Offshore Operations Risk Assessment template

Free Offshore Operations Risk Assessment template for oil & gas you can edit online and download as PDF. Covers offshore facility information, temporary refuge (tr) and muster area status, emergency evacuation and escape equipment

Offshore Facility Information

ASSESSMENT ID: OFF-__________ DATE: ______________ TIME: ______________

FACILITY NAME: ______________ LOCATION: ______________ BLOCK: ______________

FACILITY TYPE: Fixed Platform ☐ Jackup ☐ Semi ☐ Drillship ☐ FPSO ☐ TLP ☐ Spar ☐

WATER DEPTH: _____________ ft DISTANCE TO SHORE: _____________ miles HELIPORT: Yes ☐ No ☐

OPERATOR: ______________ CONTRACTOR: ______________ PERSONNEL ON BOARD: ______

Offshore Operations Risk Assessment Matrix - Sems (Api Rp 75)

HAZARD CATEGORYHAZARD DESCRIPTIONPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (A-E)RISK INDEX
Marine Operations / Vessel Interface-Vessel collision
-Supply boat strike
-Mooring failure
-Dynamic positioning failure
-Loading hose failure
-Collision
-Platform damage
-Loss of integrity
-Personnel injury
-Environmental release
-VTS/Vessel traffic system
-Standby vessel
-Radar
-Fender systems
-DP trials
-Watch circles
3 (Occasional)E (Catastrophic)12 (HIGH)
Helicopter Operations-Helicopter crash
-Hard landing
-Refueling incident
-Sling load drop
-Personnel transfer incident
-Fatalities
-Platform fire
-Loss of air transport access
-Helideck cert
-Fuel isolation
-Foam system
-Net perimeter
-HLO training
2 (Remote)E (Catastrophic)8 (HIGH)
Lifting Operations (Offshore)-Crane failure
-Overload
-Sling failure
-Tag line entanglement
-Load swing
-Boom failure
-Dropped object
-Personnel injury
-Equipment damage
-Vessel/ platform damage
-Crane cert
-Load testing
-Hand signals
-Exclusion zones
-Lifting plan
4 (Probable)D (Hazardous)12 (HIGH)
Structural Integrity-Extreme weather
-Hurricane/ Cyclone
-Fatigue cracking
-Corrosion
-Seismic
-Scour
-Boat impact
-Platform collapse
-Loss of life
-Loss of production
-Environmental release
-Structural monitoring
-FMEA/ inspection
-Sacrificial anodes
-Coatings
-Marine growth removal
2 (Remote)E (Catastrophic)8 (HIGH)
Fire & Explosion-Hydrocarbon release
-Ignition
-Gas cloud explosion
-Jet fire
-Pool fire
-BLEVE
-Escalation
-Multiple fatalities
-Platform evacuation
-Total loss
-Fire and gas detection
-Deluge system
-Blast walls
-Passive fire protection
3 (Occasional)E (Catastrophic)12 (HIGH)
Evacuation & Escape-Facility abandonment
-Lifeboat malfunction
-Davits failure
-Muster area compromised
-Means of escape blocked
-Abandonment in rough seas
-Inability to evacuate
-Drowning
-Hypothermia
-Mass casualty
-TEMPSC (lifeboat)
-Muster areas
-Life rafts
-Escape routes
-PA/GA system
-MOB boat
3 (Occasional)E (Catastrophic)12 (HIGH)
Diving Operations (if applicable)-Diving emergencies
-Equipment failure
-Lost diver
-Mixed gas issues
-Decompression chamber fire
-Decompression sickness
-Arterial gas embolism
-Drowning
-Fatality
-Diving supervisor
-Dive plan
-Standby diver
-Hyperbaric lifeboat
-Chamber
3 (Occasional)E (Catastrophic)12 (HIGH)

Temporary Refuge (Tr) And Muster Area Status

TEMPORARY REFUGE (TR) INFORMATION:

TR LOCATION: ______________ CAPACITY: ______ persons CURRENT POB: ______
TR SYSTEMS STATUS:
SYSTEM ________ HVAC/Overpressure Fire/gas detection Communications (internal) Communications (external) Emergency lighting Breathing air supply Survivor support equipment TR integrity (fire rated)STATUS _____________ Operational ☐ Operational ☐ Operational ☐ Operational ☐ Operational ☐ Operational ☐ Complete ☐ Verified ☐LAST TEST __________ __________ __________ __________ __________ __________ __________ __________ __________NEXT TEST __________ __________ __________ __________ __________ __________ __________ __________ __________COMMENTS ________ ________ ________ ________ ________ ________ __________ hours remaining Food/Water/Blankets A60/A0 rating

MUSTER AREAS:

AREA ____________ Primary Secondary HelideckLOCATION ___________ ___________ ___________ ___________CAPACITY ________ ______ ______ ______PROTECTION __________ Covered ☐ Covered ☐ Open ☐COMMUNICATIONS ________ PA/Radio PA/Radio RadioEQUIPMENT ________ Life jackets Life jackets Fire fightingSTATUS ________ Ready ☐ Ready ☐ Ready ☐

Emergency Evacuation And Escape Equipment

TEMPSC (TOTALLY ENCLOSED MOTOR PROPELLED SURVIVAL CRAFT) - LIFEBOATS:

BOAT # ______ #1 #2 #3 #4TYPE ________ Freefall Twin-fall Twin-fall FreefallCAPACITY ________ ______ ______ ______ ______DAVIT TYPE __________ Freefall Gravity Gravity FreefallLAST LAUNCH __________ __________ __________ __________ __________NEXT DUE _________ _________ _________ _________ _________STATUS __________ Ready ☐ Ready ☐ Ready ☐ Ready ☐COMMENTS ________ ________ ________ ________ ________

LIFE RAFTS AND OTHER EQUIPMENT:

EQUIPMENT TYPE ________ Liferafts (davit) Liferafts (throw-over) Lifebuoys Life Jackets Immersion Suits EPIRBs SARTs MOB Boat First Aid StationsQUANTITY ________ ________ ________ ________ ________ ________ ________ ________ 1 ________LOCATION ________ ________ ________ ________ All areas All areas TR/Bridge Bridge/Lifeboats Crane area VariousLAST INSPECT ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________NEXT DUE _________ _________ _________ _________ _________ _________ _________ _________ _________ _________STATUS ________ Ready ☐ Ready ☐ Complete ☐ _____% stocked _____% stocked Tested ☐ Tested ☐ Ready ☐ Stocked ☐

Offshore Crane And Lifting Operations

CRANE INVENTORY:

CRANE # _______ Crane 1 Crane 2 Crane 3TYPE ________ Pedestal Pedestal Knuckle BoomCAPACITY ________ ____ tons ____ tons ____ tonsLOCATION _________ Main Deck Main Deck HelideckLAST CERT __________ __________ __________ __________NEXT CERT __________ __________ __________ __________OPERATOR _________ _________ _________ _________STATUS ________ Operational ☐ Operational ☐ Operational ☐

LIFTING ACCESSORIES:

ITEM ________ Slings (wire) Slings (synthetic) Shackles Lifting Lugs Lifting Beams Baskets/Cages PadeyesQUANTITY ________ ________ ________ ________ ________ ________ ________ ________LAST INSPECT ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________NEXT INSPECT ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________CERTIFIED _________ Yes/No Yes/No Yes/No Yes/No Yes/No Yes/No Yes/NoCOLOR CODE __________ __________ __________ __________ N/A __________ N/A N/ASTATUS ________ Good/Damaged Good/Damaged Good/Damaged Inspected ☐ Good/Damaged Good/Damaged Inspected ☐

Helideck Operations

HELIDECK INFORMATION:

PARAMETER ________ Helideck Type D Value (Largest Helicopter) Helideck Certification Load Rating Fire Fighting System Perimeter Netting Fueling System Bonding/Grounding Weather StationVALUE ________ Raised/Deck Level _____________ m CAP 437 / Other _____________ tonnes Foam/Halon/Water Installed Pressurized/Gravity Installed InstalledSTATUS ________ ________ Current ☐ Valid to ______ Verified ☐ Operational ☐ Good/Damaged Operational ☐ Tested ☐ Operational ☐LAST INSPECTION ________ N/A N/A ________ ________ ________ ________ ________ ________ ________

HELICOPTER FUELING:

☐ Fuel Type: Jet A-1 ☐ Avgas ☐ Storage Capacity: _____________ gallons

☐ Fuel Quality Testing - Last Test: ______________ Result: Pass ☐ Fail ☐

☐ Fuel Hydrant/Hose Inspected - Last: ______________ Next: ______________

☐ HLO (Helicopter Landing Officer) - Trained: Yes ☐ No ☐ Name: ______________

Marine Operations And Vessel Interface

OFFSHORE VESSEL TYPES:

☐ Supply Vessels (PSV) - Frequency: ______________ Max Size: _____________ ft

☐ Crew Boats - Frequency: ______________ Max Size: _____________ ft

☐ Standby Vessel - On Station: Yes ☐ No ☐ ETA if called: _____________ minutes

☐ Anchor Handling (AHTS) - Frequency: ______________ Max Bollard Pull: _____________ tonnes

☐ Tanker/Shuttle Tanker - Frequency: ______________ Max Size: _____________ DWT

☐ Construction Vessels - Frequency: ______________ Type: ______________

VESSEL MOORING/DOCKING:

BERTH # _______ East WestLOCATION ___________ ___________ ___________MAX VESSEL __________ ____ ft ____ ftFENDERS _________ Good/Dam. Good/Dam.QUICK RELEASE _____________ Yes/No Yes/NoLAST INSPECT ____________ ____________ ____________STATUS ________ Operational ☐ Operational ☐

CARGO TRANSFER:

☐ Cargo Hose Management - Hydrotest Due: ______________ Last Tested: ______________

☐ Loading Arms - Last Inspected: ______________ Next Insp: ______________

☐ Mooring Lines - Condition: Good ☐ Replace ☐ Last Insp: ______________

Environmental Conditions And Monitoring

WEATHER MONITORING:

PARAMETER ________ Wind Speed Wind Direction Wave Height Swell Period Current Speed Visibility Air Temperature Barometric Pressure Lightning RiskCURRENT _____________ ______ knots ______° ______ ft ______ sec ______ knots ______ miles ______ °F ______ mb Yes/NoFORECAST _____________ ______ knots ______° ______ ft ______ sec ______ knots ______ miles ______ °F ______ mb Yes/NoALERT LEVEL ___________ Green/Yellow/Red N/A Green/Yellow/Red N/A N/A Green/Yellow/Red N/A N/A Green/Yellow/RedMONITORING FREQUENCY ________ Continuous ☐ Continuous ☐ Continuous ☐ Continuous ☐ Continuous ☐ Hourly ☐ Hourly ☐ Hourly ☐ Continuous ☐

OPERATING LIMITS/CRITERIA:

OPERATION ________ Helicopter Ops Crane/Lifting Boat Mooring/Transfer Diving Ops Drilling Ops Production Ops Evacuation (non-emerg)MAX WIND __________ ______ kts ______ kts ______ kts ______ kts ______ kts ______ kts ______ ktsMAX WAVE __________ ______ ft ______ ft ______ ft ______ ft ______ ft ______ ft ______ ftMAX CURRENT __________ N/A N/A ______ kts ______ kts ______ kts N/A N/ALIGHTNING _________ No Ops No Ops No Ops No Ops N/A N/A N/ARESTRICTIONS ________ Day/Night limits Boom restrictions Vessel size limits Depth limits Riser limits Shutdown criteria Boat limits

Safety And Environmental Management System (Sems) - Api Rp 75

SEMS ELEMENTS STATUS:

ELEMENT ________
1. General (Policy/Objectives)
2. Safety & Env Information
3. Hazards Analysis (PHA)
4. Management of Change (MOC)
5. Operating Procedures
6. Safe Work Practices
7. Training
8. Mechanical Integrity
9. Pre-Startup Review
10. Emergency Response & Control
11. Investigation of Incidents
12. Audit Program
13. Documentation & Records
STATUS _____________ Active ☐ Complete ☐ Current ☐ Active ☐ Current ☐ Active ☐ Compliant ☐ Program ☐ Complete ☐ Drilled ☐ Program ☐ Scheduled ☐ Compliant ☐LAST REVIEW ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________NEXT REVIEW ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________RESPONSIBLE ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________

Offshore Personnel Competency And Training

MANDATORY OFFSHORE TRAINING:

COURSE ________ Basic Offshore Safety (BOSIET) HUET (Helicopter Underwater) Offshore Medical FOET (Further Offshore Emerg) TEMPSC/Lifeboat Coxswain Helideck Operations (HLO) Crane Operator Banksman/Slinger Permit AuthorizerFREQUENCY __________ 4 years 4 years 2 years 4 years Annual 2 years 2 years 2 years 2 yearsLAST TRAINED _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________ _____________NEXT DUE _________ _________ _________ _________ _________ _________ _________ _________ _________ _________# COMPLETE __________ __________ __________ __________ __________ __________ __________ __________ __________ __________% COMPLIANT ________ _____% _____% _____% _____% _____% _____% _____% _____% _____%

CREW MATRIX:

POSITION ________ OIM Marine Supervisor Barge Master Crane Operator Medic Safety OfficerNAME ________ ________ ________ ________ ________ ________ ________QUALIFICATIONS ________ ________ ________ ________ ________ ________ ________CERT EXPIRY ___________ ___________ ___________ ___________ ___________ ___________ ___________COMPETENCY __________ Level 5 Level 4 Level 4 Level 3 Level 3 Level 4MEDICAL ________ Current/Expired Current/Expired Current/Expired Current/Expired Current/Expired Current/Expired

Offshore Drills And Exercises

DRILL SCHEDULE:

DRILL TYPE ________ Abandon Platform Fire Drill Gas Release Drill Rescue Boat (MOB) Drill Lifeboat Launch (onload) Lifeboat Launch (freefall) Helicopter Emergency Medical Emergency Oil Spill Response Severe Weather/HurricaneFREQUENCY _________ Monthly Weekly Monthly Monthly Quarterly 6 Months Quarterly Monthly Quarterly AnnualLAST DRILL __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________NEXT DUE ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________RESPONSE TIME _____________ ______ min ______ min ______ min ______ min ______ min ______ min ______ min ______ min ______ min N/APERFORMANCE ________ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐ Satisfactory ☐COMMENTS _________ _________ _________ _________ _________ _________ _________ _________ _________ _________ _________

Action Plan And Corrective Actions

#ACTION REQUIREDRESPONSIBLEDUE DATESTATUS
1 2 3 4 5Service lifeboat #2 davit (stuck during drill) Re-certify crane #1 (cert expires 03/2025) Conduct SEMS audit for Q2 2025 Replace expired immersion suits (12 units) Update severe weather plan with new thresholdsMaintenance OIM Safety Officer Logistics OIM02/15/2025 03/01/2025 05/30/2025 01/30/2025 04/15/2025In Progress ☐ Planned ☐ Open ☐ Complete ☐ In Progress ☐

Assessment Team And Approval

ASSESSMENT TEAM:

Name: ______________ Title: Offshore Installation Manager (OIM) Signature: ______________

Name: ______________ Title: Marine Supervisor Signature: ______________

Name: ______________ Title: Safety Officer Signature: ______________

Name: ______________ Title: Operations Superintendent Signature: ______________

Name: ______________ Title: HSE Advisor Signature: ______________

APPROVALS:

Asset Manager: ______________ Date: ______________ Signature: ______________

HSE Director: ______________ Date: ______________ Signature: ______________

OIM: ______________ Date: ______________ Signature: ______________

REVIEW DATE: ______________ NEXT REVIEW DATE: ______________