Trenching & Excavation Risk Assessment template

Free Trenching & Excavation Risk Assessment template for construction you can edit online and download as PDF. Covers excavation information, soil classification and testing - osha appendix a, protective system design - osha requi

Excavation Information

ASSESSMENT ID: TRN-__________ DATE: ______________ TIME: ______________

PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________

EXCAVATION DEPTH: ______ m/ft LENGTH: ______ m/ft WIDTH: ______ m/ft

SOIL TYPE: Type A ☐ Type B ☐ Type C ☐ Stable Rock ☐ UNCONFINED COMPRESSIVE STRENGTH: ______ kPa/psf

COMPETENT PERSON: ______________ INSPECTION FREQUENCY: Daily ☐ Each shift ☐ Continuous ☐

Soil Classification And Testing - OSHA Appendix A

VISUAL TEST:

☐ Grain size (coarse vs fine) ☐ Plasticity (moist soil rolled into thread)

☐ Color/odour (organic indicators) ☐ Moisture content (dry/moist/saturated)

☐ Layering (stratification) ☐ Previously disturbed

MANUAL TESTS:

☐ Thumb penetration test:

- Type A: Can be indented by thumb with great difficulty

- Type B: Can be indented by thumb with moderate effort

- Type C: Can be easily indented by thumb

☐ Pocket penetrometer: ______ tons/ft² (tsf)

☐ Torvane shear: ______ kPa (psf)

☐ Laboratory testing: Sample #: ______ Lab: ______________ Date: ___________

CLASSIFICATION DETERMINATION:

Based on testing, soil is classified as: Type A ☐ Type B ☐ Type C ☐ Stable Rock ☐

COMPETENT PERSON SIGNATURE: ______________ DATE: ___________

Trenching & Excavation Hazard Identification And Risk Assessment

HAZARDCAUSEPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (1-5)RISK RATING (L x S)
Trench Collapse-Improper sloping
-No shoring
-Vibration from equip
-Surcharge loads
-Water saturation
-Worker burial
-Multiple fatalities
-Crush injuries
-Rescue difficulty
-Sloping/ benching per soil type
-Shoring system
-Shield (trench box)
-Daily inspections
3 (Occasional)5 (Catastrophic)15 (EXTREME)
Underground Utilities Strike-Failure to locate
-Inaccurate records
-Lack of hand digging
-Mis-marked utilities
-Electrocution
-Gas explosion
-Water main flood
-Communic- ations outage
-Injuries
-Utility locate (811)
-Hand digging within
0.9m (3ft)
-Spotter
-Utility drawings
4 (Probable)5 (Catastrophic)20 (EXTREME)
Water Ingress-Groundwater infiltration
-Surface runoff
-Rainfall
-Broken water main
-Wall instability
-Sloughing
-Flooding
-Drowning risk
-Soil softening
-Dewatering pumps
-Wellpoints
-French drains
-Surface diversion
-Sump pump
4 (Probable)3 (Major)12 (HIGH)
Atmospheric Hazards-Oxygen deficiency
-Toxic gases (H2S, CO)
-Flammable gases (CH4)
-Adjacent operations
-Asphyxiation
-Toxic poisoning
-Explosion
-Fire
-Continuous gas monitoring
-Forced air ventilation
-PPE (respiratory protection)
2 (Remote)5 (Catastrophic)10 (HIGH)
Access/Egress-No ladder
-Ladder too short
-Ladder unsecured
-Blocked exit
-Insufficient ladders
-Inability to escape quickly
-Delayed rescue
-Secondary collapse during escape
-Ladder within 7.6m (25ft) of workers
-Ladder extends
0.9m (3ft) above
-Ramp/stairs
5 (Frequent)4 (Critical)20 (EXTREME)
Equipment Contact-Equipment too close
-Operator blind spot
-No spotters
-Spoil pile too close
-Poor communication
-Struck by
-Crush injuries
-Fatality
-Trench wall vibration
-Roll-over
-Spotter
-Barricades
-Warning signs
-Equipment freez zone
-Safe distance
4 (Probable)4 (Critical)16 (EXTREME)

Protective System Design - OSHA Requirements

SLOPING/BENCHING OPTIONS (Select one):

☐ Option 1: Maximum allowable slopes per OSHA Appendix B Soil Type | Slope (H:V) | Angle (degrees) Type A | 3/4:1 | 53° Type B | 1:1 | 45° Type C | 1.5:1 | 34° Stable Rock| Vertical | 90°
☐ Option 2: Tabulated data from registered professional engineer Reference: ______________ Date: ___________ Engineer: ______________
☐ Option 3: Design by registered professional engineer Drawing #: ______________ Date: ___________ Engineer: ______________

SHORING SYSTEM OPTIONS (Select one):

☐ Timber shoring (OSHA Appendix C)
- Member sizes: ______________ - Spacing: ______ m/ft
- Installation: By competent person ☐ Engineer design ☐
☐ Aluminum hydraulic shoring (OSHA Appendix D)
- Type: ______________ - Capacity: ______ kN/m² (psf)
- Installation: Manufacturer's specs ☐ Engineer design ☐
☐ Engineered shoring system
- Drawing #: ______________ - Engineer: ______________
- Installation date: ___________ - Inspector: ______________

SHIELD SYSTEM (TRENCH BOX) OPTIONS:

Manufacturer: ______________ Model: ______________ Capacity: ______ kN/m² (psf) Maximum depth rating: ______ m/ft Width: ______ m/ft Length: ______ m/ft Certification: Current ☐ Expired ☐ Last inspection: ___________ Installation: Proper placement ☐ No gaps ☐ No over-excavation ☐

Spoil Pile And Equipment Placement

SPOIL PILE:

Distance from excavation edge: ______ m/ft (Minimum 0.6m/2ft required)

Height of spoil pile: ______ m/ft Stability assessment: Stable ☐ Unstable ☐

Material type: ______________ Will material roll back? Yes ☐ No ☐

EQUIPMENT/LOAD PLACEMENT:

Equipment type: ______________ Weight: ______ kg/lbs

Distance from excavation edge: ______ m/ft (Minimum 0.6m/2ft plus surcharge factor)

Surcharge factor applied: ______ (Type A: 0.3, Type B: 0.5, Type C: 0.8)

VIBRATION SOURCES:

☐ Construction traffic ☐ Pile driving ☐ Vibratory compactors ☐ Blasting

☐ Rail traffic ☐ Highway traffic ☐ Other: ______________

Vibration monitoring required? Yes ☐ No ☐ Method: ______________

Competent Person Daily Inspection Checklist - OSHA 29 Cfr 1926.651

COMPETENT PERSON: ______________ DATE: ______________ TIME: ______________

WEATHER CONDITIONS: ______________ TEMPERATURE: ______°C/°F LAST RAINFALL: ______________

INSPECTION ITEMSATISFACTORYDEFECT FOUNDCORRECTIVE ACTION
PRE-ENTRY INSPECTION:
1. Protective system (sloping/shoring/shield) in place and as designed
2. No evidence of water accumulation
3. No visible cracks or fissures in walls
4. No sloughing, spalling, or caving
5. No tension cracks at surface
6. Spoils, materials, equipment at safe distance
7. Adjacent structures stable/undermined?
☐ Yes
☐ N/A
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐
☐
☐
☐
________ ________ ________ ________ ________ ________ ________
ATMOSPHERIC TESTING (if required):
8. Oxygen level (19.5-23.5%) Reading: ______%
9. Flammable gas (<10% LEL) Reading: ______%LEL
10. Toxic gases (H2S, CO, etc.) Reading: ______ppm
☐ Pass
☐ Pass
☐ Pass
☐ Fail
☐ Fail
☐ Fail
_____________ _____________ _____________
ACCESS/EGRESS:
11. Ladder(s) within 7.6m (25ft) of workers
12. Ladder extends 0.9m (3ft) above excavation
13. Ladder secured against movement
14. Clear path to ladder
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐
________ ________ ________ ________
HAZARD COMMUNICATION:
15. Barricades/signs in place
16. Warning lights (if night work)
17. Exclusion zones established
☐ Yes
☐ Yes
☐ Yes
☐
☐ N/A
☐
________ ________ ________

OVERALL ASSESSMENT:

Is excavation safe for entry? Yes ☐ No ☐ If No, explain: ______________

CORRECTIVE ACTIONS TAKEN:

______________

______________

NEXT INSPECTION DUE: ______________ TIME: ______________

COMPETENT PERSON SIGNATURE: ______________

Utility Locate And Protection Plan

UTILITY NOTIFICATION:

One-call center notified: Yes ☐ No ☐ Date: ___________ Ticket #: ______________

Response received from:

☐ Electric: Marked ☐ Not marked ☐ Contact: ______________ Phone: ______________

☐ Gas: Marked ☐ Not marked ☐ Contact: ______________ Phone: ______________

☐ Water: Marked ☐ Not marked ☐ Contact: ______________ Phone: ______________

☐ Sewer: Marked ☐ Not marked ☐ Contact: ______________ Phone: ______________

☐ Telecom: Marked ☐ Not marked ☐ Contact: ______________ Phone: ______________

☐ Other: Marked ☐ Not marked ☐ Contact: ______________ Phone: ______________

EXCAVATION METHOD WITHIN UTILITY ZONE:

Within 0.9m (3ft) of marked utilities:

☐ Hand digging only ☐ Vacuum excavation ☐ Air knife ☐ Water jet

UTILITY PROTECTION MEASURES:

☐ Utility supported/suspended where exposed

☐ Backfill with sand/select material

☐ Warning tape/barrier above utility

☐ Photographs taken before backfill

EMERGENCY PROCEDURES FOR UTILITY STRIKE:

Gas strike: Evacuate immediately, call 911, notify utility

Electric strike: Stay in equipment, call utility, no approach

Water main: Evacuate, notify utility, implement dewatering

EMERGENCY CONTACTS POSTED AT SITE: Yes ☐ No ☐

Emergency Rescue Plan - Trench Collapse

RESCUE TEAM:

Team Leader: ______________ Phone: ______________

Rescue Technicians: ______________ ______________ ______________

RESCUE EQUIPMENT:

☐ Shoring materials (timber, hydraulic) Location: ______________

☐ Air monitoring equipment Location: ______________

☐ Communication equipment Location: ______________

☐ First aid/AED Location: ______________

☐ Backboard/stretcher Location: ______________

☐ Oxygen/air supply Location: ______________

☐ Vacuum/air lifting equipment Location: ______________

☐ Cutting tools (saws, torches) Location: ______________

RESCUE PROCEDURE:

1. Call 911 immediately - specify trench collapse

2. Establish command post - Site Supervisor: ______________

3. Assess scene safety - competent person to evaluate further collapse risk

4. Control hazards - stop equipment, shut off utilities

5. Initiate rescue - use trained personnel only

6. Provide medical care as soon as victim reached

7. Preserve scene for investigation

RESCUE DRILLS:

Last drill date: ______________ Participants: ______________ Findings: ______________

Next drill date: ______________ Type: Tabletop ☐ Full-scale ☐

Trenching Safety Performance Indicators

INDICATORTARGETCURRENTTRENDACTION REQUIRED
Trench collapses/incidents Utility strikes Competent person inspections completed Atmospheric testing compliance Protective system inspections Ladder access compliance Spoil pile distance compliance Near miss reports Rescue drill completion0 0 100% 100% 100% 100% 100% >2 Quarterly_______ _______ _______ _______ _______ _______ _______ _______ _______↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓________ ________ ________ ________ ________ ________ ________ ________ ________

Trenching & Excavation Action Plan

No.ACTION ITEMRESPONSIBLESTART DATEDUE DATESTATUS
1Conduct soil classification training for competent personsSafety Officer______________________☐ Not Started
☐ In Progress
☐ Completed
2Verify all utility locate requests are documentedSite Manager______________________☐ Not Started
☐ In Progress
☐ Completed
3Procure additional trench shields for deep excavationsProcurement Manager______________________☐ Not Started
☐ In Progress
☐ Completed
4Conduct trench rescue drill with site emergency response teamSafety Officer______________________☐ Not Started
☐ In Progress
☐ Completed

Approvals

ASSESSMENT PREPARED BY:

Name: ______________ Title: ______________ Date: ___________ Signature: ___________

REVIEWED BY (Competent Person):

Name: ______________ Title: ______________ Date: ___________ Signature: ___________

REVIEWED BY (Project Engineer):

Name: ______________ Title: ______________ Date: ___________ Signature: ___________

REVIEWED BY (Safety Manager):

Name: ______________ Title: ______________ Date: ___________ Signature: ___________

APPROVED BY (Project Manager):

Name: ______________ Title: ______________ Date: ___________ Signature: ___________