Drilling Operations Risk Assessment template

Free Drilling Operations Risk Assessment template for oil & gas you can edit online and download as PDF. Covers rig/drilling site information, risk matrix (iso 31000 / iadc hse guidelines), drilling equipment integrity and certifi

Rig/Drilling Site Information

ASSESSMENT ID: DRL-__________ DATE: ______________ TIME: ______________

FACILITY/RIG NAME: ______________ LOCATION: ______________ WELL ID: ______________

DRILLING CONTRACTOR: ______________ OPERATOR: ______________ DATE OF REVIEW: ______________

RIG TYPE: LAND ☐ JACKUP ☐ SEMI ☐ DRILLSHIP ☐ WATER DEPTH: ______ft RIG DEPTH RATING: ______ft

CURRENT OPERATION: DRILLING ☐ COMPLETION ☐ WORKOVER ☐ ABANDONMENT ☐

Drilling Operations Risk Assessment Matrix - Iadc Guidelines

HAZARD CATEGORYHAZARDPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (A-E)RISK INDEX
Well Control-Kick/Influx detection failure
-BOP malfunction
-Gas in riser
-Shallow gas
-Blowout
-Uncontrolled release
-Fire/Explosion
-Loss of life
-Environmental damage
-Platform loss
-BOP System (annular, pipe rams, shear rams)
-Diverter system
-Mud-gas separator
-Trip tank monitoring
-Kick drill
2 (Remote)E (Catastrophic)8 (HIGH)
Pressure Management-Lost circulation
-Formation fracture
-Kick while tripping
-Swab/Surge
-Well kick
-Stuck pipe
-Formation damage
-Well control event
-Mud weight management
-ECD monitoring
-PWD tool
-LCM materials
-Trip schedules
4 (Probable)D (Hazardous)12 (HIGH)
Mechanical Equipment Failure-Drawworks failure
-Top drive malfunction
-Mud pump failure
-Rotary table failure
-Dropped load
-Injury to crew
-Fishing job
-Rig downtime
-Lost in hole
-Preventive maintenance
-Pre-tour inspection
-Equipment certification
-Redundant systems
3 (Occasional)D (Hazardous)9 (HIGH)
H2S / Sour Service-Unexpected H2S influx
-Detection failure
-Inadequate PPE
-Drill string failure
-Fatalities
-Toxic exposure
-Evacuation challenges
-Sulfide stress cracking
-H2S detectors
-SCBA sets
-Wind socks
-H2S resistant materials
-Contingency plans
2 (Remote)E (Catastrophic)8 (HIGH)
Pipe Handling / Tripping Operations-Dropped pipe
-Stabbing board fall
-Iron rough- neck malfunction
-Slips failure
-Tongs kickback
-Crush/ entanglement
-Fracture/ amputation
-Fatality
-Pipe handling procedures
-Safety harnesses
-Remote handling
-Exclusion zones
4 (Probable)C (Major)8 (HIGH)
High Pressure / High Temp (HPHT) Operations-Choke manifold failure
-Wellhead seal failure
-Casing collapse
-Drill string failure
-Uncontrolled release
-Catastrophic failure
-Blowout
-Loss of well
-Pressure testing
-HPHT rated equipment
-Thermal modeling
-Real-time monitoring
3 (Occasional)D (Hazardous)9 (HIGH)

Risk Matrix (Iso 31000 / Iadc HSE Guidelines)

LIKELIHOODSEVERITY Minor (A) Moderate (B) Major (C) Severe (D) Catastrophic (E)
5 - Almost Certain 4 - Likely 3 - Possible 2 - Unlikely 1 - RareMEDIUM MEDIUM LOW LOW LOWHIGH MEDIUM MEDIUM LOW LOWHIGH HIGH MEDIUM MEDIUM LOWEXTREME HIGH HIGH HIGH MEDIUMEXTREME EXTREME HIGH HIGH MEDIUM

Drilling Equipment Integrity And Certification

BOP SYSTEM:

BOP STACK CONFIGURATION: Annular Preventer(s): _______ Size: _______ Pressure Rating: _______ psi Last Tested: _________ Pipe Rams: _______ sets Size: _______ Pressure Rating: _______ psi Last Tested: _________ Blind/Shear Rams: _______ Size: _______ Pressure Rating: _______ psi Last Tested: _________ Casing Rams: _______ Size: _______ Pressure Rating: _______ psi Last Tested: _________
BOP CONTROL SYSTEM:
☐ Hydraulic ☐ Electro-hydraulic ☐ Multiplex (MUX) Last Function Test: _________ Accumulator Volume: ______ gal Operating Pressure: ______ psi Pre-charge Pressure: ______ psi
BOP TESTING COMPLIANCE: Low Pressure Test (200-300 psi): Last: _________ Result: Pass ☐ Fail ☐ High Pressure Test (rated pressure): Last: _________ Result: Pass ☐ Fail ☐ Stump Test (if applicable): Last: _________ Result: Pass ☐ Fail ☐ BOP Certification Current: Yes ☐ No ☐ Expiration Date: _________

DRILLING EQUIPMENT CERTIFICATION:

EQUIPMENT ________ Drawworks Top Drive Mud Pumps Rotary Table Iron Roughneck Elevators Slips Drill Pipe (all) Drill Collars Kelly/BushingCERTIFICATION _____________ API 7K API 8C API 7K API 7K API 7K API 8C API 7K DS-1 DS-1 API 7KLAST INSPECT ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________NEXT DUE ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________STATUS ________ Good ☐ Needs Maint ☐ Out of Service ☐ Good ☐ Needs Maint ☐ Out of Service ☐ Good ☐ Needs Maint ☐ Out of Service ☐ Good ☐ Needs Maint ☐ Out of Service ☐ Good ☐ Needs Maint ☐ Out of Service ☐ Good ☐ Needs Maint ☐ Out of Service ☐ Good ☐ Needs Maint ☐ Out of Service ☐ Good ☐ Needs Insp ☐ Out of Service ☐ Good ☐ Needs Insp ☐ Out of Service ☐ Good ☐ Needs Maint ☐ Out of Service ☐

Well Control Drills And Competency

DRILL TYPE ________ Kick Detection Drill Trip Drill BOP Function Test Choke Drill DivertFREQUENCY _________ Weekly Weekly Weekly MonthlyLAST DRILL __________ __________ __________ __________ __________NEXT DUE ________ ________ ________ ________ ________PARTICIPANTS ____________ ____________ ____________ ____________ ____________PERFORMANCE ________ Satisfactory ☐ Needs Practice ☐ Satisfactory ☐ Needs Practice ☐ Satisfactory ☐ Needs Practice ☐ Satisfactory ☐ Needs Practice ☐