Free Packaging Method Statement template for manufacturing you can edit online and download as PDF. Covers 1.0 packaging specifications, 2.0 packing procedure, 3.0 labeling requirements.
METHOD ID: PKG-__________ DATE: ______________ REVISION: ______________
PRODUCT: ______________ PART #: ______________ QUANTITY: ______________
CUSTOMER: ______________ ORDER #: ______________ SHIP DATE: ______________
PACKAGING TYPE: ☐ Standard ☐ Export ☐ Hazardous ☐ Temperature Controlled
PRIMARY PACKAGING:
☐ Poly Bag (Size: ______, Thickness: ______ mil) ☐ Blister Pack ☐ Clamshell
☐ Box (Dimensions: ______ x ______ x ______) ☐ Tray ☐ Tube ☐ Bottle
☐ Other: ______________
SECONDARY PACKAGING:
☐ Corrugated Box (Dimensions: ______ x ______ x ______, Grade: ______)
☐ Shrink Wrap ☐ Stretch Wrap ☐ Dividers ☐ Cushioning ☐ Dunnage
☐ Other: ______________
PALLET SPECIFICATIONS:
Size: ______ x ______ Type: ☐ GMA ☐ Euro ☐ Custom Height: ______" Max Weight: ______ lbs
☐ Slip Sheet Required ☐ Corner Boards ☐ Edge Protectors ☐ Banding
| Step | Action |
|---|---|
| 2.1 2.2 2.3 2.4 2.5 2.6 | Verify product meets quality standards before packaging Clean work surface and prepare packaging materials Apply primary packaging: • Place product correctly in package • Seal per specification • Verify seal integrity Apply labels to primary package Place into secondary packaging: • Quantity per box: ______________ units • Arrange per specification • Add cushioning/dunnage as required Seal secondary package: • Method: ☐ Tape ☐ Glue ☐ Staples ☐ Strapping • Verify seal strength |
PRIMARY LABEL (Required on each unit):
☐ Part Number: ______________ ☐ Revision: ______ ☐ Quantity: ______
☐ Date Code: ______________ ☐ Lot/Batch #: ______________
☐ Serial # Range: ______________ ☐ Expiration Date: ______________
SECONDARY LABEL (Required on each box):
☐ Part Number: ______________ ☐ Description: ______________
☐ Quantity: ______ ☐ PO #: ______________ ☐ Date: ______________
☐ Customer Part #: ______________ ☐ CoC Required: ☐ Yes ☐ No
SHIPPING LABEL:
☐ Ship To: ______________ ☐ Ship From: ______________
☐ Carrier: ______________ ☐ Tracking #: ______________
☐ Hazard Class: ______________ ☐ UN #: ______________
☐ Handling Marks: ☐ Fragile ☐ This Side Up ☐ Keep Dry ☐ Stack Limit: ______
| Step | Action |
|---|---|
| 4.1 4.2 4.3 4.4 4.5 4.6 4.7 4.8 | Inspect pallet for damage Place pallet in designated area Apply pallet label if required Stack boxes per pattern: • Pattern: ☐ Column Stack ☐ Brick Stack ☐ Pinwheel ☐ Custom • Boxes per layer: ______ • Layers per pallet: ______ • Total boxes: ______ • Total weight: ______ lbs Apply corner boards if required Apply strapping/banding: • Quantity: ______ straps • Tension: ______ lbs Apply stretch wrap: • Wraps: ______ layers • Top/Bottom wraps: ______ Apply final pallet label |
☐ All units properly packaged
☐ All boxes sealed correctly
☐ All labels applied and legible
☐ Labels match product/order documentation
☐ Pallet stable and secure
☐ Total quantity matches order
☐ Documentation complete
PACKAGING MATERIAL USED:
Boxes: ______ Labels: ______ Tape: ______ Wrap: ______ Pallets: ______
PACKED BY: ______________ Signature: ______________ Date: ______________
VERIFIED BY: ______________ Signature: ______________ Date: ______________