Lifting Operations Risk Assessment template

Free Lifting Operations Risk Assessment template for oil & gas you can edit online and download as PDF. Covers lifting operation information, lift categorization, lifting operations risk assessment matrix.

Lifting Operation Information

ASSESSMENT ID: LFT-__________ DATE: ______________ TIME: ______________

FACILITY NAME: ______________ LOCATION: ______________ AREA: ______________

LIFT TYPE: Routine ☐ Critical ☐ Engineered ☐ Complex ☐ Personnel ☐ Subsea ☐

LIFT DESCRIPTION: ______________

CRANE/EQUIPMENT ID: ______________ CAPACITY: _____________ tons OPERATOR: ______________

Lift Categorization

LIFT CLASSIFICATION:

☐ ROUTINE LIFT - Standard lift within normal operating parameters, not exceeding 80% of crane capacity, no special hazards, no lifts over live equipment or personnel.
☐ CRITICAL LIFT - Any lift meeting ONE OR MORE of these criteria:
☐ Lift > 80% of crane rated capacity
☐ Lift over live equipment/process areas
☐ Lift over occupied facilities
☐ Multiple crane lift
☐ Lift of personnel (manbasket/manriding)
☐ Lift in high wind or restricted visibility
☐ Unusual or complex rigging arrangement
☐ Lift of hazardous materials
☐ Lift in environmentally sensitive area
☐ First use of new lift procedure/equipment
☐ ENGINEERED LIFT - Exceeding 100% of crane rated capacity or requiring engineering analysis. Requires engineered lift plan and PE stamp.

THIS LIFT IS CLASSIFIED AS: ☐ ROUTINE ☐ CRITICAL ☐ ENGINEERED

IF CRITICAL OR ENGINEERED, A WRITTEN LIFT PLAN IS REQUIRED AND ATTACHED.

LIFT PLAN #: ______________ ATTACHED: Yes ☐ No ☐

Lifting Operations Risk Assessment Matrix

HAZARD CATEGORYHAZARD DESCRIPTIONPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (A-E)RISK INDEX
Dropped Objects-Equipment/ rigging failure
-Load instability
-Slip/tag line issues
-Crane malfunction
-Fatality
-Serious injury
-Equipment damage
-Production loss
-Exclusion zone
-Barricading
-Tag lines
-Proper rigging
-Load control
-Redundant hoists
4 (Probable)E (Catastrophic)16 (EXTREME)
Crane Stability / Failure-Crane overturn
-Outrigger failure
-Boom failure
-Swing away from level
-Ground subsidence
-Crane tip- over
-Structural collapse
-Fatality
-Multiple injuries
-Ground condition assessment
-Outrigger pads
-Load indicator
-Limit switches
-Level sensors
3 (Occasional)E (Catastrophic)12 (HIGH)
Rigging Failure-Slings failure
-Shackle failure
-Hook failure
-Improper rigging angle
-Uncertified gear
-Dropped load
-Load runaway
-Personnel injury
-Equipment damage
-Pre-use inspection
-Certified rigging
-SWL marked
-Angle limits
-Redundant slings
4 (Probable)D (Hazardous)12 (HIGH)
Personnel Injury-Struck by load
-Crushed between objects
-Swing radius contact
-Tag line entanglement
-Slips/trips
-Fatality
-Crushing
-Amputation
-Serious injury
-Exclusion zone
-Barricades
-Tag lines
-Hand signals
-Banksman
-Operator visibility
-Lighting
5 (Almost Certain)E (Catastrophic)20 (EXTREME)
Environmental Factors-High wind (> limits)
-Poor visibility
-Lightning
-Rain/ice
-Extreme temps
-Sea state (offshore)
-Loss of load control
-Crane instability
-Collision
-Dropped load
-Wind monitoring
-Weather limits
-Lightning detector
-Postpone if needed
-DP
4 (Probable)D (Hazardous)12 (HIGH)
Power Lines / Electrical-Crane contact with power lines
-Ground fault
-Static discharge
-Electrocution
-Fatality
-Arc flash
-Fire
-Equipment damage
-Spotting
-Minimum clearance
-Barricades
-Insulated links
-Groundman
-Power isolation
3 (Occasional)E (Catastrophic)12 (HIGH)
Multiple Crane Lifts-Crane-to- crane conflict
-Load instability
-Uneven load sharing
-Comm failure
-Collision
-Uneven load sharing
-Dropped load
-Crane overload
-Lift plan
-One supervisor
-Comms
-Synchron- ization
-Load cells
-Tilt indicators
3 (Occasional)D (Hazardous)9 (HIGH)

Load Information And Calculations

LOAD DETAILS:

LOAD DESCRIPTION: ______________ LOAD WEIGHT: _____________ lbs/kg/tons DIMENSIONS: L: ______ W: ______ H: ______ ft/m LOAD CENTER OF GRAVITY: Marked ☐ Calculated ☐ Estimated ☐ Location: ______________ LIFT POINTS: Number: ______ Type: Padeyes ☐ Lugs ☐ Slings ☐ Chokers ☐ SPECIAL HANDLING: Fragile ☐ Hazardous ☐ Hot ☐ Precision ☐ Other: ______________

CRANE / LIFTING EQUIPMENT:

CRANE ID: ______________ TYPE: Mobile ☐ Crawler ☐ Pedestal ☐ Overhead ☐ Other: ______________ CONFIGURATION: Boom length: ______ ft Jib: Yes ☐ No ☐ Type: ______________ Fly: ______ ft CAPACITY AT CONFIGURATION: _____________ tons at radius: ______ ft (per load chart)
LIFT CALCULATIONS: LIFT RADIUS: _____________ ft CAPACITY @ RADIUS: _____________ tons LOAD WEIGHT: _____________ tons RIGGING WEIGHT: _____________ tons BLOCK/HOOK WEIGHT: _____________ tons TOTAL LOAD: _____________ tons CAPACITY UTILIZATION: _____________ % (Total Load / Capacity)
MARGIN OF SAFETY: _____________ tons (Capacity - Total Load)
☐ LIFT WITHIN CAPACITY - Proceed
☐ EXCEEDS CAPACITY (>100%) - REDESIGN REQUIRED
☐ CRITICAL LIFT (>80% or other criteria) - LIFT PLAN REQUIRED

RIGGING ARRANGEMENT:

RIGGING METHOD: Single leg ☐ Bridle (2-leg) ☐ 3-leg ☐ 4-leg ☐ Basket ☐ Choker ☐ Other: _________
SLING CALCULATIONS: SLING TYPE: Wire rope ☐ Synthetic ☐ Chain ☐ Size: ______ in Grade: ______ SLING ANGLE: ______ degrees from vertical ANGLE FACTOR: ______ MAX SLING LOAD: (Load / # legs) x Angle Factor = _____________ tons SLING SWL (Safe Working Load): _____________ tons SLING UTILIZATION: _____________ % (Max Sling Load / SWL)
SHACKLE/HARDWARE: SHACKLE SIZE: ______ tons TYPE: Screw pin ☐ Safety bolt ☐ Other: ______ SHACKLE SWL: _____________ tons LOAD ON SHACKLE: _____________ tons OK: Yes ☐ No ☐
LIFT POINT SWL: _____________ tons LOAD ON LIFT POINT: _____________ tons OK: Yes ☐ No ☐

Pre-Lift Inspection Checklist

CRANE INSPECTION (To be completed by Crane Operator):

☐ Daily inspection complete - No defects noted
☐ Load chart available and current
☐ Load indicator/limiter functioning - Tested: Yes ☐ No ☐
☐ Anti-two block functioning - Tested: Yes ☐ No ☐
☐ Boom angle indicator working
☐ Swing brake working
☐ Hoist brakes working
☐ Wire rope condition good - No kinks, birdcaging, broken wires
☐ Hooks - Safety latches working, no deformation
☐ Hydraulic systems - No leaks
☐ Tires/tracks condition good
☐ Outriggers - Fully extended, pads in place, level
☐ Operator seat/controls functioning
☐ Fire extinguisher in cab - Inspected: ______________
☐ Crane level - Level within 1% (0.5°): Bubble level OK ☐ Digital OK ☐

RIGGING INSPECTION (To be completed by Rigger/Banksman):

SLINGS:
☐ All slings have current certification tags
☐ Wire rope slings - No broken wires, kinks, crushing, corrosion
☐ Synthetic slings - No cuts, abrasion, heat damage, UV damage
☐ Chain slings - No stretch, cracks, wear
☐ Slings correct size and type for lift
HARDWARE:
☐ Shackles - Correct size, pins straight, no deformation
☐ Hooks - Safety latches working, no deformation, no cracks
☐ Eye bolts - Shouldered, full engagement, no bending
☐ Lifting beams/spreaders - Certified, no damage
☐ Swivels - Moving freely, no damage
☐ Lifting lugs/padeyes - No deformation, corrosion, cracks
LIFT AREA:
☐ Exclusion zone established - Radius: ______ ft
☐ Barricades in place - Type: ______________
☐ Warning signs posted
☐ Ground conditions stable - Bearing capacity: ______ tons/sq ft
☐ Overhead obstructions identified - Power lines ☐ Structures ☐ Other: ______
☐ Underground utilities identified - Locate marks: Yes ☐ No ☐
☐ Lighting adequate (if night work)
☐ Communications check - Radio channel: ______ Working: Yes ☐ No ☐

WEATHER CHECK:

Current wind speed: ______________ mph/kts Gusts: ______________ mph/kts Wind limit for this lift: ______________ mph/kts (per crane manufacturer)
☐ Wind within limits - Proceed
☐ Wind approaching limits - Monitor closely
☐ Wind EXCEEDS limits - DO NOT PROCEED
Visibility: Good ☐ Fair ☐ Poor ☐ (If poor, postpone lift) Lightning within 10 miles? Yes ☐ No ☐ (If yes, postpone lift) Rain/Ice? Yes ☐ No ☐ (If yes, assess and possibly postpone)

Critical Lift Plan (For Critical & Engineered Lifts)

LIFT PLAN NUMBER: ______________ REVISION: ______ DATE: ______________

PREPARED BY: ______________ TITLE: ______________

REVIEWED BY: ______________ TITLE: ______________

APPROVED BY: ______________ TITLE: ______________

LIFT DESCRIPTION: ______________

______________

ENGINEERING CALCULATIONS:

☐ Load weight verification - Method: ______________ Verified by: ______________

☐ Load distribution analysis - Attached: Yes ☐ No ☐

☐ Crane capacity verification - Multiple configurations checked: Yes ☐ No ☐

☐ Rigging design - Engineered rigging drawing attached: Yes ☐ No ☐

☐ Lift point adequacy - Verified by: ______________

☐ Ground bearing pressure calculation - ______ tons/sq ft OK: Yes ☐ No ☐

☐ Structural analysis of supporting structure - Attached: Yes ☐ No ☐

☐ Wind/weather contingency plan - Attached: Yes ☐ No ☐

LIFT SEQUENCE:

1. ______________

2. ______________

3. ______________

4. ______________

5. ______________

COMMUNICATIONS PLAN:

Primary communication method: Radio channel: ______ Backup method: Hand signals ☐ Other: ______

Communication hierarchy: 1. Lift Supervisor 2. Crane Operator 3. Banksman 4. Other

EMERGENCY PROCEDURES:

☐ Emergency stop signal established - Signal: ______________

☐ Contingency for load hang-up

☐ Contingency for equipment failure

☐ Contingency for weather deterioration

☐ Rescue plan for personnel basket (if applicable)

ATTACHMENTS:

☐ Crane load chart

☐ Site/lift area drawing

☐ Rigging arrangement drawing

☐ Lift sequence diagram

☐ Engineering calculations

☐ Risk assessment

☐ Crane certification

☐ Rigging certification

☐ Personnel competency records

☐ Other: ______________

Personnel Basket / Manriding Operations (If Applicable)

PERSONNEL BASKET OPERATIONS REQUIRE SPECIAL APPROVAL AND CONTROLS:

BASKET INFORMATION:

☐ Basket certified for personnel lifting - Cert #: ______________ Expiry: ______________

☐ Basket inspected before use - By: ______________ Date: ______________

☐ Basket capacity: ______ persons Maximum load: ______ lbs/kg

☐ Basket has: Self-closing gate ☐ Non-slip floor ☐ Handholds ☐ Tag lines ☐

PERSONNEL LIFTING REQUIREMENTS:

☐ Crane specifically approved for personnel lifting

☐ Crane equipped with secondary braking system

☐ Crane has anti-two-block device

☐ Crane has load indicator with audible alarm

☐ Crane operator specifically trained for personnel lifts

☐ Dedicated signal person in constant communication

☐ Personnel in basket wear full-body harness attached to basket

☐ No other lifts during personnel basket operation

☐ Wind speed limits strictly enforced (typically <15 mph)

☐ Personnel basket operations during daylight only (unless special approval)

PERSONNEL BASKET PRE-USE BRIEFING:

☐ Emergency procedures reviewed

☐ Boarding/disembarking procedures reviewed

☐ Harness attachment reviewed

☐ Communications checked

☐ Weather within limits verified

ATTENDANTS IN BASKET:

1. Name: ______________ Signature: ______________

2. Name: ______________ Signature: ______________

3. Name: ______________ Signature: ______________

4. Name: ______________ Signature: ______________

Lift Team Roles And Responsibilities

LIFT SUPERVISOR (Person in charge of the lift):

Name: ______________ Signature: ______________

Responsibilities:

☐ Ensure lift plan is followed

☐ Conduct pre-lift briefing

☐ Verify all checks complete

☐ Control the lift sequence

☐ Stop lift if unsafe conditions develop

CRANE OPERATOR:

Name: ______________ Signature: ______________ Cert #: ______________

Responsibilities:

☐ Operate crane within limitations

☐ Follow signals from lift supervisor/banksman

☐ Monitor crane performance and load indicators

☐ Stop lift if unsafe conditions develop

RIGGER / BANKSMAN:

Name: ______________ Signature: ______________ Cert #: ______________

Responsibilities:

☐ Inspect rigging before use

☐ Attach/detach loads correctly

☐ Guide load using tag lines

☐ Keep personnel clear of lift area

☐ Give clear signals to operator

SIGNAL PERSON (if different from Banksman):

Name: ______________ Signature: ______________

Responsibilities:

☐ Give all crane movement signals

☐ Ensure only one person gives signals

SAFETY WATCH:

Name: ______________ Signature: ______________

Responsibilities:

☐ Monitor exclusion zone

☐ Watch for changing conditions

☐ Stop work if unsafe conditions develop

Pre-Lift Briefing (Toolbox Talk)

DATE: ______________ TIME: ______________ LOCATION: ______________

ATTENDEES: (All lift team members must attend and sign)

NAME ROLE SIGNATURE ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________ ______________

BRIEFING TOPICS COVERED:

☐ Lift scope and objective

☐ Load weight and dimensions

☐ Crane configuration and capacity

☐ Lift radius and swing path

☐ Rigging arrangement and inspection status

☐ Exclusion zone and barricading

☐ Communication methods and signals

☐ Roles and responsibilities

☐ Potential hazards and controls

☐ Emergency procedures

☐ Weather limits and monitoring

☐ Stop work authority

QUESTIONS / CONCERNS ADDRESSED:

______________

______________

ALL TEAM MEMBERS UNDERSTAND THEIR ROLES AND THE LIFT PLAN.

Lift Supervisor Signature: ______________ Date: ______________

Lift Execution Checklist

BEFORE EACH LIFT:

☐ Pre-lift briefing completed
☐ Area secured - Barricades in place, personnel clear
☐ Communications check - All radios working, same channel
☐ Weather within limits - Wind: ______ mph Vis: Good ☐
☐ Final rigging check - All connections secure
☐ Tag lines attached and ready
☐ Load balance confirmed
☐ Lift supervisor ready to direct

DURING LIFT:

☐ Lift smoothly - No sudden movements
☐ Load kept as low as practical while moving
☐ Tag lines used to control load
☐ Constant communication maintained
☐ Load watched for shifting
☐ Personnel stay clear of load and swing radius
☐ Crane operator monitors load indicator continuously
☐ Lift supervisor monitors entire operation

AFTER LIFT:

☐ Load landed and secured
☐ Rigging removed and inspected for damage
☐ Crane secured (boom down, parking brake set)
☐ Area returned to normal
☐ Post-lift debrief conducted (if needed)
☐ Lift documented (if critical/engineered)

Lift Log / Record

#DATELIFT DESCLOAD (tons)CRANE USEDOPERATORNOTES
1 2 3 4__________ __________ __________ ____________________ __________ __________ ____________________ __________ __________ ______________________ ____________ ____________ ________________________ ____________ ____________ ____________________ ________ ________ ________

Hand Signals For Crane Operations

HOIST LOAD Forearm up, index finger pointing up, move in small circlesLOWER LOAD Arm extended down, index finger pointing down, move in small circlesSWING (direction) Arm extended, point in direction of swing, move in small circlesSTOP Arm extended, hand open, palm down, move side to sideEMERGENCY STOP Both arms waved rapidly

Action Plan And Corrective Actions

#ACTION REQUIREDRESPONSIBLEDUE DATESTATUS
1 2 3 4 5Annual crane certification due (Crane #1) Replace damaged synthetic sling (S-023) Update critical lift procedure for new crane Calibrate load indicator on Crane #2 Conduct refresher training for riggersMaintenance Rigger Lift Super Crane Vendor HSE03/15/2025 01/20/2025 02/28/2025 01/30/2025 04/15/2025Scheduled ☐ Complete ☐ In Progress ☐ Open ☐ Planned ☐

Assessment Team And Approval

ASSESSMENT TEAM:

Name: ______________ Title: Lift Supervisor Signature: ______________

Name: ______________ Title: Crane Operator Signature: ______________

Name: ______________ Title: Rigger/Banksman Signature: ______________

Name: ______________ Title: Safety Officer Signature: ______________

Name: ______________ Title: Engineer (for critical lifts) Signature: ______________

APPROVALS:

Operations Manager: ______________ Date: ______________ Signature: ______________

HSE Manager: ______________ Date: ______________ Signature: ______________

Lift Supervisor: ______________ Date: ______________ Signature: ______________

REVIEW DATE: ______________ NEXT REVIEW DATE: ______________