Free Crane Lift Job Safety Analysis template for construction you can edit online and download as PDF. Covers lift information, job steps & hazard analysis.
JSA ID: CRANE-__________ DATE: ______________ TIME: ______________
PROJECT: ______________ LOCATION: ______________ LIFT TYPE: ☐ Critical ☐ Standard
CRANE TYPE: ______________ CAPACITY: ______________ tons LOAD WEIGHT: ______________ lbs
LIFT DIRECTOR: ______________ OPERATOR: ______________ SIGNAL PERSON: ______________
| JOB STEP | HAZARDS IDENTIFIED | POTENTIAL CONSEQUENCE | RISK RATING (L x S) | CONTROL MEASURES |
|---|---|---|---|---|
| 1. Pre-Lift Planning | -Power lines -Soft ground -Obstructions -Weather | -Electrocution -Tip over -Collision -Load drop | 25 (VERY HIGH) | -Survey site for overhead hazards -Verify ground bearing capacity -Maintain 20ft from power lines -Check wind speed (max 25mph) |
| 2. Crane Setup & Leveling | -Outrigger failure -Unstable ground | -Settlement -Tip over -Structural collapse | 20 (VERY HIGH) | -Fully extend outriggers -Use crane mats/cribbing -Level crane within 1% -Verify all pins locked |
| 3. Rigging Inspection & Setup | -Worn slings -Wrong hitch -Overloaded shackles | -Dropped load -Property damage -Fatality | 16 (HIGH) | -Inspect all rigging before use -Verify sling angles (>60°) -Match capacity to load weight -Use spreader bars for wide loads |
| 4. Lift Execution | -Workers in swing radius -Communication failure | -Struck by load -Misunderstood commands | 20 (VERY HIGH) | -Barricade swing radius -Use tag lines on all loads -Test radio communication -Establish hand signals backup |
| 5. Load Placement | -Unstable landing -Crew under suspended load | -Load shift -Pinch points -Crush injuries | 12 (HIGH) | -Lower load slowly -Use cribbing for level landing -Keep hands clear of landing area -Never walk under suspended load |
| 6. Post-Lift Shutdown | -Unsecured crane -Unauthorized use | -Shift during wind -Unauthorized operation | 8 (MODERATE) | -Secure crane for overnight -Lower boom to transport position -Remove keys from ignition -Document lift in log |
CRITICAL LIFT CHECKLIST (if applicable): ☐ Pre-lift meeting ☐ Third-party inspection ☐ Engineering review
REQUIRED PPE: ☐ Hard Hat ☐ Safety Glasses ☐ High-Vis Vest ☐ Steel-Toe Boots ☐ Gloves ☐ Hearing Protection
LIFT DIRECTOR: ______________ Signature: ______________ Date: ______________
WORKER ACKNOWLEDGMENT: 1. ______________ 2. ______________ 3. ______________