Ground Support Method Statement template

Free Ground Support Method Statement template for mining you can edit online and download as PDF. Covers operation information, ground condition assessment and classification, support installation specifications and monitoring.

Operation Information

PROCEDURE ID: GS-__________ DATE: ______________ TIME: ______________

MINE SITE: ______________ LOCATION: ______________ SECTION: ______________

GROUND CONTROL SUPERVISOR: _________ ROCK MECHANIC: ______________

Ground Condition Assessment And Classification

PARAMETERMEASUREMENTRMR RATINGQ-RATINGSUPPORT CATEGORYSUPPORT TYPESUPPORT INTERVAL
Rock Quality Designation (RQD)UCS: ___ MPa___/100___/100Category A (RMR 81-100)Rock bolts only0.5-1.0m
Joint CharacteristicsSpacing: ___mm Condition: ___/30___/100___/100Category B (RMR 61-80)Rock bolts + mesh1.0-1.5m
Groundwater ConditionsInflow: ___L/min Pressure: ___MPa___/15___/100Category C (RMR 41-60)Rock bolts + mesh + shotcrete1.0-1.5m
Joint OrientationDip: ___° Direction: ___°___/20___/100Category D (RMR 21-40)Steel sets + lagging0.5-1.0m
Stress ConditionsMagnitude: ___MPa Orientation: ___°___/0-25___/100Category E (RMR <20)Forepoling + full steel sets<0.5m

Support Installation Specifications And Monitoring

SUPPORT TYPESPECIFICATIONSINSTALLATION PATTERNTORQUE/TENSION REQUIREMENTTEST FREQUENCYMONITORING METHODVERIFICATION STATUS
Mechanical Rock BoltsDia: ___mm Length: ___m Grade: ___Spacing: ___m Row: ___m Pattern: staggeredTension: ___kN Torque: ___NmPull test: every ___m Min 5% of boltsLoad cells: every ___m Convergence points: every ___m☐ Installed
☐ Tested
☐ Verified
Resin Grouted BoltsDia: ___mm Length: ___m Resin type: ___ cartridgesSpacing: ___m Row: ___m Pattern: squareBond length: ___mm Cure time: ___minPull test: every ___m Min 10% of boltsExtensometers: every ___m Shear strips: every ___m☐ Installed
☐ Tested
☐ Verified
Cable BoltsStrands: ___ Length: ___m Capacity: ___kNSpacing: ___m Row: ___m Pattern: systematicGrout pressure ___MPa W/C ratio: ___Pull test: every ___m Min 5% of boltsTell-tales: every ___m Load cells: every ___m☐ Installed
☐ Tested
☐ Verified
ShotcreteThickness: ___mm Mix design: ___MPa Fiber type: ___kg/m³Coverage: full faceApplication: wet/dry Rebound <___%Core samples: every ___m² Compressive strength test every ___m²Adhesion tests: every ___m² Thickness probes: every ___m☐ Applied
☐ Tested
☐ Verified
Steel SetsSection: ___ Weight: ___kg/m Capacity: ___kNSpacing: ___m Footing: ___MPa bearingBlocking: full contact Lagging: ___mm thickLoad tests: every ___sets Instrumentation on ___setsConvergence monitoring: daily readings☐ Installed
☐ Tested
☐ Verified

Ground Movement Monitoring And Instrumentation Log

DATE/TIMESTATIONCONVERGENCE READING (mm)EXTENSOMETER READING (mm)LOAD CELL READING (kN)COMMENTS
ALARM THRESHOLDS:Warning Level: ___mmAction Level: ___mmCritical Level: ___mmRate of Change: ___mm/day

Ground Support Installation Certificate

I CERTIFY THAT THE GROUND SUPPORT INSTALLED IN THIS SECTION COMPLIES WITH THE APPROVED DESIGN SPECIFICATIONS

AND MEETS ALL MSHA SAFETY REQUIREMENTS.

SECTION/FACE: ______________ DATE: ______________

CHAINAGE FROM: __________ TO: __________ SUPPORT CATEGORY: __________

INSTALLATION SUPERVISOR: ______________ SIGNATURE: ______________

QUALITY CONTROL INSPECTOR: ______________ SIGNATURE: ______________

MINE MANAGER: ______________ SIGNATURE: ______________