Demolition Job Safety Analysis template

Free Demolition Job Safety Analysis template for construction you can edit online and download as PDF. Covers project information, job steps & hazard analysis.

Project Information

JSA ID: DEMO-__________ DATE: ______________ TIME: ______________

PROJECT: ______________ LOCATION: ______________ STRUCTURE: ______________

METHOD: ☐ Mechanical ☐ Manual ☐ Implosion STRUCTURE ENGINEER: ______________ CREW SIZE: ______________

Job Steps & Hazard Analysis

JOB STEPHAZARDS IDENTIFIEDPOTENTIAL CONSEQUENCERISK RATING (L x S)CONTROL MEASURES
1. Engineering Survey-Unknown structural conditions
-Asbestos
-Lead paint
-Collapse
-Death
-Health exposure
25 (VERY HIGH)-Structural engineer assessment
-Identify load-bearing walls
-Check for hazardous materials
-Survey for asbestos (AHERA)
-Test for lead
2. Utility Isolation-Live gas
-Energized electrical
-Water lines
-Sewer lines
-Explosion
-Electrocution
-Fire
-Flooding
-Contamination
25 (VERY HIGH)-Locate all utilities
-Cap gas lines
-Lockout/tagout electrical
-Drain water lines
-Notify utility companies
3. Hazardous Material Removal-Asbestos
-Lead dust
-Silica dust
-PCBs
-Mercury
-Lung disease
-Poisoning
-Silicosis
-Cancer
20 (VERY HIGH)-Hazardous material abatement first
-Licensed abatement contractors
-Negative air pressure
-HEPA vacuum
-Proper disposal manifests
4. Sequential Demolition (Top-Down)-Uncontrolled collapse
-Flying debris
-Vibration
-Premature collapse
-Struck by
-Structural damage
25 (VERY HIGH)-Follow engineered sequence
-Remove non-load bearing first
-Maintain stability
-Monitor for movement
-Use dust suppression
5. Heavy Equipment Operation-Equipment instability
-Operator visibility
-Swing radius
-Tip over
-Struck by debris
-Crush injuries
16 (HIGH)-Grade stable surface
-Inspect equipment daily
-Exclusion zone 1.5x structure height
-Use spotter
-Barricade swing area
6. Manual Demolition (Hand Tools )-Falls from height
-Flying chips
-Overexertion
-Sharp edges
-Fall from height
-Eye injury
-Strains
-Lacerations
15 (HIGH)-Scaffolding or lifts for height
-Full body harness
-Safety glasses with side shields
-Rotate tasks
-Heavy leather gloves
7. Debris Handling & Removal-Dust
-Heavy lifting
-Sharp objects
-Contaminated materials
-Silicosis
-Back injury
-Puncture wounds
-Chemical exposure
12 (HIGH)-Water spray for dust control
-Mechanical handling equipment
-Remove nails from lumber
-Separate hazardous waste
-Proper disposal containers

AIR MONITORING: Silica: ______mg/m3 Lead: ______mg/m3 Asbestos: ______f/cc Date: ______________

REQUIRED PPE: ☐ Hard Hat ☐ Safety Glasses ☐ Hearing Protection ☐ N100 Respirator ☐ Tyvek Suit ☐ Gloves

STRUCTURE ENGINEER: ______________ Signature: ______________ Date: ______________

WORKER ACKNOWLEDGMENT: 1. ______________ 2. ______________ 3. ______________