Structural Work Risk Assessment template

Free Structural Work Risk Assessment template for construction you can edit online and download as PDF. Covers project information, structural integrity control plan, fall protection plan - osha 29 cfr 1926 subpart m.

Project Information

ASSESSMENT ID: STR-__________ DATE: ______________ TIME: ______________

PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________

STRUCTURAL ENGINEER: ______________ SITE SUPERVISOR: _____________ DATE OF REVIEW: ______________

PROJECT PHASE: ______________ STRUCTURE TYPE: ______________ HEIGHT: ______ m/ft

BUILDING CODE: ______________ SEISMIC ZONE: _____ WIND LOAD DESIGN: _____ kN/m²

Structural Work Hazard Identification And Risk Assessment - Bs En 1990 / Aisc Standards

ACTIVITYHAZARDPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (1-5)RISK RATING (L x S)
Structural Frame Erection-Unstable structure during erection
-Improper sequence
-Inadequate bracing
-Partial/ total collapse
-Multiple fatalities
-Equipment damage
-Project delay
-Engineered shoring
-Temporary bracing
-Sequencing plan
-Daily inspections
-Structural engineer oversight
2 (Remote)5 (Catastrophic)10 (HIGH)
Column Placement-Column instability during hoisting
-Swinging load
-Crane contact
-Worker struck by column
-Crush injuries
-Loss of column
-Equipment damage
-Crane tip-over
-Tag lines
-Guying system
-Guide ropes
-Clear communica- tion
-Exclusion zone
3 (Occasional)4 (Critical)12 (HIGH)
Beam/Joist Installation-Unsecured beam during placement
-Walking/ working on unsecured beams
-Lack of fall protection
-Beam dislodgement
-Fall from height
-Multiple worker fatalities
-Controlled decking zone
-Fall arrest system
-Guard rails
-Safety nets
-Connector training
4 (Probable)4 (Critical)16 (EXTREME)
Bolting/ Welding Operations-Unstable work platform
-Inadequate access
-Falling tools/materials
-Fire/arc flash hazards
-Fall from height
-Burns
-Eye injury
-Crush injuries
-Welding flash
-Personal fall arrest system
-Scaffolding with rails
-Tool tethers
-Fire watch
-PPE (eye, welding)
5 (Frequent)4 (Critical)20 (EXTREME)
Material Storage-Unstable stacks
-Overloading
-Poor housekeeping
-Forklift collisions
-Struck by falling materials
-Equipment damage
-Worker injuries
-Stockpile limits
-Level ground
-Aisles maintained
-Banding/ strapping
-Signage
4 (Probable)3 (Major)12 (HIGH)
Weather Conditions-High winds
-Lightning
-Rain/ice
-Extreme heat/ cold
-Load instability
-Crane tip-over
-Worker hypothermia/ heat stress
-Slips/trips
-Weather monitoring
-Wind speed limits (20 mph for cranes)
-Work suspension procedures
-Heat/cold protocols
3 (Occasional)4 (Critical)12 (HIGH)

Structural Integrity Control Plan

TEMPORARY STABILITY REQUIREMENTS:

ERECTION SEQUENCE: Phase 1: ______________ Date: ___________ Engineer: ______________ Phase 2: ______________ Date: ___________ Engineer: ______________ Phase 3: ______________ Date: ___________ Engineer: ______________
TEMPORARY BRACING: Type: ______________ Locations: ______________ Installation tolerance: +/- ______ mm Inspection frequency: ______________ Responsible person: ______________ Last inspection: ___________ Next: ___________
GUYING REQUIREMENTS: Number of guys: ______ Tension: ______ kN Anchor type: ______________ Guy wire size: ______ mm Breaking strength: ______ kN
SHORING/UNDERPINNING: Type: ______________ Load capacity: ______ kN Installation drawings: Drawing #: ______________ Rev: ______ Engineer approval: Name: ______________ Date: ___________

STRUCTURAL CONNECTIONS:

BOLTED CONNECTIONS: Bolt grade: ______ Torque requirements: ______ N-m Inspection: 100% ☐ Sample ☐ Tension control: Direct ☐ Indirect ☐ Method: ______________
WELDED CONNECTIONS: Weld type: ______________ Electrode: ______ Position: ______________ Inspection method: Visual ☐ UT ☐ MT ☐ RT ☐ Frequency: ______% Welder certification required: Yes ☐ No ☐ Certifications on file: Yes ☐ No ☐
GROUTED CONNECTIONS: Grout type: ______________ Strength: ______ MPa Temperature range: ______°C Pouring method: ______________ Curing time: ______ hours
CONNECTION VERIFICATION: Inspector: ______________ Date: ___________ Findings: ______________ Corrective actions: ______________

Fall Protection Plan - OSHA 29 Cfr 1926 Subpart M

WORK AT HEIGHT ASSESSMENT:

Maximum working height: ______ m/ft Number of workers exposed: ______

Duration of work at height: ______ days/weeks

FALL PROTECTION SYSTEMS SELECTED:

☐ Personal Fall Arrest System (PFAS)
- Full body harness: Yes ☐ No ☐ - Anchor points: Type: ______________ Capacity: ______ kN
- Lanyard type: Shock-absorbing ☐ Self-retracting ☐ - Max free fall: ______ m/ft
- Anchor point locations: ______________
☐ Guard Rail System
- Top rail height: ______ m/ft - Mid rail: Yes ☐ No ☐ - Toe board: Yes ☐ No ☐
- Material: ______________ - Strength: ______ kN/m
☐ Safety Net System
- Net size: ______ m x ______ m - Mesh size: ______ mm - Drop distance: ______ m/ft
- Clearance below net: ______ m/ft - Inspection frequency: ______________
☐ Controlled Decking Zone (CDZ)
- Area size: ______ m² - Maximum unprotected edge length: ______ m/ft
- CDZ boundaries marked: Yes ☐ No ☐ - CDZ access limited to: ______________

RESCUE PLAN FOR FALL ARREST:

Self-rescue: Yes ☐ No ☐ Assisted rescue: Yes ☐ No ☐ Mechanical rescue: Yes ☐ No ☐ Rescue equipment available:
- ______ Location: ______________ - ______ Location: ______________ Rescue team: ______________ Training date: ___________ Rescue procedures posted: Yes ☐ No ☐ Last drill date: ___________ Estimated rescue time: ______ minutes

FALL PROTECTION INSPECTION LOG:

Date | Inspector | PFAS | Guard Rails | Nets | Findings | Actions

__________ | _________ | __________| ____________| __________| ______________ | ______________

__________ | _________ | __________| ____________| __________| ______________ | ______________

Structural Work Checklist - Daily Pre-Work Inspection

INSPECTOR: ______________ DATE: ______________ TIME: ______________ WEATHER: ______________

ITEMCOMPLIANTNON-COMPLIANTN/AREMARKS
1. Structural drawings available and current
2. Erection sequence plan reviewed
3. Temporary bracing in place per design
4. All connections properly torqued/welded
5. Fall protection systems in place and inspected
6. Anchor points verified and adequate
7. Guard rails installed where required
8. Floor openings covered or guarded
9. Perimeter protection adequate
10. Crane/lifting equipment inspected
11. Rigging gear inspected and certified
12. Tag lines used on suspended loads
13. Exclusion zones established and respected
14. Material storage areas organized and stable
15. Housekeeping maintained - no trip hazards
16. Weather conditions safe for work
17. Lighting adequate for work area
18. PPE being worn correctly (hard hat, vest, etc.)
19. Fire extinguishers available for hot work
20. Emergency procedures posted and understood
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________

CORRECTIVE ACTIONS REQUIRED:

______________

______________

FOREMAN SIGNATURE: ______________ DATE: ______________

Structural Inspection And Testing Plan (Itp)

ELEMENT | INSPECTION | ACCEPTANCE | INSPECTION | FREQUENCY | RECORD | STATUS

| METHOD | CRITERIA | RESPONSIBLE | | LOCATION |

Steel | Visual | No defects | QC Inspector | Each delivery| Material | Complete ☐ Pending ☐

Material | + MTR review | per ASTM | | | Report |

Bolted | Torque | Within spec | QC Engineer | 10% random | Torque log | Complete ☐ Pending ☐

Connections | wrench | | | | |

Welded | UT/MT/RT | AWS D1.1 | NDT Tech | 100% critical| NDT Report | Complete ☐ Pending ☐

Connections | | | | | |

Column | Survey | +/- 5 mm | Surveyor | Each column | As-built | Complete ☐ Pending ☐

Plumbness | instrument | | | | drawing |

Beam Level | Survey | +/- 10 mm | Surveyor | 25% random | As-built | Complete ☐ Pending ☐

| instrument | | | | drawing |

Grout | Compression | >35 MPa | Lab | Each batch | Test report | Complete ☐ Pending ☐

| test | | | | |

Fireproofing | Thickness | Per spec | QC Inspector | Each beam | Inspection | Complete ☐ Pending ☐

| gauge | | | | log |

Crane And Rigging Plan For Structural Steel

LIFT DETAILS:

Crane type: ______________ Capacity: ______ tons Configuration: ______________

Boom length: ______ m/ft Radius: ______ m/ft Calculated load: ______ % of capacity

CRITICAL LIFTS IDENTIFIED:

Lift #1: ______________ Weight: ______ kg/lbs Date: ___________ Engineer: ______________

Lift #2: ______________ Weight: ______ kg/lbs Date: ___________ Engineer: ______________

Lift #3: ______________ Weight: ______ kg/lbs Date: ___________ Engineer: ______________

RIGGING INSPECTION:

Sling type: ______________ Capacity: ______ tons Condition: Good ☐ Fair ☐ Replace ☐

Shackles: Size: ______ mm Capacity: ______ tons Condition: Good ☐ Fair ☐ Replace ☐

Spreader bar: Size: ______ m Capacity: ______ tons Certification: Current ☐ Expired ☐

LIFT SUPERVISOR: ______________ CRANE OPERATOR: ______________ RIGGER: ______________

SIGNAL PERSON: ______________ METHOD: Hand signals ☐ Radio ☐

Structural Work Safety Performance Indicators

INDICATORTARGETCURRENTTRENDACTION REQUIRED
Lost Time Injuries (LTI) Recordable Incidents Near Miss Reports Fall Protection Violations Structural Deficiencies Found Connection Non-Conformances Crane/Lifting Incidents Weather-Related Stoppages Toolbox Talks Conducted Safety Inspection Compliance0 <2 >5 0 0 <2% 0 <3 Weekly 100%_______ _______ _______ _______ _______ _______ _______ _______ _______ _______↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓________ ________ ________ ________ ________ ________ ________ ________ ________ ________

Emergency Response Plan - Structural Work

POTENTIAL EMERGENCIES:

☐ Structural collapse ☐ Fall from height ☐ Crane overturn

☐ Fire/explosion ☐ Medical emergency ☐ Severe weather

☐ Multiple casualty incident ☐ Utility strike ☐ Toxic release

EMERGENCY CONTACTS:

Ambulance: ______________ Fire: ______________ Police: ______________

Site Safety: ______________ Site Manager: ______________ Engineer: ______________

Hospital: ______________ Address: ______________ Phone: ______________

ASSEMBLY POINT: ______________ ALTERNATE: ______________

EMERGENCY EQUIPMENT LOCATIONS:

First Aid: ______________ AED: ______________ Stretcher: ______________

Fire Extinguishers: ______________ Spill Kit: ______________

Rescue Equipment: ______________ Communication: ______________

RESCUE PROCEDURES FOR FALL ARREST:

1. Assess situation - do not become a second victim

2. Communicate with suspended worker

3. Initiate rescue within 15 minutes

4. Lower worker safely using rescue system

5. Provide medical attention

6. Investigate incident

DRILL SCHEDULE:

Last drill: ______________ Type: ______________ Participants: ______

Next drill: ______________ Type: ______________

Structural Work Action Plan

No.ACTION ITEMRESPONSIBLESTART DATEDUE DATESTATUS
1Review and update erection sequence plan with structural engineerProject Eng.______________________☐ Not Started
☐ In Progress
☐ Completed
2Conduct fall protection training for all ironworkersSafety Officer______________________☐ Not Started
☐ In Progress
☐ Completed
3Inspect and recertify all rigging gearRigging Supervisor______________________☐ Not Started
☐ In Progress
☐ Completed
4Implement daily pre-work structural integrity checklistSite Foreman______________________☐ Not Started
☐ In Progress
☐ Completed
5Conduct mock rescue drill for fall arrest scenarioSafety Officer______________________☐ Not Started
☐ In Progress
☐ Completed

Approvals

ASSESSMENT PREPARED BY:

Name: ______________ Title: ______________ Date: ___________ Signature: ___________

REVIEWED BY (Project Engineer):

Name: ______________ Title: ______________ Date: ___________ Signature: ___________

REVIEWED BY (Safety Manager):

Name: ______________ Title: ______________ Date: ___________ Signature: ___________

REVIEWED BY (Structural Engineer of Record):

Name: ______________ Title: ______________ Date: ___________ Signature: ___________

APPROVED BY (Project Manager):

Name: ______________ Title: ______________ Date: ___________ Signature: ___________

More templates