Hydrocarbon Release Risk Assessment template

Free Hydrocarbon Release Risk Assessment template for oil & gas you can edit online and download as PDF. Covers facility information, leak detection and monitoring systems, hydrocarbon inventory and isolation capabilities.

Facility Information

ASSESSMENT ID: HCR-__________ DATE: ______________ TIME: ______________

FACILITY NAME: ______________ LOCATION: ______________ UNIT: ______________

FACILITY TYPE: Onshore ☐ Offshore ☐ Pipeline ☐ Terminal ☐ Refinery ☐

OPERATOR: ______________ DATE OF REVIEW: ______________ REVISION NUMBER: ______

Tier 1 / Tier 2 Process Safety Event Assessment - Api Rp 754

PROCESS UNIT/ SYSTEMHAZARD DESCRIPTIONPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (A-E)RISK INDEX
Separator / Vessels-Overpressure / Overfill
-Level control failure
-Pressure safety valve failure
-Corrosion/ erosion
-Catastrophic vessel rupture
-BLEVE
-Large hydrocarbon release
-Fire/Explosion
-Fatalities
-Environmental damage
-PSV relief
-Level transmitters
-High-high level alarms
-DCS/SIS interlocks
-Inspection schedule
2 (Remote)E (Catastrophic)8 (HIGH)
Piping Systems / Manifolds-Flange leak
-Valve stem leak
-Gasket blow- out
-Corrosion under insulation
-Mechanical damage
-Jet fire
-Pool fire
-Vapor cloud explosion
-Toxic exposure
-Evacuation
-Production loss
-Joint inspection
-Leak detection system
-Regular leak patrol
-Corrosion monitoring
-Thermal imaging
3 (Occasional)D (Hazardous)9 (HIGH)
Pumps / Compressors-Seal failure
-Casing rupture
-Lube oil leak
-Vibration induced failure
-Overheating
-Flammable release
-Flash fire
-Personnel injury
-Equipment damage
-Seal monitoring
-Mechanical seals
-Containment dikes
-Vibration monitoring
-Remote ESD
4 (Probable)C (Major)8 (HIGH)
Storage Tanks-Tank overfill
-Floating roof failure
-Tank bottom leak
-Lightning strike
-Seal fire
-Corrosion
-Major hydrocarbon release
-Tank fire
-Soil/ground- water contamination
-Vapor cloud
-Dike/ bunding
-Level gauging
-Overfill prevention system
-Lightning protection
-Cathodic protection
2 (Remote)E (Catastrophic)8 (HIGH)
Loading / Unloading Operations-Loading arm failure
-Hose rupture
-Overpressure
-Coupling failure
-Truck/train movement during connection
-Vapor cloud explosion
-Pool fire
-Personnel burn
-Product loss
-Grounded bonding
-Emergency shutdown system
-Breakaway couplings
-Excess flow valves
-Operator training
3 (Occasional)D (Hazardous)9 (HIGH)
Heat Exchangers-Tube rupture
-Gasket failure
-Thermal fatigue
-Corrosion
-Bolting failure
-Rapid pressure build-up
-Cross- contamination
-Flammable release
-H2S exposure
-Pressure relief
-Tube integrity monitoring
-Thermal analysis
-NDT inspection
3 (Occasional)D (Hazardous)9 (HIGH)

Leak Detection And Monitoring Systems

GAS DETECTION:

TYPE ________ Point IR Catalytic Open Path IR Ultrasonic H2S O2 DeficiencyLOCATION ________ ________ ________ ________ ________ ________ ________# UNITS _______ _______ _______ _______ _______ _______ _______LAST CAL ________ ________ ________ ________ ________ ________ ________STATUS ________ Operational ☐ Operational ☐ Operational ☐ Operational ☐ Operational ☐ Operational ☐ALARM SETTING ____________ ______ %LEL ______ %LEL ______ %LEL ______ dB ______ ppm ______ %TESTED ________ ________ ________ ________ ________ ________ ________

FIRE DETECTION:

TYPE ________ Heat Detectors Smoke Detectors Flame Detectors Fusible PlugsLOCATION ________ ________ ________ ________ ________# UNITS _______ _______ _______ _______ _______LAST TEST ________ ________ ________ ________ ________STATUS ________ Operational ☐ Operational ☐ Operational ☐ Operational ☐RESPONSE TIME _____________ ______ sec ______ sec ______ sec N/AACTIVATION ________ ________ ________ ________ ________

Hydrocarbon Inventory And Isolation Capabilities

ISOLATION POINTS:

SECTION ________ Inlet Isolation Outlet Isolation Emergency Isolation (ESD) Blowdown Valve PSV InletVALVE TAG _________ __________ __________ __________ __________ __________VALVE TYPE ____________ Gate/Ball ☐ Gate/Ball ☐ Gate/Ball ☐ Gate/Ball ☐ Gate/Ball ☐ACTUATION _________ Manual ☐ Auto ☐ Manual ☐ Auto ☐ Manual ☐ Auto ☐ Manual ☐ Auto ☐ Manual ☐ Auto ☐LOCATION ___________ __________ __________ __________ __________ __________ACCESSIBILITY _____________ Good ☐ Poor ☐ Good ☐ Poor ☐ Good ☐ Poor ☐ Good ☐ Poor ☐ Good ☐ Poor ☐LAST TESTED ________ ________ ________ ________ ________ ________

HYDROCARBON INVENTORY:

PROCESS UNIT ________ ________ ________FLUID TYPE __________ __________ __________MAX INVENTORY ________ ________ ________PRESSURE ________ ________ ________TEMPERATURE ___________ ___________ ___________PHASE ________ ________ ________CONTAINMENT TYPE ________ ________ ________

Release Scenario Modeling And Consequence Analysis

WORST-CASE RELEASE SCENARIO (EPA RMP):

Scenario Description: ______________ Release Rate: _____________ Duration: _____________ Total Quantity: _____________ Affected Area: _____________ Population at Risk: _____________ Flammable Radius: _____________ Toxic Radius: _____________ Environmental Impact: ______________

ALTERNATIVE RELEASE SCENARIO:

Scenario Description: ______________ Release Rate: _____________ Duration: _____________ Total Quantity: _____________ Mitigating Factors: ______________

Release Prevention And Mitigation Measures

PRIMARY CONTAINMENT:

☐ Pressure Relief Devices (PSV/PRV) - Last Tested: _________

☐ Rupture Discs - Last Tested: _________

☐ High Integrity Pressure Protection Systems (HIPPS) - Last Tested: _________

☐ Automatic Shutdown Systems - Last Tested: _________

SECONDARY CONTAINMENT:

☐ Bunds/Dikes - Condition: Good ☐ Needs Repair ☐ Capacity: ________ gallons

☐ Drainage Systems - Last Inspected: _________ Flow Path Clear: Yes ☐ No ☐

☐ Blowdown Systems - Last Tested: _________ Capacity: ________

☐ Flare/Vent Systems - Last Inspected: _________ Status: Operational ☐ Needs Maint ☐

RELEASE DETECTION:

☐ Gas Detection Coverage - Gap Analysis Completed: Yes ☐ No ☐

☐ Flame Detection Coverage - Gap Analysis Completed: Yes ☐ No ☐

☐ CCTV Monitoring - Coverage: _____________ Recording: Yes ☐ No ☐

☐ Operator Patrol Frequency: _____________ Last Patrol: _____________

Tier Definitions And Reporting (Api Rp 754)

TIER 1 - LOSS OF PRIMARY CONTAINMENT (LOPC) with greatest consequence:

☐ Release ≥ 1 metric ton (flammable/toxic)

☐ Fire/Explosion with ≥ $100K damage

☐ Evacuation/Community impact

☐ Fatality/Serious injury

TIER 2 - LOSS OF PRIMARY CONTAINMENT (LOPC) with significant consequence:

☐ Release ≥ 100 kg (flammable/toxic)

☐ Fire/Explosion with < $100K damage

☐ Shelter-in-place/Medical treatment

☐ Environmental impact

TIER 3 - CHALLENGES TO SAFETY SYSTEMS:

☐ PSV activation

☐ High-high alarm activation

☐ Near-miss LOPC

☐ Demand on safety system

TIER 4 - OPERATING DISCIPLINE / MANAGEMENT SYSTEM:

☐ Deviations from procedure

☐ Equipment failures (non-LOPC)

☐ Audit findings

☐ Training deficiencies

Action Plan And Corrective Actions

#ACTION REQUIREDRESPONSIBLEDUE DATESTATUS
1 2 3 4 5________ ________ ________ ________ _____________________ _____________ _____________ _____________ __________________________ _____________ _____________ _____________ _____________Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐ Open ☐ In Prog ☐ Complete ☐

Assessment Team And Approval

ASSESSMENT TEAM:

Name: ______________ Title: ______________ Signature: ______________

Name: ______________ Title: ______________ Signature: ______________

Name: ______________ Title: ______________ Signature: ______________

Name: ______________ Title: ______________ Signature: ______________

APPROVALS:

Operations Manager: ______________ Date: ______________ Signature: ______________

HSE Manager: ______________ Date: ______________ Signature: ______________

Process Safety Engineer: ______________ Date: ______________ Signature: ______________

REVIEW DATE: ______________ NEXT REVIEW DATE: ______________