Free ⬆ Work At Height Permit (Enhanced) template for construction you can edit online and download as PDF. Covers permit information, hazard identification, attached documents.
PTW REFERENCE: PTW-______________ CONTRACTOR: ______________
PROJECT NAME: ______________ NO. OF EMPLOYEES INVOLVED: _____
STARTING FROM: ______________ DATE: ______________ TIME: ______________
EXPECTED COMPLETION: ______________ DATE: ______________ TIME: ______________
WORK TYPE:
☐ Scaffolding ☐ Ladder ☐ Aerial Lifts (MEWP) ☐ Roof Work ☐ Steel Erection ☐ Other: ______________
WORK DESCRIPTION: ______________
______________
LOCATION OF JOB TO BE PERFORMED: ______________
WORKING HEIGHT: ______________ meters (Approximately ______________ floors)
TOOLS/EQUIPMENT TO BE USED: ______________
______________
Identify risk associated with Work At Height:
☐ Fall from Height ☐ Adverse Weather ☐ Flying particles ☐ Moving Vehicle/Equipment
☐ Falling Debris/Objects ☐ Protruding objects ☐ Tripping / Slipping ☐ Faulty Equipment/Material
☐ Fragile Surface/Roof ☐ Work Below ☐ Near Overhead lines ☐ Near energized equipment
☐ Scaffold Collapse ☐ Ladder Slip/Tip ☐ MEWP Tip-Over ☐ Unprotected Edges
☐ Opening in Floors/Walls ☐ Unstable Surface ☐ Weather (wind/rain) ☐ Other: ______________
OTHER HAZARDS (Specify): ______________
______________
The following document must be attached with this permit:
| DOCUMENT | ATTACHED | REFERENCE NUMBER |
|---|---|---|
| Method Statement Risk Assessment (RAMS) Scaffold Design / Calculations Scaffold Tag / Inspection Report MEWP Inspection Certificate Fall Protection Plan Rescue Plan (for work at height) Other (specify): ______________ | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | Rev #: ______________ Ref #: ______________ Drawing #: ______________ Date: ______________ Date: ______________ Ref #: ______________ Ref #: ______________ Ref #: ______________ |
| Precaution require to complete the work safely | Yes | No | N/A | Remarks |
|---|---|---|---|---|
| Have the risk control/s been implemented? | ☐ | ☐ | ☐ | |
| FALL PROTECTION SYSTEMS: ☐ Guard Rails system - Top rail (1m), Mid rail, Toe board ☐ Safety Net - Installed and inspected ☐ Toe Board - Installed to prevent falling objects | ☐ ☐ ☐ | ☐ ☐ ☐ | ☐ ☐ ☐ | |
| FALL RESTRAINT SYSTEMS: ☐ Personal Fall Restraint System ☐ Lifeline - Horizontal / Vertical installed and inspected ☐ Retractable Lifeline / Self-Retracting Lifeline (SRL) | ☐ ☐ ☐ | ☐ ☐ ☐ | ☐ ☐ ☐ | |
| FALL ARREST SYSTEMS: ☐ Full Body Harness - Inspected and within expiry ☐ Shock Absorbing Lanyard - Inspected and within expiry ☐ Double Lanyard with Double Hook (100% tie-off) ☐ Anchor Points - Certified and load tested ☐ Connectors (Carabiners) - Self-closing and locking | ☐ ☐ ☐ ☐ | ☐ | ☐ | ☐ | ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ | |
| ACCESS / EGRESS: ☐ Have proper access/egress been provided? ☐ Is access/egress clear of obstructions? ☐ Is ladder secured against movement? ☐ Does ladder extend at least 1m above landing? ☐ Is ladder angle correct (4:1 ratio)? | ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ | |
| WEATHER CONDITIONS: Is wind speed greater than 32 km/h? If yes, do not proceed Is there rain, lightning, or poor visibility? If yes, do not proceed | ☐ ☐ | ☐ ☐ | ☐ ☐ | Wind: __ |
| ROOF WORK: Are all floor openings at roof adequately covered/protected to prevent falling? Is the roof surface checked for fragility? Are warning signs posted at roof edge? Are crawl boards/roof ladders used on fragile roofs? | ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ | |
| SCAFFOLD: Is the scaffold erected by competent persons? Is the scaffold inspected by Certified Person? Name of Inspector: ______________ Date of Inspection: ______________ Is scaffold tag in place and current? (Green/Red) Are base plates / mud sills adequate? Are guardrails and toe boards in place on all open sides? Is the scaffold level and plumb? Are all ties / bracing in place? Is the working platform fully boarded? Is there safe access to scaffold (ladder)? | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | Color: _ |
| LADDER: Is the ladder industrial grade and rated for work? Is the ladder in good condition (no damage)? Is the ladder placed on firm, level ground? Is the ladder secured at top and bottom? Is the ladder the correct height for the task? Are both hands free when climbing? Is the 3-point contact maintained at all times? | ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ | |
| MEWP (AERIAL LIFT): Is the MEWP inspected and certified? Is the operator trained and authorized? Is the ground condition adequate for MEWP set-up? Are outriggers/stabilizers deployed (if applicable)? Is the MEWP on firm, level ground? Are guardrails in place and gate closed? Are occupants wearing full body harness with lanyard attached to designated point? Is the MEWP kept clear of overhead power lines? | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | Dist: __ |
| MATERIAL HANDLING AT HEIGHT: Are materials secured to prevent falling? Is there a designated dropping zone with barricades? Are tool lanyards used for hand tools? Is there a material hoist or designated lifting area? | ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ |
The following areas / items have been inspected by issuer and receiver:
| ITEM | STATUS | COMMENTS |
|---|---|---|
| Danger / Warning Signs Scaffold Tag System Lighting (if required) Safety Barriers / Barricades Buddy System / Communication Rescue Plan / Equipment Material Basket / Hoist (if used) Tool Lanyards Full Body Harnesses Lanyards / SRLs Anchor Points | In Place ☐ Not Current ☐ Not Adequate ☐ Not In Place ☐ Not In Place ☐ Not Available ☐ Not Certified ☐ Not Available ☐ Not Inspected ☐ Not Inspected ☐ Not Certified ☐ Not | ________ Tag #: _________ Color: _____ Expiry: __________ ________ Drop zone barricaded: ☐ Yes ☐ No Communication method: ______________ Rescue equipment: ______________ SWL: _____ tons Cert Date: _________ Qty: _____ Condition: ☐ Good ☐ Poor Qty: _____ Last Insp: _________ Qty: _____ Last Insp: _________ Load rating: _____ kN Cert Date: _________ |
| SCAFFOLD INSPECTION (if applicable): Base Plates / Mud Sills Guardrails (top, mid, toe board) Working Platform - Fully boarded Access Ladder - Safe and secure Ties / Bracing - In place | Adequate ☐ Not In Place ☐ Not Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ | ________ ________ Gaps: _____ mm ________ ________ |
| LADDER INSPECTION (if applicable): Ladder Condition Ladder Secured (top & bottom) Ladder Angle (4:1 ratio) Ladder Extends 1m above landing | Good ☐ Poor ☐ Yes ☐ No ☐ Correct ☐ Not Yes ☐ No ☐ | ________ ________ Ratio: _________ Extension: _____ m |
| MEWP INSPECTION (if applicable): MEWP Condition Safety Devices Operational Outriggers/Stabilizers Deployed Ground Condition Adequate Harness Attachment Point Used | Good ☐ Poor ☐ Yes ☐ No ☐ Yes ☐ No ☐ N/A Yes ☐ No ☐ Yes ☐ No ☐ | Hours: _____ ________ ________ ________ ________ |
OTHER ITEMS (Specify):
______________
INSPECTED BY (Issuer): ______________ DATE: ______________ TIME: ______________
INSPECTED BY (Receiver): ______________ DATE: ______________ TIME: ______________
| PERSONAL FALL PROTECTION EQUIPMENT: | STATUS | NEXT INSPECTION |
|---|---|---|
| Full Body Harness - Webbing condition Full Body Harness - Buckles/D-rings Full Body Harness - Stitching Shock Absorbing Lanyard - Condition Shock Absorbing Lanyard - Deployment indicator intact Self-Retracting Lifeline (SRL) - Function SRL - Cable/Webbing condition Carabiners / Connectors - Self-closing & locking Anchor Points - Certified | Good ☐ Fault ☐ Good ☐ Fault ☐ Good ☐ Fault ☐ Good ☐ Fault ☐ Yes ☐ No ☐ Good ☐ Fault ☐ Good ☐ Fault ☐ Good ☐ Fault ☐ Yes ☐ No ☐ | Due: ______________ Due: ______________ Due: ______________ Due: ______________ Due: ______________ Due: ______________ Due: ______________ Due: ______________ Cert Date: _________ |
INSPECTED BY (Competent Person): ______________ DATE: ______________
RESCUE PLAN IN PLACE: ☐ Yes ☐ No
RESCUE METHOD:
☐ Self-rescue (worker can descend unassisted)
☐ Assisted rescue (by trained team on site)
☐ Aerial lift rescue (MEWP used for rescue)
☐ Emergency services rescue (call external rescue)
RESCUE EQUIPMENT AVAILABLE:
☐ Rescue pole / hook ☐ Rescue ladder ☐ Aerial lift on standby
☐ Rescue tripod/winch ☐ Stretcher ☐ First aid kit
☐ Communication device ☐ Trauma kit ☐ Other: ______________
RESCUE TEAM CONTACT: ______________ Phone: ______________ Radio: Channel _____
RESCUE PROCEDURES BRIEFED TO ALL PERSONNEL? ☐ Yes ☐ No
BRIEFING CONDUCTED BY: ______________ DATE: ______________
PPE Required for the activity:
MANDATORY PPE:
☐ Helmet with Chin Strap ☐ Safety Shoes / Steel-toed boots ☐ Reflective Vest
☐ Safety Goggles / Glasses ☐ Safety Gloves ☐ Safety Ear Plugs / Muffs
☐ High Visibility Clothing ☐ Safety Clothes / Coveralls
FALL PROTECTION PPE:
☐ Full Body Harness ☐ Shock Absorbing Lanyard (Double Hook) ☐ Self-Retracting Lifeline (SRL)
☐ Fall Restraint System ☐ Tool Lanyards ☐ Anchor Point Connectors
ADDITIONAL PPE (as required):
☐ Dust Mask / Respirator (Type: ______________) ☐ Face Shield
☐ Sun Protection / Sun Hat ☐ Weather Protection ☐ Other: ______________
PPE VERIFIED BY: ______________ DATE: ______________ TIME: ______________
TOPICS COVERED:
☐ Fall hazards & controls ☐ Fall protection systems ☐ Proper use of harness & lanyard
☐ 100% tie-off requirement ☐ Scaffold/ladder safety ☐ MEWP safe operation
☐ Tool/material handling ☐ Rescue procedures ☐ Emergency procedures
☐ Weather considerations ☐ Stop work authority ☐ Communication methods
ATTENDEES:
| NAME | ROLE | COMPANY | SIGNATURE | ||
|---|---|---|---|---|---|
| ________ ________ ________ ________ ________ ________ | ________ ________ ________ ________ ________ ________ | ________ ________ ________ ________ ________ ________ | ________ ________ ________ ________ ________ ________ |
MEETING CONDUCTED BY: ______________ DATE: ______________ TIME: ______________
PERMIT RECEIVER (Confirms understanding of hazards and controls):
I certify that I have read and verified this work at height permit and checklist. I am aware of the
fall hazards and will use fall protection equipment as required.
Name: ______________ Signature: ______________ Date: ___________
PERMIT ISSUER (Authorizes work to proceed):
I have reviewed the work at height checklist and checked the working conditions. I am satisfied
that all fall protection measures are in place and the activity is authorized to proceed.
Name: ______________ Signature: ______________ Date: ___________
SCAFFOLD INSPECTOR (If applicable):
I confirm that the scaffold has been inspected and is safe for use.
Name: ______________ Signature: ______________ Date: ___________
MEWP OPERATOR (If applicable):
I confirm that the MEWP has been inspected and I am trained to operate it safely.
Name: ______________ Signature: ______________ Date: ___________
SAFETY OFFICER (Verifies controls in place):
Name: ______________ Signature: ______________ Date: ___________
WORK COMPLETED / SUSPENDED:
Date: ______________ Time: ______________ ☐ Completed ☐ Suspended ☐ Aborted
WORK AREA SECURED:
☐ All personnel accounted for
☐ Fall protection equipment removed and stored
☐ Scaffold / MEWP / Ladder secured
☐ Tools and materials removed
☐ Warning signs/barricades removed (if appropriate)
☐ Area left in safe condition
SIGN-OFF:
Supervisor: ______________ Signature: ______________ Date: ___________
Area Authority: ______________ Signature: ______________ Date: ___________
THIS PERMIT IS VALID ONLY FOR THE DATE AND TIME SPECIFIED - ONE SHIFT ONLY