Free Underground Work Risk Assessment template for construction you can edit online and download as PDF. Covers hazards and controls, pre-start checks, approval & sign-off.
REF: CUW-______ REVISION: 01 DATE: ____/____/________
| DOCUMENT DETAILS | |
|---|---|
| PROJECT / LOCATION: ______________ | WORK DESCRIPTION: ______________ |
| ASSESSOR: ______________ | DATE: ______________ |
| DEPTH / EXTENT: ______________ | SUPERVISOR: ______________ |
| Hazard | Who / what is at risk | Existing controls | L | S | Risk | Additional controls / owner |
|---|---|---|---|---|---|---|
| Collapse of ground or excavation | Workers un derground | Shoring or support design, daily inspection by competent person | ||||
| Oxygen deficiency and toxic or flammable gas | Workers un derground | Gas detection, forced ven tilation, entry permit | ||||
| Services strike (gas, electric, water) | Workers, public | Service drawings, scanning, trial holes, hand digging near services | ||||
| Flooding / groundwate r inflow | Workers un derground | Dewatering , weather watch, escape routes | ||||
| Fire and explosion | Workers un derground | Hot work permit, fire watch, ignition control | ||||
| Falls and plant interface | Workers, plant operators | Edge prote ction, banksman, exclusion zones | ||||
| Emergency rescue difficulty | Workers un derground | Rescue plan, rescue team and equipment on standby, c ommunicati on system |
1. 1-4 Low: manage by routine procedures.
2. 5-9 Medium: add controls where reasonably practicable and monitor.
3. 10-16 High: do not start or continue until controls reduce the risk; senior approval
needed.
4. 17-25 Extreme: stop work; redesign or eliminate the hazard.
☐ Underground work method statement and rescue plan approved
☐ Permit to enter issued and atmosphere tested before every entry
☐ Entry / exit log and head count system in place
☐ Competent supervisor and trained attendant at the entry point
☐ Emergency communication tested
☐ Workers trained in confined space entry and emergency escape
| Role | Name | Signature | Date |
|---|---|---|---|
| Prepared by | |||
| Reviewed by | |||
| Approved by |
This is a controlled document. Verify it is the current revision before use. Adapt it to local
legislation and site procedures.