Processing Method Statement template

Free Processing Method Statement template for mining you can edit online and download as PDF. Covers operation information, process flowsheet and design parameters, process control and metallurgical performance.

Operation Information

PROCEDURE ID: PM-__________ DATE: ______________ TIME: ______________

PROCESSING PLANT: ______________ LOCATION: ______________ MILL #: ______________

MILL MANAGER: ______________ METALLURGIST: ______________

Process Flowsheet And Design Parameters

PROCESS UNITDESIGN CAPACITY (tph)POWER (kW)MATERIAL TYPEFEED SIZE (mm)PRODUCT SIZE (mm)RETENTION TIME (min)
Primary Crusher Secondary Crusher Tertiary Crusher SAG Mill Ball Mill Cyclone Cluster Flotation Cells Thickener Filter Press1,500 800 450 450 450 450 450 450 (dry) 80 (dry)400 315 250 4,500 4,000 N/A 185 15 110Steel/Mn Steel/Mn Ceramic Steel/Rubber Steel/Rubber Rubber Rubber/SS Steel Polypropylene-800
-150
-40
-12
-2 Slurry 40% solids
-0.075 35% solids Feed 15% solids 55% solids
-150
-40
-12
-2
-0.075 O/F: -0.075 U/F: -2 Concentrate 30% solids U/F 55% solids Cake 85% solids
N/A N/A N/A 15-20 25-30 Instant 20-25 240-360 Cycle 15

Process Control And Metallurgical Performance

PARAMETERTARGETACTUALVARIANCE (±)CONTROL ACTIONLAST ADJUSTEDOPERATOR
Feed Rate (tph) Feed Grade (g/t Au) Grind Size (P80) Pulp Density (Flotation) pH (Flotation) Collector Dosage Frother Dosage Concentrate Grade Tails Grade Recovery450 tph
2.5 g/t 80% -75μm 35% solids
8.5 80 g/t 20 g/t 15% <0.15 g/t 92%
_______ _______ _______% _______% _______ _______ _______ _______% _______ _______%_______ _______ _______ _______ _______ _______ _______ _______ _______ _______Stockpile blend Cyclone pressure Water add Lime dosage Pump setting Pump setting Reagent optimization Circuit review N/A

Reagent Consumption And Inventory

REAGENTAPPLICATIONDOSAGE (g/t)OPENING STOCK (kg)CURRENT STOCK (kg)REORDER LEVEL (kg)STATUS
Lime (CaO) Sodium Cyanide Activated Carbon Copper Sulphate Xanthate MIBC FlocculantpH modifier Depressant Gold leaching Gold recovery Collector Collector Frother Thickener1,200 250 350 50 80 60 20 1550,000 10,000 20,000 5,000 4,000 3,000 1,000 2,000_______ _______ _______ _______ _______ _______ _______ _______15,000 3,000 5,000 1,500 1,200 900 300 600☐ Adequate
☐ Reorder
☐ Adequate
☐ Adequate
☐ Reorder
☐ Adequate
☐ Reorder
☐ Adequate
☐ Reorder
☐ Adequate
☐ Reorder
☐ Adequate
☐ Reorder
☐ Adequate
☐ Reorder

Maintenance And Inspection Schedule

EQUIPMENTINSPECTION TYPELAST INSPECTIONNEXT INSPECTIONCONDITION RATING (1-5)REPAIR REQUIREDREPAIR COMPLETED
Jaw Crusher Cone Crusher SAG Mill Ball Mill Cyclone Cluster Flotation Cells Pumps (all)Wear plates Bearings Mantle/bowl Oil system Liners Bearings Drive motor Liners Bearings Apex/insert Feed pressure Impeller Air valves Seals Bearings_______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ ______________ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ _______1-2-3-4-5 1-2-3-4-5 1-2-3-4-5 1-2-3-4-5 1-2-3-4-5 1-2-3-4-5 1-2-3-4-5 1-2-3-4-5 1-2-3-4-5 1-2-3-4-5 1-2-3-4-5 1-2-3-4-5 1-2-3-4-5 1-2-3-4-5 1-2-3-4-5☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No

Quality Control And Metallurgical Accounting

SAMPLE POINTFREQUENCYASSAY Au (g/t)ASSAY Ag (g/t)% SOLIDSFLOW RATE (m³/h)CALCULATED VALUE
Mill Feed Cyclone O/F Cyclone U/F Flotation Feed Concentrate Tails Final TailsHourly 2-hourly 2-hourly 2-hourly Hourly Hourly 4-hourly_______ _______ _______ _______ _______ _______ ______________ _______ _______ _______ _______ _______ _______95% (ore) _______ _______ 30-35% 25-30% 30-35% 30-35%450 tph 850 150 900 60 840 84040,909 g Au/h _______ _______ _______ _______ _______ Loss calc
METALLURGICAL BALANCE (24h PERIOD)CALCULATEDCHECKED
HEAD GRADE: ______________ g/t CONCENTRATE GRADE: ______________ g/t TAILS GRADE: ______________ g/t CALCULATED HEAD: ______________ g/t RECOVERY: ______________ % MASS PULL: ______________ %________ ________ ________ ________ ________ ________________ ________ ________ ________ ________ ________

Processing Plant Shift Report And Certificate

SHIFT: ☐ Day (06:00-18:00) ☐ Night (18:00-06:00) DATE: ______________

SHIFT SUPERVISOR: ______________ METALLURGIST: ______________

SHIFT SUMMARY:

ORE PROCESSED: __________ t FEED GRADE: __________ g/t CONCENTRATE PRODUCED: __________ t

CONCENTRATE GRADE: __________ g/t RECOVERY: __________% PLANT AVAILABILITY: __________%

DOWNTIME RECORD:

EQUIPMENTDURATION (min)REASONACTION TAKENLOST PRODUCTION

SAFETY OBSERVATIONS: ______________

______________

ENVIRONMENTAL COMPLIANCE:

☐ Tailings discharge within limits ☐ Water treatment operating ☐ Dust controls effective

☐ Spill kits checked ☐ Emissions within limits ☐ Noise monitoring complete

SHIFT SUPERVISOR SIGNATURE: ______________ DATE: ______________

METALLURGIST SIGNATURE: ______________ DATE: ______________

MILL MANAGER REVIEW: ______________ DATE: ______________