Job Safety Analysis - Ventilation Installation template

Free Job Safety Analysis - Ventilation Installation template for mining you can edit online and download as PDF. Covers job information, job sequence and hazard analysis, ventilation installation checklist.

Job Information

JSA ID: VIJ-__________ DATE: ______________ TIME: ______________

LOCATION: ______________ VENT TYPE: ☐ Ducting ☐ Fans ☐ Brattice ☐ Stopping

FAN ID: ______________ DUCT SIZE: __________ mm LENGTH: __________ m

Job Sequence And Hazard Analysis

JOB STEP SEQUENCEPOTENTIAL HAZARDSHAZARD CATEGORYRISK LEVEL (H/M/L)CONTROL MEASURESRESPONSIBLE PERSONSIGN-OFF
1. Site Preparation-Ground conditions
-Overhead hazards
-Traffic (mobile equip)
-Existing ventilation
Fall Struck By Mobile Eq RespiratoryM H H M-Inspect area for hazards
-Check for loose rock
-Barricade work area
-Ventilation in area OK
Supervisor Vent Crew
2. Material Handling (Ducting/ Fans)-Manual lifting
-Pinch points
-Dropping materials
-Struck by delivery vehicle
Ergonomics Caught In Struck By Mobile EqM M M H-Team lifting for heavy items
-Use lifting equipment (forklift, crane)
-Secure load before moving
All Crew
3. Fan Placement & Mounting-Lifting operations
-Rigging failure
-Falling fan
-Electrical connection hazards
Crush Struck By Crush ElectricalH H H H-Certified rigging
-Lift plan for heavy fans
-Inspect slings/hooks
-LOTO during electrical connections
Millwright Supervisor
4. Ducting Installation (Overhead)-Working at height
-Unstable platforms
-Sharp edges on ducting
-Heavy sections
-Pinch points during joining
Fall Fall Cut/Laceration Ergonomics Caught InH H M M M-Use fall protection when over 2m
-Scaffold or manlift inspected
-Cut-resistant gloves
-Duct lift equipment
Vent Crew
5. Duct Suspension & Tension-Suspension system failure
-Over-tension
-Under-tension (sagging)
-Falling tensioning tools
Fall Mechanical Performance Struck ByH M M M-Check anchor points
-Follow manufacturer tension specs
-Stand clear during tensioning
Vent Crew
6. Brattice/ Stopping Installation-Sharp tools
-Staple gun injuries
-Material handling
-Sealant chemicals
-Air pressure difference
Cut/Laceration Struck By Ergonomics Chemical PhysicalM M M L M-Staple gun safety features
-Eye protection
-Gloves for sealants
-Work from intake side
Vent Crew
7. Electrical Connection & Testing-Lockout/ Tagout
-Arc flash
-Energized testing
-Fan start-up unexpected
Electrical Electrical Electrical MechanicalH H H M-LOTO before work
-Arc flash PPE
-Qualified electrician
-Test run with area clear
Electrician
8. Performance Testing-Air pressure changes
-Gas accumulation
-Dust levels
-Temperature changes
Physical Respiratory Health Heat StressM H M M-Monitor throughout installation
-Test airflow at face
-Gas readings before/after
Vent Officer

Ventilation Installation Checklist

FAN INSTALLATION:

☐ Fan base level/secure ☐ Isolation switches ☐ Guards in place ☐ Direction correct

☐ Vibration mounts ☐ Silencers fitted ☐ Drainage ☐ Fire suppression

DUCTING INSTALLATION:

☐ Correct size/type ☐ All joints sealed ☐ Suspension secure ☐ No sharp bends

☐ Grounding (if required) ☐ Clear of traffic ☐ Marked/identified ☐ End distance from face correct

Crew Acknowledgement & Sign-Off

NAMEROLETRAINING CURRENTBRIEFED BYDATETIMESIGNATURE
Supervisor Electrician Millwright Vent Crew Vent Crew☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No

More templates