Free Extraction Method Statement template for mining you can edit online and download as PDF. Covers operation information, mining method and production parameters, production drilling and blasting specifications.
PROCEDURE ID: XM-__________ DATE: ______________ TIME: ______________
MINE SITE: ______________ LOCATION: ______________ SECTION: ______________
MINE MANAGER: ______________ PRODUCTION SUP'T: ______________
| METHOD | APPLICATION | PRODUCTION RATE (t/shift) | SELECTIVITY | DILUTION TARGET (%) | RECOVERY TARGET (%) | COST ($/t) |
|---|---|---|---|---|---|---|
| Open Pit Underground (Longhole) Cut & Fill Room & Pillar Sublevel Caving | Bulk low-grade near surface Selective moderate grade High grade narrow veins Flat-lying tabular bodies Steep massive low-moderate | 10,000-50,000 1,000-5,000 500-1,500 3,000-8,000 5,000-15,000 | Low High Very high Medium Medium | <5% <10% <5% <8% <15% | >95% >90% >95% 70-80% (extraction) >85% | 2.50-5.00 15.00-30.00 40.00-60.00 10.00-20.00 12.00-25.00 |
| PRODUCTION ZONE | HOLE DIAMETER (mm) | BURDEN/ SPACING (m) | EXPLOSIVE TYPE | POWDER FACTOR (kg/t) | FRAGMENTATION TARGET (mm) | MUCK PILE SHAPE |
|---|---|---|---|---|---|---|
| Bench 1 Bench 2 Stope A Stope B | 89-115 115-140 64-76 76-89 | 3.0 x 3.5 4.0 x 4.5 1.5 x 2.0 (ring burden) 2.0 x 2.5 (ring burden) | ANFO/ Emulsion Heavy ANFO Emulsion ANFO/ Emulsion | 0.35-0.45 0.30-0.40 0.45-0.55 0.40-0.50 | 300-500 400-600 200-400 300-500 | Loose pile 4-5m high Loose pile 5-6m high Ring burden blasted Ring burden blasted |
| EQUIPMENT ID | TYPE | BUCKET/ CAPACITY (t) | UTILIZATION TARGET (%) | AVAILABILITY (%) | OPERATOR | PRODUCTION (t/shift) |
|---|---|---|---|---|---|---|
| Excavator 1 Excavator 2 Loader 1 Loader 2 Truck 1-5 Truck 6-10 Dozer 1 Grader 1 | Hydraulic Face Shovel Hydraulic Backhoe Wheel Loader LHD 6yd³ Articulated Dump Truck Rigid Dump Truck Track Dozer Motor Grader | 15.0 22.0 10.0 12.0 40.0 60.0 Support Support | 85 85 80 85 85 85 70 60 | 92 90 88 89 87 86 85 84 | _______ _______ _______ _______ Various Various _______ _______ | 4,500 6,500 3,200 3,800 2,800/truck 4,200/truck Support Support |
| DATE | SHIFT | TARGET PRODUCTION (t) | ACTUAL PRODUCTION (t) | VARIANCE (± t) | CUMULATIVE PRODUCTION (t) | GRADE (%/grade) |
|---|---|---|---|---|---|---|
| Day Night Day Night Day Night | ||||||
| WEEKLY TOTAL: PRODUCTION: | _______ t | MONTHLY TARGET: | _______ t | YTD TOTAL: | _______ t | STATUS: ☐ On target ☐ Behind ☐ Ahead |
| STOPE/BENCH | PLANNED GRADE | ACTUAL GRADE | DILUTION (%) | LOSS (%) | ORE TONNES | WASTE TONNES |
|---|---|---|---|---|---|---|
| Bench 1 Bench 2 Stope A Stope B | _______% _______% _______% _______% | _______% _______% _______% _______% | _______ _______ _______ _______ | _______ _______ _______ _______ | _______ _______ _______ _______ | _______ _______ _______ _______ |
GRADE CONTROL MEASURES:
☐ Blast hole sampling ☐ Face mapping ☐ Grade control drilling ☐ Ore/waste marking
☐ RTK GPS guidance ☐ Survey pickups ☐ Stockpile management ☐ Blending program
I CERTIFY THAT THE PRODUCTION REPORTED ABOVE IS ACCURATE AND COMPLIES WITH ALL SAFETY AND ENVIRONMENTAL
REQUIREMENTS.
REPORT PERIOD: FROM: __________ TO: __________
TOTAL ORE MINED: __________ t TOTAL WASTE MINED: __________ t STRIP RATIO: __________ :1
AVERAGE GRADE: __________ CONCENTRATE PRODUCED: __________ t METAL PRODUCED: __________ t
SIGNIFICANT INCIDENTS: ______________
______________
PRODUCTION SUPERINTENDENT: ______________ SIGNATURE: ______________
MINE MANAGER: ______________ SIGNATURE: ______________
DATE: ______________