Free Job Safety Analysis - Conveyor Maintenance template for mining you can edit online and download as PDF. Covers job information, job sequence and hazard analysis, tools & equipment checklist.
JSA ID: CMJ-__________ DATE: ______________ TIME: ______________
CONVEYOR ID: ______________ LOCATION: ______________ LENGTH: ______________ m
JOB TYPE: ☐ Belt Repair ☐ Roller Replacement ☐ Structure Repair ☐ Cleaning ☐ Splice
LOCKOUT/TAGOUT VERIFICATION REQUIRED - CONVEYOR ENERGY ISOLATION CHECKLIST
| ☐ Conveyor motor LOCKED OUT - Lock #: __________ Tag #: __________ Verified by: ________ ☐ Pull cord engaged and LOCKED - Location: ______________ Verified by: ________ ☐ Belt slip switch disabled - Verified by: ________ Time: ________ ☐ All start buttons tagged - Verified by: ________ Location: ________ ☐ Test run performed after LOTO - Result: ☐ No movement ☐ Movement - STOP WORK! |
|---|
ADDITIONAL PRECAUTIONS
| ☐ Belt stored tension released - Method: ______________ Verified by: ________ ☐ Anti-rollback devices engaged - Verified by: ________ ☐ Area barricaded - Signs posted - Verified by: ________ ☐ Communication established - Method: ☐ Radio ☐ Hand signals ☐ Verbal |
|---|
| JOB STEP SEQUENCE | POTENTIAL HAZARDS | HAZARD CATEGORY | RISK LEVEL (H/M/L) | CONTROL MEASURES | RESPONSIBLE PERSON | SIGN-OFF |
|---|---|---|---|---|---|---|
| 1. LOTO Application | -Unexpected startup -Stored energy -Multiple power sources -Incomplete isolation | Electrical/ Mechanical Mechanical Electrical All | H H H H | -Follow strict LOTO procedures -Test after lockout -Identify all sources -Use group LOTO for multiple workers | Maintenance Supervisor Electrician | |
| 2. Access & Scaffolding Setup | -Working at height -Unstable platforms -Slips on walkways -Conveyor structure handholds | Fall Fall Fall Caught In | H H M H | -Use fall protection (harness) -Inspect scaffolding before use -Use non-slip footwear -Maintain 3-point contact on ladders | Maintenance Crew | |
| 3. Belt Inspection & Repair | -Sharp edges -Pinch points -Belt movement (if tension released) -Heavy belt lifting | Cut/Laceration Caught In Crush Ergonomics | M H H M | -Heavy leather gloves -Use tools for clearing -Keep hands clear of rollers -Team lifting for heavy sections | Maintenance Crew | |
| 4. Roller Replacement | -Heavy lifting -Pinch points -Falling rollers -Tools dropped from height | Ergonomics Caught In Struck By Struck By | M H M M | -Use roller lifting tool -Secure rollers with strap -Use tool lanyards at height | Maintenance Crew | |
| 5. Belt Splicing | -High tension -Sharp tools -Chemical adhesives -Fumes | Stored Energy Cut/Laceration Health Respiratory | H M M M | -Follow manufacturer tension procedures -Use cut- resistant gloves -Ventilation for adhesives | Belt Splicer | |
| 6. Clean-up & LOTO Removal | -Slippery surfaces -Debris -Missing tools -Incomplete LOTO removal | Fall Trip Equipment Electrical | M L L H | -Clean spills immediately -Remove all tools & materials -Verify all personnel clear before LOTO removal | All Crew | |
| 7. Test Run & Handover | -Unexpected movement -Debris ejection -Belt tracking issues | Caught In Struck By Mechanical | H M M | -Clear all personnel from area -Warning horn before start -Visual inspection during test run from safe location | Supervisor |
☐ Lockout kit complete ☐ Voltage tester ☐ Belt cutters ☐ Roller puller ☐ Lifting straps
☐ Fall arrest harness ☐ Lanyards ☐ Anchor points ☐ Fire extinguisher ☐ First aid kit
☐ Communication radios ☐ Lighting (if req) ☐ Ventilation fan ☐ Gas detector ☐ Tools secured
| NAME | ROLE | TRAINING CURRENT | BRIEFED BY | DATE | TIME | SIGNATURE |
|---|---|---|---|---|---|---|
| Supervisor Electrician Mechanic Splicer Helper | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No |