Traffic Management Risk Assessment template

Free Traffic Management Risk Assessment template for construction you can edit online and download as PDF. Covers mutcd - manual on uniform traffic control devices, traffic management project information, traffic control plan - mu

Mutcd - Manual On Uniform Traffic Control Devices

Traffic Management Project Information

ASSESSMENT ID: TM-__________ DATE: ______________ TIME: ______________

PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________

WORK TYPE:

☐ Road Construction ☐ Utility Work ☐ Bridge Work ☐ Paving ☐ Lane Closure ☐ Shoulder Work

☐ Intersection Work ☐ Night Work ☐ Detour ☐ Flagging ☐ Other: ______________

ROADWAY CLASSIFICATION:

☐ Interstate/Freeway ☐ Highway ☐ Arterial ☐ Collector ☐ Local Road ☐ Residential

Speed Limit: ______ mph ADT (Average Daily Traffic): ______ Peak Hours: ______ to ______

Lane Width: ______ ft Number of Lanes: ______ Shoulder Width: ______ ft

TRAFFIC CONTROL SUPERVISOR: ______________ CERT #: ______________

TRAFFIC CONTROL DESIGNER: ______________ DATE: ___________

WORK START DATE: ______________ ESTIMATED COMPLETION: ______________

Traffic Control Plan - Mutcd Compliance

TRAFFIC CONTROL PLAN (TCP):

☐ TCP prepared by qualified person: ______________ Date: ___________

☐ TCP approved by authority: ______________ Approval #: ______________

☐ TCP drawing number: ______________ Revision: ______

☐ TCP available on site

☐ TCP reviewed with all workers

TCP ELEMENTS:

☐ Work zone identified - limits defined

☐ Taper lengths calculated per MUTCD

☐ Buffer spaces adequate

☐ Lateral clearance provided

☐ Detour routes defined (if applicable)

☐ Pedestrian accommodations addressed

☐ Bicycle accommodations addressed

☐ Emergency access maintained

☐ Adjacent property access maintained

TAPER LENGTH CALCULATIONS: Taper Type ________ Merging Taper Shifting Taper Shoulder Taper Downstream TaperFormula ________ L = WS (for <45) L = 0.5WS L = 0.33WS L = 100 ft minSpeed (mph) ___________ ___________ ___________ ___________ N/ALane Width __________ ______ ft ______ ft ______ ft N/ACalculated Length ________ _________ ft _________ ft _________ ft 100 ft minActual Length ________ _________ ft _________ ft _________ ft _________ ft

where: L = taper length (ft), W = lane width (ft), S = speed (mph)

WORK ZONE COMPONENTS:

☐ Advanced Warning Area - signs placed at correct distances

☐ Transition Area - tapers correctly set up

☐ Buffer Space - clear, no equipment/workers

☐ Work Area - protected, workers separated from traffic

☐ Termination Area - "End Road Work" signs

Traffic Control Devices Inspection

SIGNS: Sign Type ________ Road Work Ahead Lane Closed Ahead Flagger Ahead Speed Limit Detour End Road Work Other: _________Quantity ________ ________ ________ ________ ________ ________ ________ ________Location ________ ________ ________ ________ ________ ________ ________ ________Condition __________ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐Reflectivity ____________ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐Placement Correct ________ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐
BARRICADES & CHANNELIZING DEVICES: Device Type ________ Cones Drums Barricades (Type I) Barricades (Type II) Barricades (Type III) Jersey Barriers Warning Lights Arrow BoardQuantity ________ ________ ________ ________ _______ ______ ________ ________ ________Location ________ ________ ________ ________ ________ ________ ________ ________ ________Condition __________ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Working ☐ Not Working Working ☐ Not WorkingReflectivity ____________ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ N/A N/A N/ASpacing Correct ________ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐

PAVEMENT MARKINGS:

☐ Temporary markings in place

☐ Existing markings removed/covered

☐ Reflectivity adequate

☐ Lane lines clearly visible

☐ Edge lines clearly visible

☐ Crosswalks marked (if applicable)

LIGHTING (for night work):

☐ Work area adequately lit - minimum 5 foot-candles

☐ Temporary lighting positioned to not glare drivers

☐ All workers wear high-visibility clothing (Class 3)

☐ Vehicle lights operational

☐ Arrow board visible from 1,000 ft

Traffic Management Hazard Identification And Risk Assessment

HAZARDCAUSEPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (1-5)RISK RATING (L x S)
Vehicle Incursion into Work Zone-Vehicle enters work zone
-Driver error
-Inadequate signage
-Poor visibility
-Speeding vehicles
-Impaired driver
-Worker fatality
-Struck-by injuries
-Multiple casualties
-Traffic control devices
-Positive protection (barriers)
-Temporary traffic barriers
-Shadow vehicle
-Spotters
4 (Probable)5 (Catastrophic)20 (EXTREME)
Worker Struck-by Vehicle-Workers near travel lanes
-No separation from traffic
-Low visibility clothing
-Backing construction vehicles
-Work at night
-Struck-by vehicle
-Fatalities
-Injuries
-High- visibility clothing (Class 3)
-Barriers separating workers from traffic
-Spotters for backing vehicles
-Work area behind barriers
4 (Probable)5 (Catastrophic)20 (EXTREME)
Flagging Operations-Ineffective flagging
-Mis- communication
-Flagger not visible
-Uncontrolled traffic
-Aggressive drivers
-Vehicle- vehicle collision
-Worker struck
-Fatalities
-Trained flaggers
-ATSSA certified
-Two- flagger system
-Radio communi- cation
-Escape routes
-Stop/slow paddles
3 (Occasional)5 (Catastrophic)15 (EXTREME)
Construction Vehicle Operations-Reversing vehicles
-Blind spots
-Poor visibility
-Multiple vehicles in work zone
-Lack of designated haul routes
-Worker struck
-Vehicle collision
-Equipment damage
-Spotter for backing vehicles
-Backup alarms
-Mirrors/ cameras
-Designated haul routes
-One-way traffic within work zone
4 (Probable)4 (Critical)16 (EXTREME)
Pedestrian Safety-Pedestrians entering work zone
-No separation from traffic
-Sidewalk closed with no detour
-Inadequate signage
-Night work with poor lighting
-Pedestrian struck by vehicle
-Injuries
-Fatalities
-Pedestrian routes designated
-Barriers separating pedestrians from traffic
-Signage directing pedestrians
-Lighting for crosswalks
3 (Occasional)4 (Critical)12 (HIGH)
Night Work Hazards-Reduced visibility
-Driver fatigue
-Glare from lights
-Poorly lit work area
-Reflective signs faded
-Worker fatigue
-Vehicle incursion
-Worker struck-by injuries
-Collisions
-Adequate lighting
-High- visibility clothing (Class 3)
-Reflective vests
-Arrow boards on all vehicles
-Reduced speed limits
4 (Probable)4 (Critical)16 (EXTREME)
Sign / Device Tampering / Theft-Stolen signs
-Vandalism
-Knocked down by vehicles
-Weather damage
-Faded reflectivity
-Confused drivers
-Vehicle incursion
-Accidents
-Daily inspection before each shift
-Secured devices
-Replacement inventory on site
3 (Occasional)3 (Major)9 (MEDIUM)
Emergency Vehicle Access-Work zone blocking access
-Narrow lanes
-No turnaround points
-Traffic backup blocking emergency vehicles
-Delayed response
-Increased incident severity
-Loss of life
-Emergency access routes maintained
-Clear path for emergency vehicles
-Turnaround areas
-Coordination with local emergency services
2 (Remote)5 (Catastrophic)10 (HIGH)

Flagging Operations - OSHA 29 Cfr 1926.201

FLAGGER INFORMATION:

Name: ______________ ATSSA Certified? Yes ☐ No ☐ Cert #: ______________

Name: ______________ ATSSA Certified? Yes ☐ No ☐ Cert #: ______________

Name: ______________ ATSSA Certified? Yes ☐ No ☐ Cert #: ______________

FLAGGER STATIONS: Station # _________ _________ _________Location ________ ________ ________Visibility __________ __________ __________Escape Route _____________ _____________ _____________Communication ________ ________ ________

FLAGGER EQUIPMENT:

☐ Stop/Slow paddle (18" minimum) - Condition: Good ☐ Replace ☐

☐ Radio communication - Channel: ______ Working? Yes ☐ No ☐

☐ High-visibility clothing (Class 3) - Condition: Good ☐ Replace ☐

☐ Hard hat (with chin strap) - Condition: Good ☐ Replace ☐

☐ Safety glasses - Condition: Good ☐ Replace ☐

☐ Work gloves - Condition: Good ☐ Replace ☐

☐ Flashlight (night work) - Condition: Good ☐ Replace ☐

☐ Whistle/air horn (emergency) - Condition: Good ☐ Replace ☐

FLAGGING PROCEDURES:

☐ Two-flaggers system used (one at each end)

☐ Flagger stations visible to approaching traffic (minimum 500 ft)

☐ Escape route identified and clear

☐ Communication established between flaggers

☐ Advance warning signs in place ("Flagger Ahead")

☐ Reduced speed limit posted

☐ Flaggers rotate positions every ______ minutes to avoid fatigue

☐ Flagger positioned singly - never in groups

☐ Flaggers never stand in travel lane

EMERGENCY PROCEDURES FOR FLAGGERS:

1. If vehicle does not stop, move to escape route

2. Warn other flaggers via radio

3. Do not pursue vehicle

4. Report incident to supervisor immediately

5. Record vehicle description and license plate if possible

Traffic Management Daily Checklist

INSPECTOR: ______________ DATE: ______________ TIME: ______________ SHIFT: Day ☐ Night ☐

WEATHER: ______________ VISIBILITY: Good ☐ Fair ☐ Poor ☐ TRAFFIC VOLUME: Light ☐ Med ☐ Heavy ☐

INSPECTION ITEMSATISFACTORYDEFECT FOUNDCORRECTIVE ACTION
PRE-WORK:
1. Traffic Control Plan reviewed with crew
2. All workers briefed on work zone layout
3. Permits/approvals on site
4. Emergency contact numbers posted
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐
________ ________ ________ ________
ADVANCE WARNING AREA:
5. "Road Work Ahead" signs in place
6. "Lane Closed Ahead" signs in place (if applicable)
7. "Flagger Ahead" signs in place (if flaggers)
8. "Reduced Speed" signs in place
9. Signs placed at correct distances
10. Signs clean and reflective
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐ N/A
☐
☐
☐
________ ________ ________ ________ ________ ________
TRANSITION AREA:
11. Taper set up correctly (length/angle)
12. Channelizing devices (cones/drums) in place
13. Device spacing correct
14. Devices clean and reflective
15. Arrow board operating and positioned correctly
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐
☐ N/A
________ ________ ________ ________ ________
BUFFER SPACE:
16. Buffer space clear of equipment/workers
17. Length adequate for speed
☐ Yes
☐ Yes
☐
☐
________ ________
WORK AREA:
18. Workers separated from traffic by barriers
19. All workers wearing high-visibility clothing
20. Work area adequately lit (night work)
21. Construction vehicles have backup alarms
22. Spotters in place for backing vehicles
23. Pedestrian routes clear and signed
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐ N/A
☐
☐ N/A
☐ N/A
________ ________ ________ ________ ________ ________
FLAGGING OPERATIONS (if applicable):
24. Flaggers in position with proper equipment
25. Flaggers visible to approaching traffic
26. Communication between flaggers working
27. Escape routes clear
28. Flaggers rotating to avoid fatigue
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ N/A
☐ N/A
☐ N/A
☐ N/A
☐ N/A
________ ________ ________ ________ ________
TERMINATION AREA:
29. "End Road Work" signs in place
30. Normal lane alignment restored
☐ Yes
☐ Yes
☐
☐
________ ________

OVERALL ASSESSMENT:

Is traffic management effective and safe? Yes ☐ No ☐ (If No, stop work and correct)

CORRECTIVE ACTIONS TAKEN:

______________

SUPERVISOR SIGNATURE: ______________ DATE: ___________

Traffic Management PPE Requirements

ALL WORKERS IN WORK ZONE:

☐ High-visibility clothing - Class 2 or 3 (based on speed)

- Class 2: Roads < 45 mph

- Class 3: Roads ≥ 45 mph, night work, inclement weather

☐ Hard hat

☐ Safety glasses

☐ Steel-toed boots

☐ Work gloves

FLAGGERS:

☐ High-visibility clothing - Class 3 (all conditions)

☐ Hard hat with chin strap

☐ Safety glasses

☐ Steel-toed boots

☐ Work gloves

☐ Stop/Slow paddle

☐ Radio communication device

☐ Whistle/air horn (emergency)

NIGHT WORK:

☐ High-visibility clothing - Class 3 with reflective tape

☐ Hard hat with reflective stripes

☐ Flashlight/headlamp

☐ Additional lighting as required

Traffic Management Emergency Response Plan

POTENTIAL EMERGENCIES:

☐ Vehicle incursion into work zone ☐ Worker struck-by ☐ Multi-vehicle collision

☐ Flagger struck ☐ Fire ☐ Hazardous material spill

☐ Medical emergency ☐ Severe weather ☐ Roadway flooding

EMERGENCY CONTACTS:

EMERGENCY: 911

Site Safety Officer: ______________ Phone: ______________

Traffic Control Supervisor: ______________ Phone: ______________

Project Manager: ______________ Phone: ______________

Local Police/Sheriff: ______________ Phone: ______________

Local Hospital: ______________ Phone: ______________

Road Authority: ______________ Phone: ______________

VEHICLE INCURSION PROCEDURES:

1. Alert all workers - shout, radio, air horn

2. Workers move to safe area/escape route

3. Call 911 - provide location, injuries

4. If safe, provide first aid to injured

5. Stop all work until area secured

6. Assess and repair damaged traffic control devices

7. Incident investigation - preserve evidence

WORKER STRUCK PROCEDURES:

1. Call 911 immediately - provide location

2. DO NOT move victim unless in immediate danger

3. Control bleeding - apply direct pressure

4. Keep victim calm and warm

5. Direct emergency responders to scene

6. Stop all work until investigation complete

FLAGGER EMERGENCY PROCEDURES:

1. If vehicle does not stop, move to escape route

2. Warn other flaggers via radio

3. Do not pursue vehicle

4. Call 911 with vehicle description and direction

5. Report incident to supervisor

TRAFFIC CONTROL DEVICE DAMAGE PROCEDURES:

1. If devices damaged, position worker with flagger to warn traffic

2. Immediately replace/repair devices

3. If unable to repair, close lane until devices restored

FIRST AID KIT LOCATION: ______________

FIRE EXTINGUISHER LOCATION: ______________

ASSEMBLY POINT: ______________

Traffic Management Training And Qualifications

TRAINING REQUIREMENTS:

All workers in work zone must be trained in:

☐ Work zone hazards

☐ Traffic control plan understanding

☐ High-visibility clothing requirements

☐ Emergency procedures

☐ Flagging procedures (if flaggers)

FLAGGER CERTIFICATION:

Name: ______________ ATSSA Certified? Yes ☐ No ☐ Expiry: ___________

Name: ______________ ATSSA Certified? Yes ☐ No ☐ Expiry: ___________

Name: ______________ ATSSA Certified? Yes ☐ No ☐ Expiry: ___________

TRAFFIC CONTROL SUPERVISOR:

Name: ______________ Experience: ______ years Training Date: ___________

Certifications: ______________

TRAINING LOG: TOPIC ________ Work Zone Safety Awareness Flagger Training Traffic Control Plan Review Emergency Procedures Night Work SafetyTRAINER ________ ________ ________ ________ ________ ________DATE ___________ ___________ ___________ ___________ ___________ ___________ATTENDEES ________ ________ ________ ________ ________ ________

Traffic Management Permit And Authorizations

PERMIT/APPROVAL TYPE ________ Lane Closure Permit Road Occupancy Permit Oversize/Overweight Night Work Approval Detour ApprovalISSUING AUTHORITY ________ ________ ________ ________ ________ ________PERMIT # _____________ _____________ _____________ _____________ _____________ _____________ISSUE DATE ___________ ___________ ___________ ___________ ___________ ___________EXPIRY DATE ___________ ___________ ___________ ___________ ___________ ___________

NOTIFICATIONS COMPLETED:

☐ Local police notified Date: ___________ Time: ___________ Contact: ______________

☐ Local fire department notified Date: ___________ Time: ___________ Contact: ______________

☐ EMS notified Date: ___________ Time: ___________ Contact: ______________

☐ Transit authority notified (if applicable) Date: ___________ Time: ___________ Contact: ______________

☐ Schools notified (if applicable) Date: ___________ Time: ___________ Contact: ______________

☐ Adjacent property owners notified Date: ___________ Method: ______________

☐ Media notification (if major impact) Date: ___________ Method: ______________

Traffic Management Risk Assessment Summary

OVERALL RISK ASSESSMENT:

Based on the identified hazards and existing controls, the overall risk level for this traffic management:

☐ LOW - Low speed, low volume, good visibility, daytime only

☐ MEDIUM - Moderate speed/volume, requires standard controls

☐ HIGH - High speed/volume, night work, complex layout, requires strict controls

☐ EXTREME - Very high risk (freeway, night, limited sight distance) - requires engineering controls

CRITICAL CONTROLS REQUIRED:

1. ______________

2. ______________

3. ______________

4. ______________

5. ______________

WORK STOPPING AUTHORITY:

All personnel have the authority and responsibility to stop work if conditions become unsafe.

Stop work conditions include:

- Inadequate traffic control setup

- Missing/damaged signs or devices

- Poor visibility (fog, rain, darkness without lights)

- Vehicle incursions

- Flagger safety compromised

Certification And Approval

TRAFFIC CONTROL SUPERVISOR:

"I have reviewed this risk assessment and confirm that the traffic control plan is correctly implemented

and all workers are trained and equipped for safe work zone operations."

Name: ______________ Signature: ______________ Date: ___________

SAFETY OFFICER:

"I have verified that all safety requirements are met and that work zone operations can proceed safely."

Name: ______________ Signature: ______________ Date: ___________

PROJECT MANAGER:

"I approve the traffic management plan and risk assessment."

Name: ______________ Signature: ______________ Date: ___________

NEXT REVIEW DATE: ______________

More templates