Free Structural Work Risk Assessment template for construction you can edit online and download as PDF. Covers project information, structural integrity control plan, fall protection plan - osha 29 cfr 1926 subpart m.
ASSESSMENT ID: STR-__________ DATE: ______________ TIME: ______________
PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________
STRUCTURAL ENGINEER: ______________ SITE SUPERVISOR: _____________ DATE OF REVIEW: ______________
PROJECT PHASE: ______________ STRUCTURE TYPE: ______________ HEIGHT: ______ m/ft
BUILDING CODE: ______________ SEISMIC ZONE: _____ WIND LOAD DESIGN: _____ kN/m²
| ACTIVITY | HAZARD | POTENTIAL CONSEQUENCE | EXISTING CONTROLS | LIKELIHOOD (1-5) | SEVERITY (1-5) | RISK RATING (L x S) |
|---|---|---|---|---|---|---|
| Structural Frame Erection | -Unstable structure during erection -Improper sequence -Inadequate bracing | -Partial/ total collapse -Multiple fatalities -Equipment damage -Project delay | -Engineered shoring -Temporary bracing -Sequencing plan -Daily inspections -Structural engineer oversight | 2 (Remote) | 5 (Catastrophic) | 10 (HIGH) |
| Column Placement | -Column instability during hoisting -Swinging load -Crane contact -Worker struck by column | -Crush injuries -Loss of column -Equipment damage -Crane tip-over | -Tag lines -Guying system -Guide ropes -Clear communica- tion -Exclusion zone | 3 (Occasional) | 4 (Critical) | 12 (HIGH) |
| Beam/Joist Installation | -Unsecured beam during placement -Walking/ working on unsecured beams -Lack of fall protection | -Beam dislodgement -Fall from height -Multiple worker fatalities | -Controlled decking zone -Fall arrest system -Guard rails -Safety nets -Connector training | 4 (Probable) | 4 (Critical) | 16 (EXTREME) |
| Bolting/ Welding Operations | -Unstable work platform -Inadequate access -Falling tools/materials -Fire/arc flash hazards | -Fall from height -Burns -Eye injury -Crush injuries -Welding flash | -Personal fall arrest system -Scaffolding with rails -Tool tethers -Fire watch -PPE (eye, welding) | 5 (Frequent) | 4 (Critical) | 20 (EXTREME) |
| Material Storage | -Unstable stacks -Overloading -Poor housekeeping -Forklift collisions | -Struck by falling materials -Equipment damage -Worker injuries | -Stockpile limits -Level ground -Aisles maintained -Banding/ strapping -Signage | 4 (Probable) | 3 (Major) | 12 (HIGH) |
| Weather Conditions | -High winds -Lightning -Rain/ice -Extreme heat/ cold | -Load instability -Crane tip-over -Worker hypothermia/ heat stress -Slips/trips | -Weather monitoring -Wind speed limits (20 mph for cranes) -Work suspension procedures -Heat/cold protocols | 3 (Occasional) | 4 (Critical) | 12 (HIGH) |
TEMPORARY STABILITY REQUIREMENTS:
| ERECTION SEQUENCE: Phase 1: ______________ Date: ___________ Engineer: ______________ Phase 2: ______________ Date: ___________ Engineer: ______________ Phase 3: ______________ Date: ___________ Engineer: ______________ | |
|---|---|
| TEMPORARY BRACING: Type: ______________ Locations: ______________ Installation tolerance: +/- ______ mm Inspection frequency: ______________ Responsible person: ______________ Last inspection: ___________ Next: ___________ | |
| GUYING REQUIREMENTS: Number of guys: ______ Tension: ______ kN Anchor type: ______________ Guy wire size: ______ mm Breaking strength: ______ kN | |
| SHORING/UNDERPINNING: Type: ______________ Load capacity: ______ kN Installation drawings: Drawing #: ______________ Rev: ______ Engineer approval: Name: ______________ Date: ___________ |
STRUCTURAL CONNECTIONS:
| BOLTED CONNECTIONS: Bolt grade: ______ Torque requirements: ______ N-m Inspection: 100% ☐ Sample ☐ Tension control: Direct ☐ Indirect ☐ Method: ______________ | |
|---|---|
| WELDED CONNECTIONS: Weld type: ______________ Electrode: ______ Position: ______________ Inspection method: Visual ☐ UT ☐ MT ☐ RT ☐ Frequency: ______% Welder certification required: Yes ☐ No ☐ Certifications on file: Yes ☐ No ☐ | |
| GROUTED CONNECTIONS: Grout type: ______________ Strength: ______ MPa Temperature range: ______°C Pouring method: ______________ Curing time: ______ hours | |
| CONNECTION VERIFICATION: Inspector: ______________ Date: ___________ Findings: ______________ Corrective actions: ______________ |
WORK AT HEIGHT ASSESSMENT:
Maximum working height: ______ m/ft Number of workers exposed: ______
Duration of work at height: ______ days/weeks
FALL PROTECTION SYSTEMS SELECTED:
| ☐ Personal Fall Arrest System (PFAS) - Full body harness: Yes ☐ No ☐ - Anchor points: Type: ______________ Capacity: ______ kN - Lanyard type: Shock-absorbing ☐ Self-retracting ☐ - Max free fall: ______ m/ft - Anchor point locations: ______________ | |
|---|---|
| ☐ Guard Rail System - Top rail height: ______ m/ft - Mid rail: Yes ☐ No ☐ - Toe board: Yes ☐ No ☐ - Material: ______________ - Strength: ______ kN/m | |
| ☐ Safety Net System - Net size: ______ m x ______ m - Mesh size: ______ mm - Drop distance: ______ m/ft - Clearance below net: ______ m/ft - Inspection frequency: ______________ | |
| ☐ Controlled Decking Zone (CDZ) - Area size: ______ m² - Maximum unprotected edge length: ______ m/ft - CDZ boundaries marked: Yes ☐ No ☐ - CDZ access limited to: ______________ |
RESCUE PLAN FOR FALL ARREST:
| Self-rescue: Yes ☐ No ☐ Assisted rescue: Yes ☐ No ☐ Mechanical rescue: Yes ☐ No ☐ Rescue equipment available: - ______ Location: ______________ - ______ Location: ______________ Rescue team: ______________ Training date: ___________ Rescue procedures posted: Yes ☐ No ☐ Last drill date: ___________ Estimated rescue time: ______ minutes |
|---|
FALL PROTECTION INSPECTION LOG:
Date | Inspector | PFAS | Guard Rails | Nets | Findings | Actions
__________ | _________ | __________| ____________| __________| ______________ | ______________
__________ | _________ | __________| ____________| __________| ______________ | ______________
INSPECTOR: ______________ DATE: ______________ TIME: ______________ WEATHER: ______________
| ITEM | COMPLIANT | NON-COMPLIANT | N/A | REMARKS |
|---|---|---|---|---|
| 1. Structural drawings available and current 2. Erection sequence plan reviewed 3. Temporary bracing in place per design 4. All connections properly torqued/welded 5. Fall protection systems in place and inspected 6. Anchor points verified and adequate 7. Guard rails installed where required 8. Floor openings covered or guarded 9. Perimeter protection adequate 10. Crane/lifting equipment inspected 11. Rigging gear inspected and certified 12. Tag lines used on suspended loads 13. Exclusion zones established and respected 14. Material storage areas organized and stable 15. Housekeeping maintained - no trip hazards 16. Weather conditions safe for work 17. Lighting adequate for work area 18. PPE being worn correctly (hard hat, vest, etc.) 19. Fire extinguishers available for hot work 20. Emergency procedures posted and understood | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ |
CORRECTIVE ACTIONS REQUIRED:
______________
______________
FOREMAN SIGNATURE: ______________ DATE: ______________
ELEMENT | INSPECTION | ACCEPTANCE | INSPECTION | FREQUENCY | RECORD | STATUS
| METHOD | CRITERIA | RESPONSIBLE | | LOCATION |
Steel | Visual | No defects | QC Inspector | Each delivery| Material | Complete ☐ Pending ☐
Material | + MTR review | per ASTM | | | Report |
Bolted | Torque | Within spec | QC Engineer | 10% random | Torque log | Complete ☐ Pending ☐
Connections | wrench | | | | |
Welded | UT/MT/RT | AWS D1.1 | NDT Tech | 100% critical| NDT Report | Complete ☐ Pending ☐
Connections | | | | | |
Column | Survey | +/- 5 mm | Surveyor | Each column | As-built | Complete ☐ Pending ☐
Plumbness | instrument | | | | drawing |
Beam Level | Survey | +/- 10 mm | Surveyor | 25% random | As-built | Complete ☐ Pending ☐
| instrument | | | | drawing |
Grout | Compression | >35 MPa | Lab | Each batch | Test report | Complete ☐ Pending ☐
| test | | | | |
Fireproofing | Thickness | Per spec | QC Inspector | Each beam | Inspection | Complete ☐ Pending ☐
| gauge | | | | log |
LIFT DETAILS:
Crane type: ______________ Capacity: ______ tons Configuration: ______________
Boom length: ______ m/ft Radius: ______ m/ft Calculated load: ______ % of capacity
CRITICAL LIFTS IDENTIFIED:
Lift #1: ______________ Weight: ______ kg/lbs Date: ___________ Engineer: ______________
Lift #2: ______________ Weight: ______ kg/lbs Date: ___________ Engineer: ______________
Lift #3: ______________ Weight: ______ kg/lbs Date: ___________ Engineer: ______________
RIGGING INSPECTION:
Sling type: ______________ Capacity: ______ tons Condition: Good ☐ Fair ☐ Replace ☐
Shackles: Size: ______ mm Capacity: ______ tons Condition: Good ☐ Fair ☐ Replace ☐
Spreader bar: Size: ______ m Capacity: ______ tons Certification: Current ☐ Expired ☐
LIFT SUPERVISOR: ______________ CRANE OPERATOR: ______________ RIGGER: ______________
SIGNAL PERSON: ______________ METHOD: Hand signals ☐ Radio ☐
| INDICATOR | TARGET | CURRENT | TREND | ACTION REQUIRED |
|---|---|---|---|---|
| Lost Time Injuries (LTI) Recordable Incidents Near Miss Reports Fall Protection Violations Structural Deficiencies Found Connection Non-Conformances Crane/Lifting Incidents Weather-Related Stoppages Toolbox Talks Conducted Safety Inspection Compliance | 0 <2 >5 0 0 <2% 0 <3 Weekly 100% | _______ _______ _______ _______ _______ _______ _______ _______ _______ _______ | ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ ↑↓ | ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ |
POTENTIAL EMERGENCIES:
☐ Structural collapse ☐ Fall from height ☐ Crane overturn
☐ Fire/explosion ☐ Medical emergency ☐ Severe weather
☐ Multiple casualty incident ☐ Utility strike ☐ Toxic release
EMERGENCY CONTACTS:
Ambulance: ______________ Fire: ______________ Police: ______________
Site Safety: ______________ Site Manager: ______________ Engineer: ______________
Hospital: ______________ Address: ______________ Phone: ______________
ASSEMBLY POINT: ______________ ALTERNATE: ______________
EMERGENCY EQUIPMENT LOCATIONS:
First Aid: ______________ AED: ______________ Stretcher: ______________
Fire Extinguishers: ______________ Spill Kit: ______________
Rescue Equipment: ______________ Communication: ______________
RESCUE PROCEDURES FOR FALL ARREST:
1. Assess situation - do not become a second victim
2. Communicate with suspended worker
3. Initiate rescue within 15 minutes
4. Lower worker safely using rescue system
5. Provide medical attention
6. Investigate incident
DRILL SCHEDULE:
Last drill: ______________ Type: ______________ Participants: ______
Next drill: ______________ Type: ______________
| No. | ACTION ITEM | RESPONSIBLE | START DATE | DUE DATE | STATUS |
|---|---|---|---|---|---|
| 1 | Review and update erection sequence plan with structural engineer | Project Eng. | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 2 | Conduct fall protection training for all ironworkers | Safety Officer | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 3 | Inspect and recertify all rigging gear | Rigging Supervisor | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 4 | Implement daily pre-work structural integrity checklist | Site Foreman | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
| 5 | Conduct mock rescue drill for fall arrest scenario | Safety Officer | ___________ | ___________ | ☐ Not Started ☐ In Progress ☐ Completed |
ASSESSMENT PREPARED BY:
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
REVIEWED BY (Project Engineer):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
REVIEWED BY (Safety Manager):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
REVIEWED BY (Structural Engineer of Record):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________
APPROVED BY (Project Manager):
Name: ______________ Title: ______________ Date: ___________ Signature: ___________