Exploration Method Statement template

Free Exploration Method Statement template for mining you can edit online and download as PDF. Covers operation information, exploration program design and target parameters, drilling equipment and specifications.

Operation Information

PROCEDURE ID: EM-__________ DATE: ______________ TIME: ______________

PROJECT: ______________ LOCATION: ______________ TENEMENT #: ______________

EXPLORATION MANAGER: ______________ SENIOR GEOLOGIST: ______________

Exploration Program Design And Target Parameters

TARGET TYPEDEPTH RANGE (m)METHODSPACING (m)ORIENTATIONSAMPLE TYPERECOVERY TARGET (%)
RC Drilling Diamond Drilling RAB Drilling Air Core Auger Drilling0-300 200-800 0-50 0-100 0-20Reverse Circulation NQ/HQ/PQ Core Rotary Air Blast Air Core Hand/ Mechanical50 x 100 100 x 200 25 x 50 40 x 80 20 x 40Vertical/
-45° dip
-60° dip azimuth 090° Vertical Vertical Vertical
1m splits Core Composite 3m samples 1m samples Bulk>90% >95% >85% >90% >95%

Drilling Equipment And Specifications

RIG IDTYPECAPABILITY (m)POWERSTATUSLOCATIONLAST SERVICE
Rig #1 Rig #2 Rig #3 Support Vehicle 1 Support Vehicle 2RC/DD combo Diamond Core RAB Water truck Fuel truck500m RC 800m DD 1200m NQ 100m 20,000L 10,000LDiesel 400kW Diesel 300kW Diesel 150kW Diesel Diesel☐ Operating
☐ Standby
☐ Maintenance
☐ Operating
☐ Standby
☐ Maintenance
☐ Operating
☐ Standby
☐ Maintenance
☐ Operating
☐ Standby
☐ Operating
☐ Standby
Grid ref: Grid ref: Grid ref: Grid ref: Grid ref:_______ _______ _______ _______ _______

Drilling Progress And Sample Log

HOLE IDEASTINGNORTHINGRL (m)DEPTH (m)AZIMUTHDIP (°)
FROM (m)TO (m)SAMPLE IDRECOVERY (%)RQD (%)GEOLOGYASSAY RESULTS
QA/QC SamplesBlanks: ___ insertedStandards: ___ insertedDuplicates: __ collectedPulps: ___ storedRejects: ___ storedStatus: ___

Drilling Safety And Environmental Compliance Checklist

CHECKPOINTREQUIREMENTVERIFICATION METHODCOMPLIANCE (YES/NO/NA)INSPECTORDATEACTION IF NO
Drill Site Preparation Spill Kits Bunding First Aid Fire Extinguishers PPE Compliance Dust Control Noise Levels Ground DisturbanceClearing/ Level pad Located at rig and vehicles 110% capacity for fuel Fully stocked 2 x 9kg ABE at each rig All personnel wearing full PPE Water spray operating <85 dB(A) at operator position Drill area confined to approved areaVisual inspection Inventory check Visual check Check date Pressure gauge check Spot check Visual Sound level meter check Daily inspectionHalt drilling until fixed Replace/restock Repair bund Restock kit Service/ replace Remove from site Increase watering Hearing protection + engineering Cease drilling if exceedance

Exploration Summary And Resource Update

PROGRAM PERIOD: FROM: __________ TO: __________

TOTAL METERS DRILLED: __________ m TOTAL HOLES COMPLETED: __________

AVERAGE DEPTH: __________ m MAX DEPTH: __________ m MIN DEPTH: __________ m

RESOURCE UPDATE:

MEASURED RESOURCE: __________ Mt @ __________% grade

INDICATED RESOURCE: __________ Mt @ __________% grade

INFERRED RESOURCE: __________ Mt @ __________% grade

GEOLOGICAL INTERPRETATION: ______________

______________

RECOMMENDATIONS FOR NEXT PHASE: ______________

______________

SENIOR GEOLOGIST: ______________ DATE: ______________

EXPLORATION MANAGER: ______________ DATE: ______________