Free Quality Control Method Statement template for manufacturing you can edit online and download as PDF. Covers 1.0 inspection equipment, 2.0 sampling plan, 3.0 inspection characteristics.
METHOD ID: QC-__________ DATE: ______________ REVISION: ______________
PRODUCT: ______________ PART #: ______________ CUSTOMER: ______________
INSPECTION LEVEL: ☐ Incoming ☐ In-Process ☐ Final ☐ First Article
STANDARD: ☐ ISO 9001 ☐ AS9100 ☐ IATF 16949 ☐ Other: ______________
REQUIRED GAGES/TOOLS:
☐ Caliper (Range: __________, Resolution: __________) Calibration Due: ______________
☐ Micrometer (Range: __________, Resolution: __________) Calibration Due: ______________
☐ Height Gage (Range: __________, Resolution: __________) Calibration Due: ______________
☐ Surface Plate (Grade: ______) Certification #: ______________
☐ Optical Comparator ☐ CMM ☐ Hardness Tester ☐ Tensile Tester
☐ Go/No-Go Gages: ______________
☐ Other: ______________
VERIFICATION: All equipment within calibration date ☐ Yes
SAMPLING METHOD:
☐ 100% Inspection ☐ AQL Level: ______ ☐ C=0 ☐ Random Sample ☐ First/Last Piece
LOT SIZE: ______________ SAMPLE SIZE: ______________ ACCEPTANCE NUMBER: ______________
SAMPLING FREQUENCY:
☐ Every _____ units ☐ Every _____ hours ☐ Every shift start ☐ Every setup change
| Characteristic | Specification | LSL | USL | Measurement | Result (Pass/Fail) |
|---|---|---|---|---|---|
| Dimension A Dimension B Dimension C Surface Finish Hardness Visual Function Test | ________ ________ ________ ________ ________ No defects ________ | ________ ________ ________ N/A ________ N/A N/A | ________ ________ ________ ________ ________ N/A N/A | ________ ________ ________ ________ ________ ________ ________ | ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail ☐ Pass ☐ Fail |
CRITICAL CHARACTERISTICS (Safety/Regulatory):
• All critical characteristics must meet specification 100%
• Zero defects allowed
MAJOR CHARACTERISTICS (Function/Performance):
• Must meet specification limits
• AQL = 1.0% maximum
MINOR CHARACTERISTICS (Appearance/Finish):
• Within specification limits
• AQL = 4.0% maximum
INSPECTION RESULT: ☐ Accept ☐ Reject ☐ Rework ☐ Sort ☐ Scrap
NON-CONFORMANCE REPORT #: ______________ (if applicable)
CORRECTIVE ACTION REQUIRED: ☐ Yes ☐ No
INSPECTOR: ______________ Signature: ______________ Date: ______________
QA ENGINEER: ______________ Signature: ______________ Date: ______________
ATTACHMENTS:
☐ Data Sheets ☐ Charts ☐ Photos ☐ Certificates ☐ Other: ______________