raised/Deck Level _____________ m CAP 437 / Other _____________ tonnes Foam/Halon/Water Installed Pressurized/Gravity Installed Installed | STATUS ________ ________ Current ☐ Valid to ______ Verified ☐ Operational ☐ Good/Damaged Operational ☐ Tested ☐ Operational ☐ | LAST INSPECTION ________ N/A N/A ________ ________ ________ ________ ________ ________ ________ |
|---|
HELICOPTER FUELING:
☐ Fuel Type: Jet A-1 ☐ Avgas ☐ Storage Capacity: _____________ gallons
☐ Fuel Quality Testing - Last Test: ______________ Result: Pass ☐ Fail ☐
☐ Fuel Hydrant/Hose Inspected - Last: ______________ Next: ______________
☐ HLO (Helicopter Landing Officer) - Trained: Yes ☐ No ☐ Name: ______________
OFFSHORE VESSEL TYPES:
☐ Supply Vessels (PSV) - Frequency: ______________ Max Size: _____________ ft
☐ Crew Boats - Frequency: ______________ Max Size: _____________ ft
☐ Standby Vessel - On Station: Yes ☐ No ☐ ETA if called: _____________ minutes
☐ Anchor Handling (AHTS) - Frequency: ______________ Max Bollard Pull: _____________ tonnes
☐ Tanker/Shuttle Tanker - Frequency: ______________ Max Size: _____________ DWT
☐ Construction Vessels - Frequency: ______________ Type: ______________
VESSEL MOORING/DOCKING:
| BERTH # _______ East West | LOCATION ___________ ___________ ___________ | MAX VESSEL __________ ____ ft ____ ft | FENDERS _________ Good/Dam. Good/Dam. | QUICK RELEASE _____________ Yes/No Yes/No | LAST INSPECT ____________ ____________ ____________ | STATUS ________ Operational ☐ Operational ☐ |
|---|
CARGO TRANSFER:
☐ Cargo Hose Management - Hydrotest Due: ______________ Last Tested: ______________
☐ Loading Arms - Last Inspected: ______________ Next Insp: ______________
☐ Mooring Lines - Condition: Good ☐ Replace ☐ Last Insp: ______________
WEATHER MONITORING:
| PARAMETER ________ Wind Speed Wind Direction Wave Height Swell Period Current Speed Visibility Air Temperature Barometric Pressure Lightning Risk | CURRENT _____________ ______ knots ______° ______ ft ______ sec ______ knots ______ miles ______ °F ______ mb Yes/No | FORECAST _____________ ______ knots ______° ______ ft ______ sec ______ knots ______ miles ______ °F ______ mb Yes/No | ALERT LEVEL ___________ Green/Yellow/Red N/A Green/Yellow/Red N/A N/A Green/Yellow/Red N/A N/A Green/Yellow/Red | MONITORING FREQUENCY ________ Continuous ☐ Continuous ☐ Continuous ☐ Continuous ☐ Continuous ☐ Hourly ☐ Hourly ☐ Hourly ☐ Continuous ☐ |
|---|
OPERATING LIMITS/CRITERIA:
| OPERATION ________ Helicopter Ops Crane/Lifting Boat Mooring/Transfer Diving Ops Drilling Ops Production Ops Evacuation (non-emerg) | MAX WIND __________ ______ kts ______ kts ______ kts ______ kts ______ kts ______ kts ______ kts | MAX WAVE __________ ______ ft ______ ft ______ ft ______ ft ______ ft ______ ft ______ ft | MAX CURRENT __________ N/A N/A ______ kts ______ kts ______ kts N/A N/A | LIGHTNING _________ No Ops No Ops No Ops No Ops N/A N/A N/A | RESTRICTIONS ________ Day/Night limits Boom restrictions Vessel size limits Depth limits Riser limits Shutdown criteria Boat limits |
|---|
SEMS ELEMENTS STATUS:
| ELEMENT ________ 1. General (Policy/Objectives) 2. Safety & Env Information 3. Hazards Analysis (PHA) 4. Management of Change (MOC) 5. Operating Procedures 6. Safe Work Practices 7. Training 8. Mechanical Integrity 9. Pre-Startup Review 10. Emergency Response & Control 11. Investigation of Incidents 12. Audit Program 13. Documentation & Records | STATUS _____________ Active ☐ Complete ☐ Current ☐ Active ☐ Current ☐ Active ☐ Compliant ☐ Program ☐ Complete ☐ Drilled ☐ Program ☐ Scheduled ☐ Compliant ☐ | LAST REVIEW ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ | NEXT REVIEW ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ | RESPONSIBLE ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ |
|---|
MANDATORY OFFSHORE TRAINING:
| COURSE ________ Basic Offshore Safety (BOSIET) HUET (Helicopter Underwater) Offshore Medical FOET (Further Offshore Emerg) TEMPSC/Lifeboat Coxswain Helideck Operations (HLO) Crane Operator Banksman/Slinger Permit Authorizer | FREQUENCY __________ 4 years 4 years 2 years 4 years Annual 2 years 2 years 2 years 2 years | LAST TRAINED _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ | NEXT DUE _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ | # COMPLETE __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ | % COMPLIANT ________ _____% _____% _____% _____% _____% _____% _____% _____% _____% |
|---|
CREW MATRIX:
| POSITION ________ OIM Marine Supervisor Barge Master Crane Operator Medic Safety Officer | NAME ________ ________ ________ ________ ________ ________ ________ | QUALIFICATIONS ________ ________ ________ ________ ________ ________ ________ | CERT EXPIRY ___________ ___________ ___________ ___________ ___________ ___________ ___________ | COMPETENCY __________ Level 5 Level 4 Level 4 Level 3 Level 3 Level 4 | MEDICAL ________ Current/Expired Current/Expired Current/Expired Current/Expired Current/Expired Current/Expired |
|---|
DRILL SCHEDULE:
| DRILL TYPE ________ Abandon Platform Fire Drill Gas Release Drill Rescue Boat (MOB) Drill Lifeboat Launch (onload) Lifeboat Launch (freefall) Helicopter Emergency Medical Emergency Oil Spill Response Severe Weather/Hurricane | FREQUENCY _________ Monthly Weekly Monthly Monthly Quarterly 6 Months Quarterly Monthly Quarterly Annual | LAST DRILL __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ | NEXT DUE ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ | RESPONSE TIME _____________ ______ min ______ min ______ min ______ min ______ min ______ min ______ min ______ min ______ min N/A | PERFORMANCE ________ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ | COMMENTS _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ |
|---|
| # | ACTION REQUIRED | RESPONSIBLE | DUE DATE | STATUS | ||
|---|---|---|---|---|---|---|
| 1 2 3 4 5 | Service lifeboat #2 davit (stuck during drill) Re-certify crane #1 (cert expires 03/2025) Conduct SEMS audit for Q2 2025 Replace expired immersion suits (12 units) Update severe weather plan with new thresholds | Maintenance OIM Safety Officer Logistics OIM | 02/15/2025 03/01/2025 05/30/2025 01/30/2025 04/15/2025 | In Progress ☐ Planned ☐ Open ☐ Complete ☐ In Progress ☐ |
ASSESSMENT TEAM:
Name: ______________ Title: Offshore Installation Manager (OIM) Signature: ______________
Name: ______________ Title: Marine Supervisor Signature: ______________
Name: ______________ Title: Safety Officer Signature: ______________
Name: ______________ Title: Operations Superintendent Signature: ______________
Name: ______________ Title: HSE Advisor Signature: ______________
APPROVALS:
Asset Manager: ______________ Date: ______________ Signature: ______________
HSE Director: ______________ Date: ______________ Signature: ______________
OIM: ______________ Date: ______________ Signature: ______________
REVIEW DATE: ______________ NEXT REVIEW DATE: ______________