Free Changeover Procedure Method Statement template for manufacturing you can edit online and download as PDF. Covers 3.0 changeover tasks (internal tasks - line stopped), 4.0 setup & adjustment (internal tasks - line stopped), 5.
METHOD ID: CO-__________ DATE: ______________ REVISION: ______________
LINE/CELL: ______________ FROM PRODUCT: ______________ TO PRODUCT: ______________
TARGET CHANGEOVER TIME: ______________ minutes ACTUAL: ______________ DATE: ______________
TEAM LEAD: ______________ CREW: 1.______________ 2.______________ 3.______________
☐ 1.1 Verify next product materials available
☐ 1.2 Stage all required tooling at designated area
☐ 1.3 Gather changeover tools/equipment
☐ 1.4 Verify all change parts are clean and in good condition
☐ 1.5 Prepare new labels/documentation
☐ 1.6 Clear area of unnecessary items
☐ 1.7 Review changeover checklist with team
☐ 1.8 Assign tasks to team members
MATERIALS FOR NEXT RUN:
• ______________ Location: ______________ Qty: ______
• ______________ Location: ______________ Qty: ______
• ______________ Location: ______________ Qty: ______
TOOLING REQUIRED:
• ______________ Location: ______________ Condition: ☐ Good ☐ Needs Repair
• ______________ Location: ______________ Condition: ☐ Good ☐ Needs Repair
| Time (min) | Task |
|---|---|
| T+0 | Stop production - complete last good part T+1 T+2 T+3 T+4 T+5 T+6 | Clear line of remaining product Perform line clearance - verify no product left Return unused materials to storage Clean work area of debris/chips Stage waste/scrap for removal Prepare for changeover start |
| Time (min) | Task | Assigned To | Completed () | Notes |
|---|---|---|---|---|
| T+6 T+8 T+10 T+12 T+14 T+16 T+18 T+20 T+22 T+24 | Remove current tooling/dies Clean machine/tooling surfaces Install new tooling/dies Secure and torque fasteners Connect utilities (air/power) Load new material Set machine parameters Load new program (if applicable) Install change parts Verify all guards in place | ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ |
| Step | Action |
|---|---|
| 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 | Perform dry run without material Check all movements/functions Make initial adjustments Run first piece Inspect first piece per specifications Adjust as needed Run second piece for verification Get QA approval for first article |
FIRST PIECE INSPECTION RESULTS:
Dimension 1: ______________ / ______________ ☐ Pass ☐ Fail
Dimension 2: ______________ / ______________ ☐ Pass ☐ Fail
Dimension 3: ______________ / ______________ ☐ Pass ☐ Fail
Visual: ☐ Pass ☐ Fail
QA APPROVAL: ______________ Date: ______________
| Step | Action |
|---|---|
| 5.1 | Start production at slow speed 5.2 5.3 5.4 5.5 5.6 5.7 | Check first 5 pieces at each station Ramp up to production speed Verify quality at full speed Complete changeover documentation Return changeover tools to storage Clean up changeover area |
CHANGEOVER METRICS:
Total Changeover Time: ______________ minutes Target: ______________ minutes
Number of Adjustments: ______________
First Pass Yield: ______________%
OPPORTUNITIES FOR IMPROVEMENT:
______________
COMPLETED BY: ______________ Signature: ______________ Date: ______________
REVIEWED BY: ______________ Signature: ______________ Date: ______________