Job Safety Analysis - Ground Control template

Free Job Safety Analysis - Ground Control template for mining you can edit online and download as PDF. Covers job information, job sequence and hazard analysis, ground control checks & testing.

Job Information

JSA ID: GCJ-__________ DATE: ______________ TIME: ______________

LOCATION: ______________ SUPERVISOR: ______________ CREW SIZE: ______________

JOB DESCRIPTION: ______________

SUPPORT TYPE: ☐ Rock Bolts ☐ Mesh ☐ Shotcrete ☐ Steel Sets ☐ Cable Bolts

Job Sequence And Hazard Analysis

JOB STEP SEQUENCEPOTENTIAL HAZARDSHAZARD CATEGORYRISK LEVEL (H/M/L)CONTROL MEASURESRESPONSIBLE PERSONSIGN-OFF
1. Face Inspection & Scaling-Rock fall
-Unsupported ground
-Scaling bar injuries
-Slips/Falls
Struck By Ground Failure Ergonomics FallH H M M-Scale loose ground
-Inspect for cracks
-Use scaling bar from safe ground
-Clear area of others
Ground Control Foreman
2. Jumbo Positioning-Pinch points
-Struck by moving jumbo
-Overhead power lines
-Uneven ground
Physical Struck By Electrical Tip-OverM H H H-Check hydraulics
-Use spotters when moving
-Maintain clearance from power
-Level ground
Jumbo Operator
3. Drilling Bolt Holes-Flying debris
-Noise
-Dust/ Silica
-Hand-arm vibration
-Hydraulic oil leaks
Struck By Health Health Ergonomics Burn/ChemicalM M H M M-Drill steel guard in place
-Water suppression
-Hearing protection
-Anti-vibration gloves
Bolter
4. Resin Cartridge Insertion-Chemical exposure
-Skin contact
-Eye exposure
Health Dermatitis Eye InjuryM L M-Wear chemical resistant gloves
-Safety glasses with side shields
Bolter
5. Bolt Insertion & Spin-Bolt ejection
-Rotating parts
-Resin cure time errors
Struck By Caught In PhysicalM H M-Proper bolt installation procedure
-Stay clear of rotating parts
Bolter
6. Torque & Tension Testing-High torque reaction
-Wrench slippage
-Bolt failure
Caught In Struck By Struck ByH M H-Use properly sized tools
-Stand clear during tensioning
-Inspect bolts after tensioning
Bolter
7. Mesh Installation-Sharp edges
-Mesh handling (heavy)
-Falling mesh
-Pinch points with bolts
Cut/Laceration Ergonomics Struck By Caught InM M M M-Heavy-duty gloves
-Team lifting
-Secure mesh before releasing
-Use tag lines
Ground Crew

Ground Control Checks & Testing

BOLT TORQUE TEST: ☐ Pass ☐ Fail Pull Test Results: __________ kN Torque Wrench Calibration: __________

RESIN CURE TIME VERIFIED: ☐ Yes ☐ No Cure Time: __________ minutes Temperature: __________°C

PHOTOGRAPHIC RECORD: ☐ Yes ☐ No Photo #: __________ INSPECTION BAR USED: ☐ Yes ☐ No

Crew Acknowledgement & Sign-Off

NAMEROLETRAINING CURRENTBRIEFED BYDATETIMESIGNATURE
Foreman Jumbo Operator Bolter Ground Crew Ground Crew☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No

More templates