Free Roofing Job Safety Analysis template for construction you can edit online and download as PDF. Covers project information, job steps & hazard analysis.
JSA ID: ROOF-__________ DATE: ______________ TIME: ______________
PROJECT: ______________ LOCATION: ______________ ROOF TYPE: ☐ Flat ☐ Sloped ☐ Steep
ROOFER: ______________ HEIGHT: ______________ ft PITCH: ______________ /12 CREW SIZE: ___________
| JOB STEP | HAZARDS IDENTIFIED | POTENTIAL CONSEQUENCE | RISK RATING (L x S) | CONTROL MEASURES |
|---|---|---|---|---|
| 1. Material Hoisting & Loading | -Heavy bundles -Unstable load -Crane/swing radius -Weather | -Back strain -Dropped material -Struck by -Wind event | 12 (HIGH) | -Team lifting -Use mechanical lift equipment -Barricade drop zone (1.5x height) -Tag lines on all loads -Stop if wind >25mph |
| 2. Roof Access & Edge Setup | -No anchor points -Unprotected edges -Ladder slips | -Fall from roof edge -Death | 25 (VERY HIGH) | -100% tie-off at all times -Install guardrails at edges -Use personal fall arrest system -Anchor points rated 5000lbs -Secure ladders at top |
| 3. Roof Preparation (Tear-off) | -Heat stress -Falling tools -Nail guns -Sharp edges -Dust | -Heat stroke -Tool drop -Puncture wounds -Lacerations | 16 (HIGH) | -Schedule work for cool hours -Provide water and shade -Use tool lanyards -Magnetic sweep for nails -Heavy gloves/pads |
| 4. Underlay & Felt Installation | -Slips on sloped surface -Unsecured felt rolls -Loose debris | -Fall from roof -Roll from roof | 20 (VERY HIGH) | -Use slip-resistant shoes -Maintain 100% tie-off -Install roof brackets -Secure rolls when not in use -Keep work area clear |
| 5. Material Application (Torch/ Hot Tar) | -Hot kettle -Fumes -Fire hazard -Torch operation | -Burns -Inhalation -Roof fire -Explosion | 15 (HIGH) | -Use kettle with temperature control -Position kettle away from traffic -Fire extinguisher within 25ft -Check for combustibles -Ventilate work area |
| 6. Shingle Installation (Sloped) | -Nail gun accidents -Loose shingles -Tool drop -Overreaching | -Puncture wounds -Slide from roof -Fall | 12 (HIGH) | -Use nail gun safety features -Keep hands clear of nailing path -Maintain tie-off -Secure unused shingles -Work within safe reach |
| 7. Flashing & Edge Work | -Ladders on sloped roof -Metal edges -Sealant fumes | -Ladder slip -Fall -Lacerations -Inhalation | 12 (HIGH) | -Secure all ladders -Use roof brackets -Wear cut-resistant gloves -Use proper ventilation -Dispose of sharp material properly |
| 8. Cleanup & Debris Removal | -Leftover materials -Loose nails -Loading dumpster | -Trips -Falling debris -Back injury | 8 (MODERATE) | -Daily clean-up -Debris chute for disposal -Magnetic sweep -Mechanical handling -Close dumpster lid |
FALL PROTECTION SYSTEM: ☐ Guardrails ☐ Safety Net ☐ Personal Fall Arrest ☐ Warning Line ☐ Safety Monitor
Anchor Points: Location: ______________ Capacity: 5000 lbs Spacing: ______________ ft
HOT WORK PERMIT #: ______________ Fire Watch: ______________ Extinguisher Location: ______________
REQUIRED PPE: ☐ Hard Hat ☐ Safety Glasses ☐ Roofing Boots ☐ Gloves ☐ Fall Protection ☐ Sun Protection
SUPERVISOR: ______________ Signature: ______________ Date: ______________
WORKER ACKNOWLEDGMENT: 1. ______________ 2. ______________ 3. ______________