Free Blasting Procedure Method Statement template for mining you can edit online and download as PDF. Covers operation information, pre-blast safety checklist and procedures, blasting sequence and execution log.
PROCEDURE ID: BP-__________ DATE: ______________ TIME: ______________
MINE SITE: ______________ LOCATION: ______________ BLAST ZONE: ______________
BLASTING SUPERVISOR: ______________ SHIFT BOSS: ______________ BLASTER: ______________
| CHECKPOINT | REQUIREMENT | VERIFICATION METHOD | COMPLIANCE (YES/NO/NA) | INSPECTOR | TIME CHECKED | SIGN-OFF |
|---|---|---|---|---|---|---|
| Drill Pattern Verification | -Hole diameter 2.5-4.5" -Depth tolerance ±6" -Spacing/burden as per plan | -Visual inspection -Measured depth check -Template verification | ||||
| Explosives Inventory | -Type per plan -Quantity documented -Storage temperature <90°F | -Inventory count -Batch number verification -Temp log | ||||
| Initiation System Check | -Detonators matched to explosives -Lead wire insulation intact -Blasting machine functionality | -Continuity test -Visual inspection -Resistance check | ||||
| Gas & Dust Monitoring | -Methane % <1 -Respirable dust <1.5mg/m³ -Airflow adequate | -Gas detector calibration verified -Airflow measurement | ||||
| Evacuation Verification | -Zone cleared -Guards posted at all access points -All personnel accounted | -Zone sweep -Radio check -Guard list verified -Personnel count |
| TIME | ACTIVITY | BLASTER ACTION | VERIFICATION |
|---|---|---|---|
| T-30 minutes T-15 minutes T-5 minutes T-2 minutes T-0 T+5 minutes T+15 minutes | Final warning Secondary sweep Arm blast area Final countdown Initiate blast Post-blast check Re-entry verification | Announce over PA Verify all clear Connect lead lines Clear blast area Fire blast Wait for fumes to clear Inspect blast area | Radio check complete Zone verification complete Visual inspection done All personnel behind line Vibration monitoring active Gas readings normal Damage assessment begun |
| INSPECTION ITEM | RESULT | DEVIATION FROM PLAN | CORRECTIVE ACTION | INSPECTOR | TIME |
|---|---|---|---|---|---|
| Muck pile fragmentation Fly rock assessment Face condition Overbreak/ underbreak Vibration levels Air overpressure Fume clearance |
BLAST NUMBER: __________ PATTERN: __________ HOLES DRILLED: __________ HOLES LOADED: __________
EXPLOSIVE TYPE: __________ TOTAL KG: __________ DETONATOR TYPE: __________
EXPECTED ROCK MOVEMENT: __________ ACTUAL MOVEMENT: __________ EFFICIENCY: __________%
SIGNATURES:
BLASTER: ______________ DATE: ______________
SHIFT BOSS: ______________ DATE: ______________
MINE MANAGER: ______________ DATE: ______________