Maintenance Procedure Method Statement template

Free Maintenance Procedure Method Statement template for manufacturing you can edit online and download as PDF. Covers 1.0 safety precautions, 2.0 maintenance tasks, 3.0 testing & verification.

METHOD ID: MP-__________ DATE: ______________ REVISION: ______________

EQUIPMENT: ______________ ASSET #: ______________ LOCATION: ______________

MAINTENANCE TYPE: ☐ Preventive ☐ Predictive ☐ Corrective ☐ Emergency

FREQUENCY: ☐ Daily ☐ Weekly ☐ Monthly ☐ Quarterly ☐ Annually LAST PERFORMED: ______________

1.0 Safety Precautions

☐ Complete Lockout/Tagout per procedure LOTO-__________

☐ Verify zero energy state

☐ Test for absence of voltage (electrical work)

☐ Release stored energy (springs, capacitors, etc.)

☐ Block or pin raised components

☐ Ventilate area if required

☐ Post warning signs

☐ Establish communication with affected personnel

SPECIFIC HAZARDS: ______________

2.0 Maintenance Tasks

Task #Description
2.1Inspection:
☐ Visual inspection for damage/wear
☐ Check fluid levels
☐ Inspect belts/chains
☐ Check for leaks
☐ Verify alignment
☐ Check fasteners for tightness
☐ Inspect electrical connections
☐ Check safety devices
2.2Lubrication:
☐ Grease fittings (points: __________)
☐ Oil reservoirs (type: __________)
☐ Check gearboxes
☐ Apply anti-seize where specified
2.3Cleaning:
☐ Remove debris
☐ Clean filters
☐ Wipe down surfaces
☐ Clean cooling fins/fans
2.4Adjustments:
☐ Tension belts/chains
☐ Align components
☐ Calibrate sensors
☐ Set clearances
2.5Component Replacement:
☐ Replace worn parts: ______________
☐ Install new filters
☐ Change fluids
☐ Update parts inventory

3.0 Testing & Verification

StepAction
3.1
3.2
3.3
3.4
3.5
3.6
3.7
Remove LOTO devices Restore power/utilities Perform operational test Check for unusual noise/vibration Verify all parameters within specs Test safety devices Run under load conditions

4.0 Documentation & Closeout

PARTS USED:

1. ______________ Part #: ______________ Qty: ______

2. ______________ Part #: ______________ Qty: ______

FINDINGS: ______________

RECOMMENDATIONS: ______________

NEXT SERVICE DUE: ______________ HOUR METER READING: ______________

TECHNICIAN: ______________ Signature: ______________ Date: ______________

SUPERVISOR: ______________ Signature: ______________ Date: ______________

More templates