Free Tailings Management Plan template for mining you can edit online and download as PDF. Covers hazards and controls, monitoring programme, governance.
REF: TMP-______ REVISION: 01 DATE: ____/____/________
| DOCUMENT DETAILS | |
|---|---|
| MINE / TAILINGS STORAGE FACILITY (TSF): ________ | RESPONSIBLE ENGINEER: ______________ |
| FACILITY TYPE (dam / dry stack / paste): ________ | CONSEQUENCE CLASSIFICATION: ________ |
| ISSUE DATE: ______________ | REVIEW DATE: ______________ |
| Hazard | Control measure |
|---|---|
| Embankment or dam failure | Design by qualified engineer, independent review, freeboard and stability monitoring |
| Overtopping / flood | Spillway capacity, water balance, storm monitoring |
| Seepage and contamination of groundwater | Liner, drains, monitoring bores, water treatment |
| Dust from dry tailings surfaces | Dust suppression, revegetation, wind monitoring |
| Drowning, entrapment in tailings | Access control, signage, rescue equipment, no solitary work |
| Pipeline leaks and spills | Pipe inspection, leak detection, secondary containment |
| Parameter | Method | Frequency | Trigger level | Action |
|---|---|---|---|---|
| Pond water level and freeboard | Survey / gauge | Daily | ||
| Piezometer (pore pressure) readings | Instruments | Weekly | ||
| Embankment settlement and cracking | Visual and survey | Weekly | ||
| Seepage and groundwater quality | Sampling | Monthly |
☐ Responsible engineer and accountable executive appointed
☐ Operations, maintenance and surveillance manual in place
☐ Independent annual inspection and periodic safety review
☐ Emergency preparedness and response plan for dam break, tested with local community and
authorities
☐ Closure plan and financial provision documented
| Role | Name | Signature | Date |
|---|---|---|---|
| Prepared by | |||
| Reviewed by | |||
| Approved by |
This is a controlled document. Verify it is the current revision before use. Adapt it to local
legislation and site procedures.