Temporary Works Risk Assessment template

Free Temporary Works Risk Assessment template for construction you can edit online and download as PDF. Covers osha 29 cfr 1926 subpart p - excavations, temporary works project information, temporary works design and procedures -

OSHA 29 Cfr 1926 Subpart P - Excavations

Temporary Works Project Information

ASSESSMENT ID: TW-__________ DATE: ______________ TIME: ______________

PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________

TEMPORARY WORKS TYPE:

☐ Falsework/Formwork ☐ Shoring (Excavation Support) ☐ Scaffolding ☐ Cofferdams

☐ Temporary Bracing ☐ Temporary Roads/Pavements ☐ Crane Foundations ☐ Working Platforms

☐ Sheet Piling ☐ Trench Boxes/Shields ☐ Underpinning ☐ Other: ______________

TEMPORARY WORKS DETAILS:

Description: ______________

Dimensions: ______ x ______ x ______ Design Load: ______ kN (lbs)

Design Life: ______ days/weeks Maximum Height/Depth: ______ m (ft)

TEMPORARY WORKS COORDINATOR (TWC): ______________ Date: ___________

TEMPORARY WORKS SUPERVISOR (TWS): ______________ Date: ___________

DESIGNER: ______________ CHECKER: ______________ Date: ___________

Temporary Works Design And Procedures - Bs 5975

DESIGN RESPONSIBILITIES:

☐ Temporary works designed by competent person: ______________

☐ Design brief prepared and approved

☐ Design calculations available: Ref #: ______________

☐ Design drawings available: Drawing #: ______________

☐ Design checked independently: ______________ Date: ___________

☐ Design approved for construction: ______________ Date: ___________

DESIGN CRITERIA:

Loads Considered:

☐ Dead loads (self-weight) ☐ Live loads (construction) ☐ Wind loads

☐ Hydrostatic pressure (if applicable) ☐ Earth pressure ☐ Vibration loads

☐ Impact loads ☐ Temperature effects ☐ Seismic loads

☐ Other: ______________

Design Codes/Standards Used:

1. ______________

2. ______________

3. ______________

DESIGN CHECK CERTIFICATION:

"I certify that this temporary works design has been checked and meets all applicable standards."

Checker: ______________ Date: ___________ Signature: ___________

TEMPORARY WORKS PROCEDURES:

☐ Temporary works register maintained

☐ Design risk assessment completed

☐ Construction sequence defined

☐ Inspection and test plan (ITP) prepared

☐ Removal sequence defined

☐ Emergency procedures defined

Temporary Works - Falsework/Formwork

FALSEWORK COMPONENTS: Component ________ Props/Shoring Primary Beams Secondary Beams Plywood/Forms Bracing Sole PlatesMaterial ________ ________ ________ ________ ________ ________ ________Size _________ _________ _________ _________ _________ _________ _________Capacity __________ ______ kN ______ kN ______ kN ______ kPa ______ kN ______ kPaInspection Date ________ ________ ________ ________ ________ ________ ________Condition __________ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐

FOUNDATION/SUPPORT:

☐ Ground bearing capacity verified: ______ kPa (psf) Required: ______ kPa (psf) OK? Yes ☐ No ☐

☐ Concrete blinding/slab adequate

☐ Sole plates/mud sills sized correctly

☐ Base jacks adjusted and secured

☐ Drainage adequate - no water undermining

STABILITY CHECKS:

☐ Falsework plumb and level

☐ All connections secure

☐ Bracing installed per design (plan/section)

☐ No missing components

☐ No damaged/warped materials

☐ Spacing of props/shoring per design: ______ mm (in)

☐ Eccentric loads avoided

FORMWORK:

☐ Form panels aligned and plumb

☐ Form joints sealed - no grout loss

☐ Form ties installed - spacing: ______ mm (in)

☐ Release agent applied

☐ Clean-out doors provided

☐ No debris inside forms

☐ Inserts/embeds positioned correctly

ACCESS FOR CONCRETE PLACEMENT:

☐ Working platforms provided

☐ Guardrails in place where > 2m (6ft)

☐ Access ladders/stairs safe

☐ Pouring points accessible

Temporary Works - Excavation Shoring / Support

SHORING SYSTEM TYPE:

☐ Trench Box/Shield ☐ Sheet Piling ☐ Soldier Piles & Lagging ☐ Slide Rail

☐ Hydraulic Shoring ☐ Timber Shoring ☐ Secant Pile Wall ☐ Diaphragm Wall

☐ Soil Nailing ☐ Tie-backs ☐ Rakers ☐ Other: ______________

DESIGN PARAMETERS:

Excavation Depth: ______ m (ft) Width: ______ m (ft) Length: ______ m (ft)

Soil Type: ______________ Soil Unit Weight: ______ kN/m³ (pcf)

Active Earth Pressure: ______ kPa (psf) Water Pressure: ______ kPa (psf)

Surcharge Loads: ______ kPa (psf) Factor of Safety: ______

SHORING COMPONENTS: Component ________ Soldier Piles Lagging Wales Struts/Rakers Tie-backsMaterial ________ ________ ________ ________ ________ ________Size _________ _________ _________ _________ _________ _________Capacity __________ ______ kN ______ kPa ______ kN ______ kN ______ kNInspection Date ________ ________ ________ ________ ________ ________Condition __________ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐

INSTALLATION CHECKS:

☐ Shoring installed to design depth

☐ No over-excavation below shoring

☐ Connections secure - all bolts tight

☐ Lagging placed tightly against soil

☐ No voids behind lagging

☐ Water control adequate (pumps/sumps)

☐ Settlement monitoring points installed

☐ Adjacent structures monitored

DAILY INSPECTION (COMPETENT PERSON): Date ________ ________ ________Time ______ ______ ______Conditions __________ __________ __________Observations ____________ ____________ ____________Defects _______ _______ _______Corrective Action ________ ________ ________Inspector __________ __________ __________

Temporary Works - Cofferdams / Dewatering

COFFERDAM TYPE:

☐ Braced ☐ Cellular (sheet pile) ☐ Earthfill ☐ Concrete

☐ Double-walled ☐ Portable ☐ Other: ______________

DESIGN PARAMETERS:

Water Depth: ______ m (ft) Design Water Level: ______ m (ft)

Wave Height: ______ m (ft) Current Velocity: ______ m/s (ft/s)

Scour Potential: Low ☐ Medium ☐ High ☐

DEWATERING SYSTEM:

☐ Wellpoints ☐ Deep Wells ☐ Sump Pumps ☐ Eductor System

Pump Type: ______________ Capacity: ______ L/min (gpm) Number: ______

Standby Pumps Available? Yes ☐ No ☐ Automatic Start? Yes ☐ No ☐

Discharge Location: ______________ Erosion Control? Yes ☐ No ☐

STABILITY CHECKS:

☐ Cofferdam adequately braced

☐ No excessive seepage/leaks

☐ Scour protection in place

☐ Settlement monitoring - no unusual movement

☐ Water level maintained below excavation

☐ Pumping systems operational - tested daily

☐ Emergency power available

EMERGENCY PROCEDURES (FLOODING):

1. Evacuate cofferdam immediately

2. Activate additional pumps

3. Notify project management

4. Monitor for stability issues

5. Do not re-enter until water level controlled

Temporary Works - Crane Foundations / Working Platforms

PLATFORM TYPE:

☐ Crane Hardstanding ☐ Piled Platform ☐ Mat Foundation ☐ Timber Mat

☐ Concrete Slab ☐ Compacted Fill ☐ Other: ______________

DESIGN PARAMETERS:

Crane Type: ______________ Max Load: ______ tonnes Track/Crawler Pressure: ______ kPa (psf)

Outrigger Load: ______ kN (lbs) Outrigger Pad Size: ______ x ______ mm (in)

Required Bearing Capacity: ______ kPa (psf) Achieved: ______ kPa (psf) OK? Yes ☐ No ☐

PLATFORM CONSTRUCTION:

☐ Subgrade prepared and compacted

☐ Geotextile separator installed (if required)

☐ Granular fill placed in layers

☐ Compaction testing completed: ______% Required: ______%

☐ Platform level: ± ______ mm (in)

☐ Edges protected/defined

☐ Drainage provided - no ponding

CRANE SETUP CHECKS:

☐ Platform inspected before crane setup

☐ Outrigger pads sized correctly - no punching

☐ No soft spots or settlement under load

☐ Platform remains stable during operation

☐ Daily inspection of platform condition

PLATFORM INSPECTION LOG: Date ________ ________Time ______ ______Crane ________ ________Observations ____________ ____________Settlement __________ __________Action Taken _____________ _____________Inspector __________ __________

Temporary Works Hazard Identification And Risk Assessment

HAZARDCAUSEPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (1-5)RISK RATING (L x S)
Falsework/ Formwork Collapse-Inadequate design
-Insufficient bracing
-Premature striking
-Overloading
-Vibration
-Settlement of supports
-Multiple fatalities
-Crush injuries
-Concrete loss
-Equipment damage
-Schedule delays
-Design by qualified engineer
-Independent design check
-Inspection prior to pour
-Pour rate limits
2 (Remote)5 (Catastrophic)10 (HIGH)
Shoring / Excavation Support Failure-Over- excavation below shoring
-Inadequate shoring design
-Missing components
-Water infiltration
-Surcharge loads
-Cave-in
-Burial
-Worker fatalities
-Structural damage to adjacent buildings
-Utility damage
-Designed shoring system
-Competent person daily inspections
-No over- excavation
-Monitoring
-Water control
3 (Occasional)5 (Catastrophic)15 (EXTREME)
Cofferdam Failure / Flooding-Over- topping by water
-Seepage/ piping
-Structural failure
-Scour
-Wave action
-Flooding
-Drowning
-Worker fatalities
-Excavation collapse
-Equipment damage
-Project delays
-Designed for water levels
-Freeboard adequate
-Pumping systems
-Standby pumps
-Monitoring
2 (Remote)5 (Catastrophic)10 (HIGH)
Crane Platform Failure-Inadequate bearing capacity
-Settlement under load
-Soft spots
-Poor drainage
-Frost heave
-Crane tip-over
-Crush injuries
-Fatalities
-Equipment damage
-Project delays
-Designed platform
-Bearing capacity verified
-Outrigger pads
-Matting
-Daily inspection
3 (Occasional)5 (Catastrophic)15 (EXTREME)
Temporary Bracing Failure (Steel Erection)-Inadequate bracing for stability
-Missing connections
-Premature removal
-Wind loading during erection
-Collapse
-Progressive failure
-Structural instability
-Worker injuries
-Fatalities
-Design calculation
-Proper sequence of installation
-Inspection before releasing crane
3 (Occasional)4 (Critical)12 (HIGH)
Working Platforms / Access-Inadequate guardrails
-Unsafe access
-Overloading
-Poor construction
-Damaged components
-Fall from height
-Crush injuries
-Collapse
-Equipment damage
-Guardrails installed
-PFAS
-Safe access
-Load capacity signs
-Inspection
4 (Probable)4 (Critical)16 (EXTREME)
Temporary Road / Pavement Failure-Design not suited for traffic
-Poor construction
-Subgrade failure
-Water damage
-Frost heave
-Worker injury
-Vehicle damage
-Traffic delays
-Design by competent person
-Traffic management plan
-Speed limits
-Regular maintenance
2 (Remote)4 (Critical)8 (MEDIUM)

Temporary Works Inspection And Test Plan

HOLD POINTS AND INSPECTIONS:

STAGE ________ Design Complete Materials Delivered Foundation/Subgrade Prep Installation - Stage 1 Installation - Stage 2 Installation Complete Pre-Use During Use - Daily Post-Use / RemovalINSPECTION REQUIRED ________ Design check completed Material inspection Bearing capacity test Inspection of components Inspection of components Final inspection Pre-use check Daily inspection Removal inspectionINSPECTOR ____________ Designer TWS Geotech TWS TWS TWC Operator Competent Person TWSRECORD ___________ Calc # Report # Test # Form # Form # Form # Log Log Form #STATUS ___________ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐
TESTING REQUIREMENTS: Test Type ________ Concrete strength (if) Compaction testing Bearing capacity test Weld inspection Bolt torque check Load test (if required)Frequency ________ Each pour Every ______ m² Each platform Each connection 10% of connections As specifiedAcceptance Criteria ________ ______ MPa (psi) ______% ______ kPa (psf) Visual/UT Manufacturer spec No failure/deflectionResponsible ________ ________ ________ ________ ________ ________ ________

Temporary Works Daily Inspection Checklist

INSPECTOR: ______________ DATE: ______________ TIME: ______________

TW LOCATION/ID: ______________ TW TYPE: ______________

INSPECTION ITEMSATISFACTORYDEFECT FOUNDCORRECTIVE ACTION
GENERAL:
1. TW matches design drawings
2. No visible damage/distress
3. All components present and correctly installed
4. Connections secure - no loose bolts/fasteners
5. No missing components
6. No unauthorized modifications
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐
☐
☐
________ ________ ________ ________ ________ ________
FOUNDATION/GROUND:
7. No settlement observed
8. No water undermining/erosion
9. Drainage adequate - no ponding
10. Base plates/sills on firm ground
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐
________ ________ ________ ________
STABILITY:
11. TW plumb/level (within tolerance)
12. Bracing in place and secure
13. No unusual movement/vibration
14. Ties/anchors secure (if applicable)
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐ N/A
________ ________ ________ ________
LOADS:
15. Loads within design capacity
16. No overloading - materials stored properly
17. No impact loading on TW
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
________ ________ ________
FALL PROTECTION (if applicable):
18. Guardrails in place and secure
19. Toeboards installed
20. Access ladders/stairs safe
21. Fall arrest equipment available (if required)
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ N/A
☐ N/A
☐ N/A
☐ N/A
________ ________ ________ ________
MONITORING:
22. Monitoring points read (if applicable)
23. No unusual readings/trends
24. Adjacent structures/ground stable
☐ Yes
☐ Yes
☐ Yes
☐ N/A
☐ N/A
☐
Reading: ______ ________ ________

OVERALL ASSESSMENT:

Is temporary works safe for continued use? Yes ☐ No ☐ (If No, stop work immediately)

CORRECTIVE ACTIONS TAKEN:

______________

INSPECTOR SIGNATURE: ______________ DATE: ___________

Temporary Works Removal Procedure

REMOVAL AUTHORIZATION:

☐ Permanent works completed and achieved required strength

☐ Engineer confirmation received: Date: ___________ By: ______________

☐ Removal procedure reviewed with crew

☐ Removal sequence defined

☐ Fall protection during removal addressed

☐ Exclusion zone established below

REMOVAL SEQUENCE:

Step 1: ______________

Step 2: ______________

Step 3: ______________

Step 4: ______________

Step 5: ______________

CRITICAL CONSIDERATIONS:

☐ Remove in reverse order of installation

☐ Never remove supporting elements prematurely

☐ Do not overload permanent structure during removal

☐ Lower materials - do not drop

☐ Inspect components during removal for re-use

REMOVAL COMPLETION:

Date Removed: ___________ By: ______________ Verified By: ______________

Components Stored: Location: ______________ Condition for Re-use: Good ☐ Reject ☐

Temporary Works Register

TW ID _____ _____ _____ _____ _____ _____Description ________ ________ ________ ________ ________ ________Location ________ ________ ________ ________ ________ ________Designer ________ ________ ________ ________ ________ ________Date Designed _____________ _____________ _____________ _____________ _____________ _____________Date Built ___________ ___________ ___________ ___________ ___________ ___________Status ______ ______ ______ ______ ______ ______Next Inspection ________ ________ ________ ________ ________ ________

Temporary Works PPE Requirements

BASE PPE (ALL TEMPORARY WORKS):

☐ Hard hat

☐ Safety glasses with side shields

☐ High-visibility vest (as required)

☐ Steel-toed boots

☐ Work gloves

TASK-SPECIFIC PPE:

FALSEWORK/FORMWORK:

☐ Leather gloves ☐ Safety glasses ☐ Hearing protection (if using power tools)

SHORING/EXCAVATION:

☐ Rubber boots (if water present) ☐ Hard hat with chin strap ☐ High-visibility vest

COFFERDAM/DEWATERING:

☐ Life jacket (if over water) ☐ Rubber boots ☐ Rain gear ☐ Retrieval harness

WORKING AT HEIGHT:

☐ Full body harness ☐ Lanyard/SRL ☐ Hard hat with chin strap

Temporary Works Emergency Response Plan

POTENTIAL EMERGENCIES:

☐ Collapse/failure ☐ Flooding/inundation ☐ Cave-in ☐ Fire

☐ Structural instability ☐ Equipment impact ☐ Fall from height ☐ Medical emergency

EMERGENCY CONTACTS:

EMERGENCY: 911

Site Safety Officer: ______________ Phone: ______________

Temporary Works Coordinator: ______________ Phone: ______________

Project Manager: ______________ Phone: ______________

Design Engineer: ______________ Phone: ______________

Nearest Hospital: ______________ Phone: ______________

COLLAPSE/FAILURE PROCEDURES:

1. Evacuate area immediately - sound alarm

2. Account for all personnel - check for missing

3. Call 911 if injuries - advise "structural collapse"

4. DO NOT re-enter - secondary collapse risk

5. Secure perimeter - prevent unauthorized access

6. Contact designer/engineer immediately

7. Preserve scene for investigation

FLOODING/INUNDATION PROCEDURES:

1. Evacuate cofferdam/excavation immediately

2. Activate additional pumping

3. Account for all personnel

4. Notify project management

5. Monitor for stability issues

6. Do not re-enter until water level controlled and structure inspected

EVACUATION ROUTES:

Primary: ______________

Secondary: ______________

Assembly Point: ______________

Temporary Works Training And Competency

ROLES AND RESPONSIBILITIES:

TEMPORARY WORKS COORDINATOR (TWC):

Name: ______________ Experience: ______ years Training Date: ___________

Responsibilities:

☐ Overall management of temporary works

☐ Ensure design and checking completed

☐ Maintain temporary works register

☐ Coordinate inspections

☐ Control changes/modifications

☐ Authorize removal

TEMPORARY WORKS SUPERVISOR (TWS):

Name: ______________ Experience: ______ years Training Date: ___________

Responsibilities:

☐ Supervise installation

☐ Conduct inspections

☐ Ensure compliance with design

☐ Report defects/incidents

☐ Stop work if unsafe

COMPETENT PERSON (for excavation shoring):

Name: ______________ Experience: ______ years Training Date: ___________

Responsibilities:

☐ Daily inspections of excavations

☐ Identify and correct hazards

☐ Classify soil

☐ Ensure protective systems adequate

TRAINING LOG: TOPIC ________ Temporary Works Awareness Falsework/Formwork Safety Excavation Safety (Competent Person) Cofferdam Safety Inspection ProceduresTRAINER ________ ________ ________ ________ ________ ________DATE ___________ ___________ ___________ ___________ ___________ ___________ATTENDEES ________ ________ ________ ________ ________ ________

Temporary Works Risk Assessment Summary

OVERALL RISK ASSESSMENT:

Based on the identified hazards and existing controls, the overall risk level for this temporary works:

☐ LOW - Simple, standard design, low consequence of failure

☐ MEDIUM - Moderate complexity, requires competent oversight

☐ HIGH - Complex design, significant consequence of failure, requires strict controls

☐ EXTREME - Critical temporary works, high consequence of failure, requires independent checking

CRITICAL CONTROLS REQUIRED:

1. ______________

2. ______________

3. ______________

4. ______________

5. ______________

DESIGN CATEGORY:

☐ Category 0 - Standard/simple design (e.g., standard scaffolding)

☐ Category 1 - Simple bespoke design (e.g., basic falsework)

☐ Category 2 - Complex design requiring specialist engineer (e.g., cofferdams, deep shoring)

☐ Category 3 - Very complex/high risk requiring independent design check

WORK STOPPING AUTHORITY:

All personnel have the authority and responsibility to stop work if conditions become unsafe.

Stop work conditions include:

- Visible distress/damage to temporary works

- Unexpected settlement/movement

- Missing components

- Overloading

- Water ingress/erosion

Certification And Approval

DESIGNER:

"I certify that this temporary works design meets all applicable standards and is suitable for the intended

purpose."

Name: ______________ Signature: ______________ Date: ___________

DESIGN CHECKER:

"I have independently checked this design and confirm it is correct."

Name: ______________ Signature: ______________ Date: ___________

TEMPORARY WORKS COORDINATOR:

"I confirm that the temporary works have been installed in accordance with the design and are safe for use."

Name: ______________ Signature: ______________ Date: ___________

PROJECT MANAGER:

"I approve the use of these temporary works."

Name: ______________ Signature: ______________ Date: ___________

NEXT REVIEW DATE: ______________