Ventilation Method Statement template

Free Ventilation Method Statement template for mining you can edit online and download as PDF. Covers operation information, primary ventilation system specifications, ventilation network and airflow distribution.

Operation Information

PROCEDURE ID: VM-__________ DATE: ______________ TIME: ______________

MINE SITE: ______________ LOCATION: ______________ VENT ZONE: ______________

VENTILATION OFFICER: ______________ MINE FOREMAN: ______________

Primary Ventilation System Specifications

COMPONENTSPECIFICATIONCAPACITYLOCATIONSTATUSLAST TEST DATENEXT TEST DATE
Main Fan #1Type: Axial/ Centrifugal Dia: ___mAirflow: ___m³/s SP: ___kPaSurface/ Underground☐ Operating
☐ Standby
☐ Maintenance
Main Fan #2Type: Axial/ Centrifugal Dia: ___mAirflow: ___m³/s SP: ___kPaSurface/ Underground☐ Operating
☐ Standby
☐ Maintenance
Booster FansQuantity: ___ Type: ___ Power: ___kWTotal: ___m³/sLocations: ___☐ Operating
☐ Standby
☐ Maintenance
Auxiliary FansQuantity: ___ Type: ___ Power: ___kWTotal: ___m³/sWorking faces: ___☐ Operating
☐ Standby
☐ Maintenance

Ventilation Network And Airflow Distribution

AIRWAYDIMENSIONS (WxH) mLENGTH (m)AIRFLOW (m³/s)VELOCITY (m/s)REGULATOR SETTINGPRESSURE DROP (Pa)
Intake Main Intake Branch Working Face 1 Working Face 2 Return Branch Return Main___ x ___ ___ x ___ ___ x ___ ___ x ___ ___ x ___ ___ x __________ _______ _______ _______ _______ ______________ _______ _______ _______ _______ ______________ _______ _______ _______ _______ _______N/A N/A ___% open ___% open N/A N/A_______ _______ _______ _______ _______ _______

Atmospheric Monitoring And Gas Readings Log

LOCATIONTIMEO2 (%) (>19.5%)CH4 (%) (<1.0%)CO (ppm) (<50 ppm)CO2 (%) (<0.5%)NO2 (ppm) (<5 ppm)
Intake Face 1 Face 2 Return 1 Return 2 Shop Area Refuge Chamber
H2S (ppm) (<10 ppm)SO2 (ppm) (<5 ppm)DUST (mg/m³) (<1.5 mg/m³)TEMP (°C)HUMIDITY (%)AIRFLOW (m/s)MONITORED BY

Ventilation Control Structures Inventory

STRUCTURE TYPELOCATIONTYPESIZEPRESSURE RATING (Pa)AIRFLOW (m³/s)LAST INSPECTION
Regulator Air doors Stopping Overcast Underpass Drop raiseAdjustable/ Fixed Single/Double /Automatic Block/Brattice Concrete/Steel Concrete/Steel Raise/borehole___ x ___ ___ x ___ ___ x ___ ___ x ___ ___ x ___ Dia: ___m_______ _______ _______ _______ _______ ______________ _______ _______ _______ _______ ______________ _______ _______ _______ _______ _______

Weekly Ventilation Survey Certificate

I CERTIFY THAT A COMPLETE VENTILATION SURVEY HAS BEEN CONDUCTED AND ALL READINGS ARE WITHIN MSHA REQUIREMENTS.

SURVEY DATE: ______________ SURVEY TIME: ______________

WEATHER CONDITIONS: ______________ BAROMETRIC PRESSURE: __________ kPa

TOTAL INTAKE AIRFLOW: __________ m³/s TOTAL RETURN AIRFLOW: __________ m³/s SHORTFALL: __________ m³/s

MINIMUM FACE VELOCITY: __________ m/s MAXIMUM FACE VELOCITY: __________ m/s

DEFICIENCIES FOUND: ______________

CORRECTIVE ACTIONS: ______________

VENTILATION OFFICER: ______________ SIGNATURE: ______________

MINE FOREMAN: ______________ SIGNATURE: ______________