Dewatering Method Statement template

Free Dewatering Method Statement template for mining you can edit online and download as PDF. Covers operation information, hydrogeological assessment and water inflow data, pumping system inventory and specifications.

Operation Information

PROCEDURE ID: DM-__________ DATE: ______________ TIME: ______________

MINE SITE: ______________ LOCATION: ______________ PUMP STATION: ______________

MINE MANAGER: ______________ PUMP OPERATOR: ______________

Hydrogeological Assessment And Water Inflow Data

PARAMETERMEASUREMENTLOCATIONDATEFREQUENCYTRENDACTION LEVEL
Groundwater LevelStatic: ___mPiezo #1DailyRising/ Falling/Stable___m
Inflow Rate___L/sFace 1ShiftlyIncreasing/ Decreasing___L/s
Total Inflow___L/sMine wideDailyTrend analysis___L/s
Rainfall___mm/24hSurface stationDailySeasonal pattern___mm
Water QualitypH: ___ TDS: ___ppm Turbidity: ___Sump #1WeeklyCorrosive/ NeutralpH: 5.5-8.5 TDS: <2000

Pumping System Inventory And Specifications

PUMP IDTYPECAPACITY (L/s)HEAD (m)POWER (kW)LOCATIONSTATUS
Main Pump 1Centrifugal/ Submersible_____________________Sump #1☐ Operating
☐ Standby
Main Pump 2Centrifugal/ Submersible_____________________Sump #1☐ Operating
☐ Standby
Booster Pump 1Centrifugal_____________________Level 850☐ Operating
☐ Standby
Face Pump 1Submersible_____________________Face 1☐ Operating
☐ Standby
Face Pump 2Submersible_____________________Face 2☐ Operating
☐ Standby
Emergency PumpDiesel/ Electric_____________________Portal☐ Operating
☐ Standby

Sump And Drainage System Status

SUMP IDCAPACITY (m³)CURRENT VOLUME (m³)% FULLINFLOW RATE (L/s)OUTFLOW RATE (L/s)CLEANOUT SCHEDULE
Main Sump Level 850 Level 900 Face Sump 1_______ _______ _______ ______________ _______ _______ ______________% _______% _______% _______%_______ _______ _______ ______________ _______ _______ ______________ _______ _______ _______
DRAIN TYPELENGTH (m)GRADE (%)CONDITIONFLOW RATE (L/s)LAST INSPECTEDNEXT INSPECTED
Main Drain East Drain West Drain_______ _______ ______________ _______ _______Good/Fair/Poor Good/Fair/Poor Good/Fair/Poor_______ _______ ______________ _______ ______________ _______ _______

Pump Operations Log And Maintenance Record

DATE/TIMEPUMP IDHOURS RUNFLOW RATE (L/s)DISCHARGE PRESSURE (kPa)AMP DRAWOPERATOR
MAINTENANCE ITEMTASKDATEPERFORMED BYNEXT DUEPARTS USEDSTATUS
Pump #1 Pump #1 Pump #2 Valve #3Seal check Bearing lube Impeller inspection Exercise

Water Management Plan Compliance Certificate

I CERTIFY THAT THE DEWATERING SYSTEM IS OPERATING AS DESIGNED AND ALL DISCHARGES COMPLY WITH PERMIT REQUIREMENTS.

DATE: ______________ TIME: ______________

TOTAL WATER PUMPED TODAY: __________ m³ TOTAL WATER PUMPED THIS MONTH: __________ m³

DISCHARGE LOCATION: ______________ RECEIVING WATER BODY: ______________

WATER QUALITY PARAMETERS AT DISCHARGE:

pH: __________ TSS: __________ mg/L OIL & GREASE: __________ mg/L

PERMIT NUMBER: ______________ EXPIRY DATE: ______________

MINE MANAGER: ______________ SIGNATURE: ______________

ENVIRONMENTAL OFFICER: ______________ SIGNATURE: ______________