Job Safety Analysis - Shaft Sinking template

Free Job Safety Analysis - Shaft Sinking template for mining you can edit online and download as PDF. Covers job information, critical safety controls - must be verified pre-shift, job sequence and hazard analysis.

Job Information

JSA ID: SSJ-__________ DATE: ______________ TIME: ______________

SHAFT NAME: ______________ DEPTH: __________ m DIAMETER: __________ m

SHIFT: ☐ Day ☐ Night ☐ Swing SHAFT CAPTAIN: ______________

Critical Safety Controls - Must Be Verified Pre-Shift

SHAFT SAFETY SYSTEMS CHECK

☐ Hoist brakes tested - Result: __________ By: __________ Time: __________
☐ Conveyance safety catches - Tested: ☐ Yes ☐ No By: __________
☐ Headframe sheaves inspected - By: __________ Condition: __________
☐ Guide rails alignment - Checked: ☐ Yes ☐ No By: __________
☐ Shaft signaling system - Tested: ☐ Yes ☐ No Method: __________
☐ Emergency stop system - Tested: ☐ Yes ☐ No Location: __________
☐ Ventilation at face - Airflow: __________ m³/s By: __________
☐ Gas monitoring - Readings: O2:__% CH4:__% CO:__ppm By: __________
☐ Dewatering pumps - Status: ☐ Operating ☐ Standby By: __________
☐ Lighting level - Adequate: ☐ Yes ☐ No By: __________

Job Sequence And Hazard Analysis

JOB STEP SEQUENCEPOTENTIAL HAZARDSHAZARD CATEGORYRISK LEVEL (H/M/L)CONTROL MEASURESRESPONSIBLE PERSONSIGN-OFF
1. Pre-descend Checks-Hoist failure
-Communication failure
-Conveyance issues
-Personal harness attachment
Fall Multiple Fall FallH H H H-Daily hoist inspection
-Test signaling before descent
-Inspect PPE and lanyards
-Double-check attachment
Shaft Captain Hoistman
2. Descent to Face-Overspeed
-Shaft obstructions
-Objects falling from above
-Sudden stop
Fall Fall Struck By FallH H H M-Monitor speed gauge
-Maintain radio contact
-Use conveyance with canopy cover
-All tools secured
Hoistman Crew
3. Face Preparation & Mucking-Rock fall
-Unstable ground
-Dust/Silica
-Mucking equipment hazards
Struck By Ground Failure Respiratory Caught InH H H M-Scale face before work
-Install temporary support as needed
-Water spray for dust
-Mucking equipment safeguards
Shaft Miner
4. Drilling Blast Holes-Flying debris
-Noise
-Hand-arm vibration
-Hydraulic oil under pressure
Struck By Hearing Health Burn/ChemicalM H M M-Drill jumbo with ROPS
-Hearing protection
-Water injection for dust
-Hose inspection
Driller
5. Loading & Blasting-Premature detonation
-Misfires
-Fly rock
-Fumes
-Evacuation failure
Explosive Explosive Struck By Respiratory MultipleH H H H H-Licensed blaster only
-Ground equipment
-Non-spark tools
-Clear shaft of all personnel
-Post guards at surface
Shotfirer
6. Post-blast Re-entry-Toxic gases
-Unstable face
-Scalding water (geothermal)
-Loose rock
Respiratory Ground Thermal Struck ByH H M H-Ventilate minimum 15 minutes
-Test air before re-entry
-Scale face
-Check for misfires
Shaft Captain Vent Officer
7. Ground Support Installation-Rock fall
-Pinch points
-Working at height
-Material handling
Struck By Caught In Fall Struck ByH M H M-Install permanent support immediately
-Use fall protection when in staging
-Secure materials
Ground Crew
8. Ascent to Surface-Overspeed
-Swinging conveyance
-Objects dropped
-Sudden stop
Fall Fall Struck By FallH M H M-Signal hoistman before ascent
-Maintain 3-point contact
-All tools secured
Hoistman Crew

Shaft Emergency Procedures

EMERGENCY ESCAPE: ☐ Cage ☐ Ladderway ☐ Manway Location: ______________

EMERGENCY COMMUNICATIONS: Primary: __________ Secondary: __________

SELF-RESCUER LOCATION: ______________ DONNED: ☐ Yes ☐ No

EMERGENCY REFUGE: ______________ CAPACITY: __________ persons

Crew Acknowledgement & Sign-Off

NAMEROLETRAINING CURRENTBRIEFED BYDATETIMESIGNATURE
Shaft Captain Hoistman Shotfirer Miner Miner Ground Crew☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No

More templates