Free Temporary Works Risk Assessment template for construction you can edit online and download as PDF. Covers osha 29 cfr 1926 subpart p - excavations, temporary works project information, temporary works design and procedures -
ASSESSMENT ID: TW-__________ DATE: ______________ TIME: ______________
PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________
TEMPORARY WORKS TYPE:
☐ Falsework/Formwork ☐ Shoring (Excavation Support) ☐ Scaffolding ☐ Cofferdams
☐ Temporary Bracing ☐ Temporary Roads/Pavements ☐ Crane Foundations ☐ Working Platforms
☐ Sheet Piling ☐ Trench Boxes/Shields ☐ Underpinning ☐ Other: ______________
TEMPORARY WORKS DETAILS:
Description: ______________
Dimensions: ______ x ______ x ______ Design Load: ______ kN (lbs)
Design Life: ______ days/weeks Maximum Height/Depth: ______ m (ft)
TEMPORARY WORKS COORDINATOR (TWC): ______________ Date: ___________
TEMPORARY WORKS SUPERVISOR (TWS): ______________ Date: ___________
DESIGNER: ______________ CHECKER: ______________ Date: ___________
DESIGN RESPONSIBILITIES:
☐ Temporary works designed by competent person: ______________
☐ Design brief prepared and approved
☐ Design calculations available: Ref #: ______________
☐ Design drawings available: Drawing #: ______________
☐ Design checked independently: ______________ Date: ___________
☐ Design approved for construction: ______________ Date: ___________
DESIGN CRITERIA:
Loads Considered:
☐ Dead loads (self-weight) ☐ Live loads (construction) ☐ Wind loads
☐ Hydrostatic pressure (if applicable) ☐ Earth pressure ☐ Vibration loads
☐ Impact loads ☐ Temperature effects ☐ Seismic loads
☐ Other: ______________
Design Codes/Standards Used:
1. ______________
2. ______________
3. ______________
DESIGN CHECK CERTIFICATION:
"I certify that this temporary works design has been checked and meets all applicable standards."
Checker: ______________ Date: ___________ Signature: ___________
TEMPORARY WORKS PROCEDURES:
☐ Temporary works register maintained
☐ Design risk assessment completed
☐ Construction sequence defined
☐ Inspection and test plan (ITP) prepared
☐ Removal sequence defined
☐ Emergency procedures defined
| FALSEWORK COMPONENTS: Component ________ Props/Shoring Primary Beams Secondary Beams Plywood/Forms Bracing Sole Plates | Material ________ ________ ________ ________ ________ ________ ________ | Size _________ _________ _________ _________ _________ _________ _________ | Capacity __________ ______ kN ______ kN ______ kN ______ kPa ______ kN ______ kPa | Inspection Date ________ ________ ________ ________ ________ ________ ________ | Condition __________ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ |
|---|
FOUNDATION/SUPPORT:
☐ Ground bearing capacity verified: ______ kPa (psf) Required: ______ kPa (psf) OK? Yes ☐ No ☐
☐ Concrete blinding/slab adequate
☐ Sole plates/mud sills sized correctly
☐ Base jacks adjusted and secured
☐ Drainage adequate - no water undermining
STABILITY CHECKS:
☐ Falsework plumb and level
☐ All connections secure
☐ Bracing installed per design (plan/section)
☐ No missing components
☐ No damaged/warped materials
☐ Spacing of props/shoring per design: ______ mm (in)
☐ Eccentric loads avoided
FORMWORK:
☐ Form panels aligned and plumb
☐ Form joints sealed - no grout loss
☐ Form ties installed - spacing: ______ mm (in)
☐ Release agent applied
☐ Clean-out doors provided
☐ No debris inside forms
☐ Inserts/embeds positioned correctly
ACCESS FOR CONCRETE PLACEMENT:
☐ Working platforms provided
☐ Guardrails in place where > 2m (6ft)
☐ Access ladders/stairs safe
☐ Pouring points accessible
SHORING SYSTEM TYPE:
☐ Trench Box/Shield ☐ Sheet Piling ☐ Soldier Piles & Lagging ☐ Slide Rail
☐ Hydraulic Shoring ☐ Timber Shoring ☐ Secant Pile Wall ☐ Diaphragm Wall
☐ Soil Nailing ☐ Tie-backs ☐ Rakers ☐ Other: ______________
DESIGN PARAMETERS:
Excavation Depth: ______ m (ft) Width: ______ m (ft) Length: ______ m (ft)
Soil Type: ______________ Soil Unit Weight: ______ kN/m³ (pcf)
Active Earth Pressure: ______ kPa (psf) Water Pressure: ______ kPa (psf)
Surcharge Loads: ______ kPa (psf) Factor of Safety: ______
| SHORING COMPONENTS: Component ________ Soldier Piles Lagging Wales Struts/Rakers Tie-backs | Material ________ ________ ________ ________ ________ ________ | Size _________ _________ _________ _________ _________ _________ | Capacity __________ ______ kN ______ kPa ______ kN ______ kN ______ kN | Inspection Date ________ ________ ________ ________ ________ ________ | Condition __________ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ |
|---|
INSTALLATION CHECKS:
☐ Shoring installed to design depth
☐ No over-excavation below shoring
☐ Connections secure - all bolts tight
☐ Lagging placed tightly against soil
☐ No voids behind lagging
☐ Water control adequate (pumps/sumps)
☐ Settlement monitoring points installed
☐ Adjacent structures monitored
| DAILY INSPECTION (COMPETENT PERSON): Date ________ ________ ________ | Time ______ ______ ______ | Conditions __________ __________ __________ | Observations ____________ ____________ ____________ | Defects _______ _______ _______ | Corrective Action ________ ________ ________ | Inspector __________ __________ __________ |
|---|
COFFERDAM TYPE:
☐ Braced ☐ Cellular (sheet pile) ☐ Earthfill ☐ Concrete
☐ Double-walled ☐ Portable ☐ Other: ______________
DESIGN PARAMETERS:
Water Depth: ______ m (ft) Design Water Level: ______ m (ft)
Wave Height: ______ m (ft) Current Velocity: ______ m/s (ft/s)
Scour Potential: Low ☐ Medium ☐ High ☐
DEWATERING SYSTEM:
☐ Wellpoints ☐ Deep Wells ☐ Sump Pumps ☐ Eductor System
Pump Type: ______________ Capacity: ______ L/min (gpm) Number: ______
Standby Pumps Available? Yes ☐ No ☐ Automatic Start? Yes ☐ No ☐
Discharge Location: ______________ Erosion Control? Yes ☐ No ☐
STABILITY CHECKS:
☐ Cofferdam adequately braced
☐ No excessive seepage/leaks
☐ Scour protection in place
☐ Settlement monitoring - no unusual movement
☐ Water level maintained below excavation
☐ Pumping systems operational - tested daily
☐ Emergency power available
EMERGENCY PROCEDURES (FLOODING):
1. Evacuate cofferdam immediately
2. Activate additional pumps
3. Notify project management
4. Monitor for stability issues
5. Do not re-enter until water level controlled
PLATFORM TYPE:
☐ Crane Hardstanding ☐ Piled Platform ☐ Mat Foundation ☐ Timber Mat
☐ Concrete Slab ☐ Compacted Fill ☐ Other: ______________
DESIGN PARAMETERS:
Crane Type: ______________ Max Load: ______ tonnes Track/Crawler Pressure: ______ kPa (psf)
Outrigger Load: ______ kN (lbs) Outrigger Pad Size: ______ x ______ mm (in)
Required Bearing Capacity: ______ kPa (psf) Achieved: ______ kPa (psf) OK? Yes ☐ No ☐
PLATFORM CONSTRUCTION:
☐ Subgrade prepared and compacted
☐ Geotextile separator installed (if required)
☐ Granular fill placed in layers
☐ Compaction testing completed: ______% Required: ______%
☐ Platform level: ± ______ mm (in)
☐ Edges protected/defined
☐ Drainage provided - no ponding
CRANE SETUP CHECKS:
☐ Platform inspected before crane setup
☐ Outrigger pads sized correctly - no punching
☐ No soft spots or settlement under load
☐ Platform remains stable during operation
☐ Daily inspection of platform condition
| PLATFORM INSPECTION LOG: Date ________ ________ | Time ______ ______ | Crane ________ ________ | Observations ____________ ____________ | Settlement __________ __________ | Action Taken _____________ _____________ | Inspector __________ __________ |
|---|
| HAZARD | CAUSE | POTENTIAL CONSEQUENCE | EXISTING CONTROLS | LIKELIHOOD (1-5) | SEVERITY (1-5) | RISK RATING (L x S) |
|---|---|---|---|---|---|---|
| Falsework/ Formwork Collapse | -Inadequate design -Insufficient bracing -Premature striking -Overloading -Vibration -Settlement of supports | -Multiple fatalities -Crush injuries -Concrete loss -Equipment damage -Schedule delays | -Design by qualified engineer -Independent design check -Inspection prior to pour -Pour rate limits | 2 (Remote) | 5 (Catastrophic) | 10 (HIGH) |
| Shoring / Excavation Support Failure | -Over- excavation below shoring -Inadequate shoring design -Missing components -Water infiltration -Surcharge loads | -Cave-in -Burial -Worker fatalities -Structural damage to adjacent buildings -Utility damage | -Designed shoring system -Competent person daily inspections -No over- excavation -Monitoring -Water control | 3 (Occasional) | 5 (Catastrophic) | 15 (EXTREME) |
| Cofferdam Failure / Flooding | -Over- topping by water -Seepage/ piping -Structural failure -Scour -Wave action | -Flooding -Drowning -Worker fatalities -Excavation collapse -Equipment damage -Project delays | -Designed for water levels -Freeboard adequate -Pumping systems -Standby pumps -Monitoring | 2 (Remote) | 5 (Catastrophic) | 10 (HIGH) |
| Crane Platform Failure | -Inadequate bearing capacity -Settlement under load -Soft spots -Poor drainage -Frost heave | -Crane tip-over -Crush injuries -Fatalities -Equipment damage -Project delays | -Designed platform -Bearing capacity verified -Outrigger pads -Matting -Daily inspection | 3 (Occasional) | 5 (Catastrophic) | 15 (EXTREME) |
| Temporary Bracing Failure (Steel Erection) | -Inadequate bracing for stability -Missing connections -Premature removal -Wind loading during erection | -Collapse -Progressive failure -Structural instability -Worker injuries -Fatalities | -Design calculation -Proper sequence of installation -Inspection before releasing crane | 3 (Occasional) | 4 (Critical) | 12 (HIGH) |
| Working Platforms / Access | -Inadequate guardrails -Unsafe access -Overloading -Poor construction -Damaged components | -Fall from height -Crush injuries -Collapse -Equipment damage | -Guardrails installed -PFAS -Safe access -Load capacity signs -Inspection | 4 (Probable) | 4 (Critical) | 16 (EXTREME) |
| Temporary Road / Pavement Failure | -Design not suited for traffic -Poor construction -Subgrade failure -Water damage -Frost heave | -Worker injury -Vehicle damage -Traffic delays | -Design by competent person -Traffic management plan -Speed limits -Regular maintenance | 2 (Remote) | 4 (Critical) | 8 (MEDIUM) |
HOLD POINTS AND INSPECTIONS:
| STAGE ________ Design Complete Materials Delivered Foundation/Subgrade Prep Installation - Stage 1 Installation - Stage 2 Installation Complete Pre-Use During Use - Daily Post-Use / Removal | INSPECTION REQUIRED ________ Design check completed Material inspection Bearing capacity test Inspection of components Inspection of components Final inspection Pre-use check Daily inspection Removal inspection | INSPECTOR ____________ Designer TWS Geotech TWS TWS TWC Operator Competent Person TWS | RECORD ___________ Calc # Report # Test # Form # Form # Form # Log Log Form # | STATUS ___________ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐ Complete ☐ Pending ☐ |
|---|
| TESTING REQUIREMENTS: Test Type ________ Concrete strength (if) Compaction testing Bearing capacity test Weld inspection Bolt torque check Load test (if required) | Frequency ________ Each pour Every ______ m² Each platform Each connection 10% of connections As specified | Acceptance Criteria ________ ______ MPa (psi) ______% ______ kPa (psf) Visual/UT Manufacturer spec No failure/deflection | Responsible ________ ________ ________ ________ ________ ________ ________ |
|---|
INSPECTOR: ______________ DATE: ______________ TIME: ______________
TW LOCATION/ID: ______________ TW TYPE: ______________
| INSPECTION ITEM | SATISFACTORY | DEFECT FOUND | CORRECTIVE ACTION |
|---|---|---|---|
| GENERAL: 1. TW matches design drawings 2. No visible damage/distress 3. All components present and correctly installed 4. Connections secure - no loose bolts/fasteners 5. No missing components 6. No unauthorized modifications | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ ☐ ☐ | ________ ________ ________ ________ ________ ________ |
| FOUNDATION/GROUND: 7. No settlement observed 8. No water undermining/erosion 9. Drainage adequate - no ponding 10. Base plates/sills on firm ground | ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ | ________ ________ ________ ________ |
| STABILITY: 11. TW plumb/level (within tolerance) 12. Bracing in place and secure 13. No unusual movement/vibration 14. Ties/anchors secure (if applicable) | ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ N/A | ________ ________ ________ ________ |
| LOADS: 15. Loads within design capacity 16. No overloading - materials stored properly 17. No impact loading on TW | ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ | ________ ________ ________ |
| FALL PROTECTION (if applicable): 18. Guardrails in place and secure 19. Toeboards installed 20. Access ladders/stairs safe 21. Fall arrest equipment available (if required) | ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ N/A ☐ N/A ☐ N/A ☐ N/A | ________ ________ ________ ________ |
| MONITORING: 22. Monitoring points read (if applicable) 23. No unusual readings/trends 24. Adjacent structures/ground stable | ☐ Yes ☐ Yes ☐ Yes | ☐ N/A ☐ N/A ☐ | Reading: ______ ________ ________ |
OVERALL ASSESSMENT:
Is temporary works safe for continued use? Yes ☐ No ☐ (If No, stop work immediately)
CORRECTIVE ACTIONS TAKEN:
______________
INSPECTOR SIGNATURE: ______________ DATE: ___________
REMOVAL AUTHORIZATION:
☐ Permanent works completed and achieved required strength
☐ Engineer confirmation received: Date: ___________ By: ______________
☐ Removal procedure reviewed with crew
☐ Removal sequence defined
☐ Fall protection during removal addressed
☐ Exclusion zone established below
REMOVAL SEQUENCE:
Step 1: ______________
Step 2: ______________
Step 3: ______________
Step 4: ______________
Step 5: ______________
CRITICAL CONSIDERATIONS:
☐ Remove in reverse order of installation
☐ Never remove supporting elements prematurely
☐ Do not overload permanent structure during removal
☐ Lower materials - do not drop
☐ Inspect components during removal for re-use
REMOVAL COMPLETION:
Date Removed: ___________ By: ______________ Verified By: ______________
Components Stored: Location: ______________ Condition for Re-use: Good ☐ Reject ☐
| TW ID _____ _____ _____ _____ _____ _____ | Description ________ ________ ________ ________ ________ ________ | Location ________ ________ ________ ________ ________ ________ | Designer ________ ________ ________ ________ ________ ________ | Date Designed _____________ _____________ _____________ _____________ _____________ _____________ | Date Built ___________ ___________ ___________ ___________ ___________ ___________ | Status ______ ______ ______ ______ ______ ______ | Next Inspection ________ ________ ________ ________ ________ ________ |
|---|
BASE PPE (ALL TEMPORARY WORKS):
☐ Hard hat
☐ Safety glasses with side shields
☐ High-visibility vest (as required)
☐ Steel-toed boots
☐ Work gloves
TASK-SPECIFIC PPE:
FALSEWORK/FORMWORK:
☐ Leather gloves ☐ Safety glasses ☐ Hearing protection (if using power tools)
SHORING/EXCAVATION:
☐ Rubber boots (if water present) ☐ Hard hat with chin strap ☐ High-visibility vest
COFFERDAM/DEWATERING:
☐ Life jacket (if over water) ☐ Rubber boots ☐ Rain gear ☐ Retrieval harness
WORKING AT HEIGHT:
☐ Full body harness ☐ Lanyard/SRL ☐ Hard hat with chin strap
POTENTIAL EMERGENCIES:
☐ Collapse/failure ☐ Flooding/inundation ☐ Cave-in ☐ Fire
☐ Structural instability ☐ Equipment impact ☐ Fall from height ☐ Medical emergency
EMERGENCY CONTACTS:
EMERGENCY: 911
Site Safety Officer: ______________ Phone: ______________
Temporary Works Coordinator: ______________ Phone: ______________
Project Manager: ______________ Phone: ______________
Design Engineer: ______________ Phone: ______________
Nearest Hospital: ______________ Phone: ______________
COLLAPSE/FAILURE PROCEDURES:
1. Evacuate area immediately - sound alarm
2. Account for all personnel - check for missing
3. Call 911 if injuries - advise "structural collapse"
4. DO NOT re-enter - secondary collapse risk
5. Secure perimeter - prevent unauthorized access
6. Contact designer/engineer immediately
7. Preserve scene for investigation
FLOODING/INUNDATION PROCEDURES:
1. Evacuate cofferdam/excavation immediately
2. Activate additional pumping
3. Account for all personnel
4. Notify project management
5. Monitor for stability issues
6. Do not re-enter until water level controlled and structure inspected
EVACUATION ROUTES:
Primary: ______________
Secondary: ______________
Assembly Point: ______________
ROLES AND RESPONSIBILITIES:
TEMPORARY WORKS COORDINATOR (TWC):
Name: ______________ Experience: ______ years Training Date: ___________
Responsibilities:
☐ Overall management of temporary works
☐ Ensure design and checking completed
☐ Maintain temporary works register
☐ Coordinate inspections
☐ Control changes/modifications
☐ Authorize removal
TEMPORARY WORKS SUPERVISOR (TWS):
Name: ______________ Experience: ______ years Training Date: ___________
Responsibilities:
☐ Supervise installation
☐ Conduct inspections
☐ Ensure compliance with design
☐ Report defects/incidents
☐ Stop work if unsafe
COMPETENT PERSON (for excavation shoring):
Name: ______________ Experience: ______ years Training Date: ___________
Responsibilities:
☐ Daily inspections of excavations
☐ Identify and correct hazards
☐ Classify soil
☐ Ensure protective systems adequate
| TRAINING LOG: TOPIC ________ Temporary Works Awareness Falsework/Formwork Safety Excavation Safety (Competent Person) Cofferdam Safety Inspection Procedures | TRAINER ________ ________ ________ ________ ________ ________ | DATE ___________ ___________ ___________ ___________ ___________ ___________ | ATTENDEES ________ ________ ________ ________ ________ ________ |
|---|
OVERALL RISK ASSESSMENT:
Based on the identified hazards and existing controls, the overall risk level for this temporary works:
☐ LOW - Simple, standard design, low consequence of failure
☐ MEDIUM - Moderate complexity, requires competent oversight
☐ HIGH - Complex design, significant consequence of failure, requires strict controls
☐ EXTREME - Critical temporary works, high consequence of failure, requires independent checking
CRITICAL CONTROLS REQUIRED:
1. ______________
2. ______________
3. ______________
4. ______________
5. ______________
DESIGN CATEGORY:
☐ Category 0 - Standard/simple design (e.g., standard scaffolding)
☐ Category 1 - Simple bespoke design (e.g., basic falsework)
☐ Category 2 - Complex design requiring specialist engineer (e.g., cofferdams, deep shoring)
☐ Category 3 - Very complex/high risk requiring independent design check
WORK STOPPING AUTHORITY:
All personnel have the authority and responsibility to stop work if conditions become unsafe.
Stop work conditions include:
- Visible distress/damage to temporary works
- Unexpected settlement/movement
- Missing components
- Overloading
- Water ingress/erosion
DESIGNER:
"I certify that this temporary works design meets all applicable standards and is suitable for the intended
purpose."
Name: ______________ Signature: ______________ Date: ___________
DESIGN CHECKER:
"I have independently checked this design and confirm it is correct."
Name: ______________ Signature: ______________ Date: ___________
TEMPORARY WORKS COORDINATOR:
"I confirm that the temporary works have been installed in accordance with the design and are safe for use."
Name: ______________ Signature: ______________ Date: ___________
PROJECT MANAGER:
"I approve the use of these temporary works."
Name: ______________ Signature: ______________ Date: ___________
NEXT REVIEW DATE: ______________