Changeover Procedure Method Statement template

Free Changeover Procedure Method Statement template for manufacturing you can edit online and download as PDF. Covers 3.0 changeover tasks (internal tasks - line stopped), 4.0 setup & adjustment (internal tasks - line stopped), 5.

METHOD ID: CO-__________ DATE: ______________ REVISION: ______________

LINE/CELL: ______________ FROM PRODUCT: ______________ TO PRODUCT: ______________

TARGET CHANGEOVER TIME: ______________ minutes ACTUAL: ______________ DATE: ______________

TEAM LEAD: ______________ CREW: 1.______________ 2.______________ 3.______________

1.0 Pre-Changeover Preparation (External Tasks - Done While Line Running)

☐ 1.1 Verify next product materials available

☐ 1.2 Stage all required tooling at designated area

☐ 1.3 Gather changeover tools/equipment

☐ 1.4 Verify all change parts are clean and in good condition

☐ 1.5 Prepare new labels/documentation

☐ 1.6 Clear area of unnecessary items

☐ 1.7 Review changeover checklist with team

☐ 1.8 Assign tasks to team members

MATERIALS FOR NEXT RUN:

• ______________ Location: ______________ Qty: ______

• ______________ Location: ______________ Qty: ______

• ______________ Location: ______________ Qty: ______

TOOLING REQUIRED:

• ______________ Location: ______________ Condition: ☐ Good ☐ Needs Repair

• ______________ Location: ______________ Condition: ☐ Good ☐ Needs Repair

2.0 Shutdown & Clearance (Internal Tasks - Line Stopped)

Time (min)Task
T+0 | Stop production - complete last good part T+1 T+2 T+3 T+4 T+5 T+6Clear line of remaining product Perform line clearance - verify no product left Return unused materials to storage Clean work area of debris/chips Stage waste/scrap for removal Prepare for changeover start

3.0 Changeover Tasks (Internal Tasks - Line Stopped)

Time (min)TaskAssigned ToCompleted ()Notes
T+6 T+8 T+10 T+12 T+14 T+16 T+18 T+20 T+22 T+24Remove current tooling/dies Clean machine/tooling surfaces Install new tooling/dies Secure and torque fasteners Connect utilities (air/power) Load new material Set machine parameters Load new program (if applicable) Install change parts Verify all guards in place____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________

4.0 Setup & Adjustment (Internal Tasks - Line Stopped)

StepAction
4.1
4.2
4.3
4.4
4.5
4.6
4.7
4.8
Perform dry run without material Check all movements/functions Make initial adjustments Run first piece Inspect first piece per specifications Adjust as needed Run second piece for verification Get QA approval for first article

FIRST PIECE INSPECTION RESULTS:

Dimension 1: ______________ / ______________ ☐ Pass ☐ Fail

Dimension 2: ______________ / ______________ ☐ Pass ☐ Fail

Dimension 3: ______________ / ______________ ☐ Pass ☐ Fail

Visual: ☐ Pass ☐ Fail

QA APPROVAL: ______________ Date: ______________

5.0 Startup & Verification

StepAction
5.1 | Start production at slow speed
5.2
5.3
5.4
5.5
5.6
5.7
Check first 5 pieces at each station Ramp up to production speed Verify quality at full speed Complete changeover documentation Return changeover tools to storage Clean up changeover area

CHANGEOVER METRICS:

Total Changeover Time: ______________ minutes Target: ______________ minutes

Number of Adjustments: ______________

First Pass Yield: ______________%

OPPORTUNITIES FOR IMPROVEMENT:

______________

COMPLETED BY: ______________ Signature: ______________ Date: ______________

REVIEWED BY: ______________ Signature: ______________ Date: ______________