Free Trenching & Excavation Risk Assessment template for construction you can edit online and download as PDF. Covers excavation information, soil classification and testing - osha appendix a, protective system design - osha requi
ASSESSMENT ID: TRN-__________ DATE: ______________ TIME: ______________
PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________
EXCAVATION DEPTH: ______ m/ft LENGTH: ______ m/ft WIDTH: ______ m/ft
SOIL TYPE: Type A ☐ Type B ☐ Type C ☐ Stable Rock ☐ UNCONFINED COMPRESSIVE STRENGTH: ______ kPa/psf
COMPETENT PERSON: ______________ INSPECTION FREQUENCY: Daily ☐ Each shift ☐ Continuous ☐
VISUAL TEST:
☐ Grain size (coarse vs fine) ☐ Plasticity (moist soil rolled into thread)
☐ Color/odour (organic indicators) ☐ Moisture content (dry/moist/saturated)
☐ Layering (stratification) ☐ Previously disturbed
MANUAL TESTS:
☐ Thumb penetration test:
- Type A: Can be indented by thumb with great difficulty
- Type B: Can be indented by thumb with moderate effort
- Type C: Can be easily indented by thumb
☐ Pocket penetrometer: ______ tons/ft² (tsf)
☐ Torvane shear: ______ kPa (psf)
☐ Laboratory testing: Sample #: ______ Lab: ______________ Date: ___________
CLASSIFICATION DETERMINATION:
Based on testing, soil is classified as: Type A ☐ Type B ☐ Type C ☐ Stable Rock ☐
COMPETENT PERSON SIGNATURE: ______________ DATE: ___________
| HAZARD | CAUSE | POTENTIAL CONSEQUENCE | EXISTING CONTROLS | LIKELIHOOD (1-5) | SEVERITY (1-5) | RISK RATING (L x S) |
|---|---|---|---|---|---|---|
| Trench Collapse | -Improper sloping -No shoring -Vibration from equip -Surcharge loads -Water saturation | -Worker burial -Multiple fatalities -Crush injuries -Rescue difficulty | -Sloping/ benching per soil type -Shoring system -Shield (trench box) -Daily inspections | 3 (Occasional) | 5 (Catastrophic) | 15 (EXTREME) |
| Underground Utilities Strike | -Failure to locate -Inaccurate records -Lack of hand digging -Mis-marked utilities | -Electrocution -Gas explosion -Water main flood -Communic- ations outage -Injuries | -Utility locate (811) -Hand digging within 0.9m (3ft) -Spotter -Utility drawings | 4 (Probable) | 5 (Catastrophic) | 20 (EXTREME) |
| Water Ingress | -Groundwater infiltration -Surface runoff -Rainfall -Broken water main | -Wall instability -Sloughing -Flooding -Drowning risk -Soil softening | -Dewatering pumps -Wellpoints -French drains -Surface diversion -Sump pump | 4 (Probable) | 3 (Major) | 12 (HIGH) |
| Atmospheric Hazards | -Oxygen deficiency -Toxic gases (H2S, CO) -Flammable gases (CH4) -Adjacent operations | -Asphyxiation -Toxic poisoning -Explosion -Fire | -Continuous gas monitoring -Forced air ventilation -PPE (respiratory protection) | 2 (Remote) | 5 (Catastrophic) | 10 (HIGH) |
| Access/Egress | -No ladder -Ladder too short -Ladder unsecured -Blocked exit -Insufficient ladders | -Inability to escape quickly -Delayed rescue -Secondary collapse during escape | -Ladder within 7.6m (25ft) of workers -Ladder extends 0.9m (3ft) above -Ramp/stairs | 5 (Frequent) | 4 (Critical) | 20 (EXTREME) |
| Equipment Contact | -Equipment too close -Operator blind spot -No spotters -Spoil pile too close -Poor communication | -Struck by -Crush injuries -Fatality -Trench wall vibration -Roll-over | -Spotter -Barricades -Warning signs -Equipment freez zone -Safe distance | 4 (Probable) | 4 (Critical) | 16 (EXTREME) |
SLOPING/BENCHING OPTIONS (Select one):
| ☐ Option 1: Maximum allowable slopes per OSHA Appendix B Soil Type | Slope (H:V) | Angle (degrees) Type A | 3/4:1 | 53° Type B | 1:1 | 45° Type C | 1.5:1 | 34° Stable Rock| Vertical | 90° |
|---|
| ☐ Option 2: Tabulated data from registered professional engineer Reference: ______________ Date: ___________ Engineer: ______________ | |
|---|---|
| ☐ Option 3: Design by registered professional engineer Drawing #: ______________ Date: ___________ Engineer: ______________ |
SHORING SYSTEM OPTIONS (Select one):
| ☐ Timber shoring (OSHA Appendix C) - Member sizes: ______________ - Spacing: ______ m/ft - Installation: By competent person ☐ Engineer design ☐ | |
|---|---|
| ☐ Aluminum hydraulic shoring (OSHA Appendix D) - Type: ______________ - Capacity: ______ kN/m² (psf) - Installation: Manufacturer's specs ☐ Engineer design ☐ | |
| ☐ Engineered shoring system - Drawing #: ______________ - Engineer: ______________ - Installation date: ___________ - Inspector: ______________ |
SHIELD SYSTEM (TRENCH BOX) OPTIONS:
| Manufacturer: ______________ Model: ______________ Capacity: ______ kN/m² (psf) Maximum depth rating: ______ m/ft Width: ______ m/ft Length: ______ m/ft Certification: Current ☐ Expired ☐ Last inspection: ___________ Installation: Proper placement ☐ No gaps ☐ No over-excavation ☐ |
|---|
SPOIL PILE:
Distance from excavation edge: ______ m/ft (Minimum 0.6m/2ft required)
Height of spoil pile: ______ m/ft Stability assessment: Stable ☐ Unstable ☐
Material type: ______________ Will material roll back? Yes ☐ No ☐
EQUIPMENT/LOAD PLACEMENT:
Equipment type: ______________ Weight: ______ kg/lbs
Distance from excavation edge: ______ m/ft (Minimum 0.6m/2ft plus surcharge factor)
Surcharge factor applied: ______ (Type A: 0.3, Type B: 0.5, Type C: 0.8)
VIBRATION SOURCES:
☐ Construction traffic ☐ Pile driving ☐ Vibratory compactors ☐ Blasting
☐ Rail traffic ☐ Highway traffic ☐ Other: ______________
Vibration monitoring required? Yes ☐ No ☐ Method: ______________
COMPETENT PERSON: ______________ DATE: ______________ TIME: ______________
WEATHER CONDITIONS: ______________ TEMPERATURE: ______°C/°F LAST RAINFALL: ______________
| INSPECTION ITEM | SATISFACTORY | DEFECT FOUND | CORRECTIVE ACTION |
|---|---|---|---|
| PRE-ENTRY INSPECTION: 1. Protective system (sloping/shoring/shield) in place and as designed 2. No evidence of water accumulation 3. No visible cracks or fissures in walls 4. No sloughing, spalling, or caving 5. No tension cracks at surface 6. Spoils, materials, equipment at safe distance 7. Adjacent structures stable/undermined? | ☐ Yes ☐ N/A ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ________ ________ ________ ________ ________ ________ ________ |
| ATMOSPHERIC TESTING (if required): 8. Oxygen level (19.5-23.5%) Reading: ______% 9. Flammable gas (<10% LEL) Reading: ______%LEL 10. Toxic gases (H2S, CO, etc.) Reading: ______ppm | ☐ Pass ☐ Pass ☐ Pass | ☐ Fail ☐ Fail ☐ Fail | _____________ _____________ _____________ |
| ACCESS/EGRESS: 11. Ladder(s) within 7.6m (25ft) of workers 12. Ladder extends 0.9m (3ft) above excavation 13. Ladder secured against movement 14. Clear path to ladder | ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ | ________ ________ ________ ________ |
| HAZARD COMMUNICATION: 15. Barricades/signs in place 16. Warning lights (if night work) 17. Exclusion zones established | ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ N/A ☐ | ________ ________ ________ |
OVERALL ASSESSMENT:
Is excavation safe for entry? Yes ☐ No ☐ If No, explain: ______________
CORRECTIVE ACTIONS TAKEN:
______________
______________
NEXT INSPECTION DUE: ______________ TIME: ______________
COMPETENT PERSON SIGNATURE: ______________
UTILITY NOTIFICATION:
One-call center notified: Yes ☐ No ☐ Date: ___________ Ticket #: ______________
Response received from:
☐ Electric: Marked ☐ Not marked ☐ Contact: ______________ Phone: ______________
☐ Gas: Marked ☐ Not marked ☐ Contact: ______________ Phone: ______________
☐ Water: Marked ☐ Not marked ☐ Contact: ______________ Phone: ______________
☐ Sewer: Marked ☐ Not marked ☐ Contact: ______________ Phone: ______________
☐ Telecom: Marked ☐ Not marked ☐ Contact: ______________ Phone: ______________
☐ Other: Marked ☐ Not marked ☐ Contact: ______________ Phone: ______________
EXCAVATION METHOD WITHIN UTILITY ZONE:
Within 0.9m (3ft) of marked utilities:
☐ Hand digging only ☐ Vacuum excavation ☐ Air knife ☐ Water jet
UTILITY PROTECTION MEASURES:
☐ Utility supported/suspended where exposed
☐ Backfill with sand/select material
☐ Warning tape/barrier above utility
☐ Photographs taken before backfill
EMERGENCY PROCEDURES FOR UTILITY STRIKE:
Gas strike: Evacuate immediately, call 911, notify utility
Electric strike: Stay in equipment, call utility, no approach
Water main: Evacuate, notify utility, implement dewatering
EMERGENCY CONTACTS POSTED AT SITE: Yes ☐ No ☐
RESCUE TEAM:
Team Leader: ______________ Phone: ______________
Rescue Technicians: ______________ ______________ ______________
RESCUE EQUIPMENT:
☐ Shoring materials (timber, hydraulic) Location: ______________
☐ Air monitoring equipment Location: ______________
☐ Communication equipment Location: ______________
☐ First aid/AED Location: ______________
☐ Backboard/stretcher Location: ______________
☐ Oxygen/air supply Location: ______________
☐ Vacuum/air lifting equipment Location: ______________
☐ Cutting tools (saws, torches) Location: ______________
RESCUE PROCEDURE:
1. Call 911 immediately - specify trench collapse
2. Establish command post - Site Supervisor: ______________
3. Assess scene safety - competent person to evaluate further collapse risk
4. Control hazards - stop equipment, shut off utilities
5. Initiate rescue - use trained personnel only
6. Provide medical care as soon as victim reached
7. Preserve scene for investigation
RESCUE DRILLS:
Last drill date: ______________ Participants: ______________ Findings: ______________
Next drill date: ______________ Type: Tabletop ☐ Full-scale ☐
| INDICATOR | TARGET | CURRENT | TREND | ACTION REQUIRED |
|---|---|---|---|---|
| Trench collapses/incidents Utility strikes Competent person inspections completed Atmospheric testing compliance Protective system inspections Ladder access compliance Spoil pile distance compliance Near miss reports Rescue drill completion | 0 0 100% 100% 100% 100% 100% >2 Quarterly | _______ _______ _______ _______ _______ _______ _______ _______ _______ | ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ | ________ ________ ________ ________ ________ ________ ________ ________ ________ |
| No. | ACTION ITEM | RESPONSIBLE | START DATE | DUE DATE | STATUS |
|---|---|---|---|---|---|
| 1 | Conduct soil classification training for competent persons | Safety Officer | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 2 | Verify all utility locate requests are documented | Site Manager | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 3 | Procure additional trench shields for deep excavations | Procurement Manager | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 4 | Conduct trench rescue drill with site emergency response team | Safety Officer | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
ASSESSMENT PREPARED BY:
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
REVIEWED BY (Competent Person):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
REVIEWED BY (Project Engineer):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
REVIEWED BY (Safety Manager):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
APPROVED BY (Project Manager):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________