Free Material Handling Method Statement template for manufacturing you can edit online and download as PDF. Covers 1.0 material characteristics, 2.0 equipment selection, 3.0 load preparation.
METHOD ID: MH-__________ DATE: ______________ REVISION: ______________
MATERIAL: ______________ PART #: ______________ QUANTITY: ______________
FROM: ______________ TO: ______________ DISTANCE: ______________ ft
HANDLING TYPE: ☐ Raw Material ☐ WIP ☐ Finished Goods ☐ Hazardous Material
DIMENSIONS: Length: ______" Width: ______" Height: ______" Weight: ______ lbs
SPECIAL CHARACTERISTICS:
☐ Fragile ☐ Temperature Sensitive ☐ Moisture Sensitive ☐ Static Sensitive
☐ Hazardous ☐ Heavy/Bulky ☐ Odd Shape ☐ Stackable
☐ Other: ______________
STORAGE CONDITIONS REQUIRED:
Temperature: ______________ °F Humidity: ______________ % RH Ventilation: ☐ Yes ☐ No
☐ Forklift (Capacity: ______ lbs) ☐ Pallet Jack ☐ Crane/Hoist (Capacity: ______ lbs)
☐ Conveyor ☐ Cart/Dolly ☐ Reach Truck ☐ Turret Truck
☐ Automated Guided Vehicle (AGV) ☐ Lift Table ☐ Vacuum Lifter
☐ Other: ______________
ATTACHMENTS/TOOLING:
☐ Slipsheet ☐ Clamp Attachment ☐ Rotator ☐ Extend Forks ☐ Spreader Beam
☐ Lifting Slings (Type: ______) ☐ Lifting Lugs ☐ Vacuum Cups
PRE-USE INSPECTION:
☐ Equipment inspected and operational ☐ Safety devices functional ☐ Load chart available
| Step | Action |
|---|---|
| 3.1 3.2 3.3 3.4 3.5 3.6 3.7 | Verify material identification/labeling Check material condition for damage Prepare load: ☐ Palletize ☐ Stretch wrap ☐ Banding ☐ Edge protectors ☐ Place in tote/bin ☐ Use slip sheets Verify load stability Calculate total weight Mark center of gravity if needed Apply warning labels if required |
| Phase | Requirements |
|---|---|
| LOADING | • Position equipment correctly • Insert forks/attachment fully • Tilt load back (forklift) • Lift just enough to clear floor • Check stability before moving • Secure load if required |
| TRAVEL | • Travel with load low (4-6" off ground) • Observe speed limits: ______ mph • Use designated travel lanes • Sound horn at intersections • Watch for pedestrians • Avoid sudden stops/starts • Maintain safe following distance |
| UNLOADING | • Position accurately at destination • Lower load slowly • Verify stable placement • Remove equipment carefully • Check for tip hazards |
STORAGE LOCATION: Aisle: ______ Rack: ______ Level: ______ Bin: ______
STACKING LIMITS: Maximum height: ______ units Maximum stacks: ______
☐ First-In-First-Out (FIFO) ☐ Last-In-First-Out (LIFO) ☐ Specific Lot Tracking
SPECIAL STORAGE INSTRUCTIONS:
______________
HANDLED BY: ______________ Signature: ______________ Date: ______________
VERIFIED BY: ______________ Signature: ______________ Date: ______________