JSA ID: VIJ-__________ DATE: ______________ TIME: ______________
LOCATION: ______________ VENT TYPE: ☐ Ducting ☐ Fans ☐ Brattice ☐ Stopping
FAN ID: ______________ DUCT SIZE: __________ mm LENGTH: __________ m
| JOB STEP SEQUENCE | POTENTIAL HAZARDS | HAZARD CATEGORY | RISK LEVEL (H/M/L) | CONTROL MEASURES | RESPONSIBLE PERSON | SIGN-OFF |
|---|---|---|---|---|---|---|
| 1. Site Preparation | -Ground conditions -Overhead hazards -Traffic (mobile equip) -Existing ventilation | Fall Struck By Mobile Eq Respiratory | M H H M | -Inspect area for hazards -Check for loose rock -Barricade work area -Ventilation in area OK | Supervisor Vent Crew | |
| 2. Material Handling (Ducting/ Fans) | -Manual lifting -Pinch points -Dropping materials -Struck by delivery vehicle | Ergonomics Caught In Struck By Mobile Eq | M M M H | -Team lifting for heavy items -Use lifting equipment (forklift, crane) -Secure load before moving | All Crew | |
| 3. Fan Placement & Mounting | -Lifting operations -Rigging failure -Falling fan -Electrical connection hazards | Crush Struck By Crush Electrical | H H H H | -Certified rigging -Lift plan for heavy fans -Inspect slings/hooks -LOTO during electrical connections | Millwright Supervisor | |
| 4. Ducting Installation (Overhead) | -Working at height -Unstable platforms -Sharp edges on ducting -Heavy sections -Pinch points during joining | Fall Fall Cut/Laceration Ergonomics Caught In | H H M M M | -Use fall protection when over 2m -Scaffold or manlift inspected -Cut-resistant gloves -Duct lift equipment | Vent Crew | |
| 5. Duct Suspension & Tension | -Suspension system failure -Over-tension -Under-tension (sagging) -Falling tensioning tools | Fall Mechanical Performance Struck By | H M M M | -Check anchor points -Follow manufacturer tension specs -Stand clear during tensioning | Vent Crew | |
| 6. Brattice/ Stopping Installation | -Sharp tools -Staple gun injuries -Material handling -Sealant chemicals -Air pressure difference | Cut/Laceration Struck By Ergonomics Chemical Physical | M M M L M | -Staple gun safety features -Eye protection -Gloves for sealants -Work from intake side | Vent Crew | |
| 7. Electrical Connection & Testing | -Lockout/ Tagout -Arc flash -Energized testing -Fan start-up unexpected | Electrical Electrical Electrical Mechanical | H H H M | -LOTO before work -Arc flash PPE -Qualified electrician -Test run with area clear | Electrician | |
| 8. Performance Testing | -Air pressure changes -Gas accumulation -Dust levels -Temperature changes | Physical Respiratory Health Heat Stress | M H M M | -Monitor throughout installation -Test airflow at face -Gas readings before/after | Vent Officer |
FAN INSTALLATION:
☐ Fan base level/secure ☐ Isolation switches ☐ Guards in place ☐ Direction correct
☐ Vibration mounts ☐ Silencers fitted ☐ Drainage ☐ Fire suppression
DUCTING INSTALLATION:
☐ Correct size/type ☐ All joints sealed ☐ Suspension secure ☐ No sharp bends
☐ Grounding (if required) ☐ Clear of traffic ☐ Marked/identified ☐ End distance from face correct
| NAME | ROLE | TRAINING CURRENT | BRIEFED BY | DATE | TIME | SIGNATURE |
|---|---|---|---|---|---|---|
| Supervisor Electrician Millwright Vent Crew Vent Crew | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No |