ASSESSMENT ID: STL-__________ DATE: ______________ TIME: ______________
PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________
STRUCTURE TYPE:
☐ Building Frame ☐ Bridge ☐ Industrial ☐ Tower ☐ Roof Truss ☐ Other: ______________
STEEL SPECIFICATIONS:
Total Tonnage: ______ tons Max Piece Weight: ______ tons Max Lift Height: ______ m (ft)
Connection Types: ☐ Bolted ☐ Welded ☐ Combination
STEEL ERECTOR: ______________ ERECTION SUPERVISOR: ______________
STRUCTURAL ENGINEER: ______________ PE #: ______________
ERECTION START DATE: ______________ ESTIMATED COMPLETION: ______________
ERECTION PLAN:
☐ Erection plan prepared by qualified person: ______________ Date: ___________
☐ Plan includes sequence of erection
☐ Plan includes temporary bracing requirements
☐ Plan includes critical lift identification
☐ Plan includes fall protection procedures
☐ Plan reviewed with all workers pre-erection
DRAWINGS AND DOCUMENTS:
☐ Structural drawings available and current Drawing #: ______________
☐ Shop drawings available Drawing #: ______________
☐ Connection details available Drawing #: ______________
☐ Anchor bolt setting plan available Drawing #: ______________
☐ Field weld procedures (WPS) available #: ______________
SITE CONDITIONS:
☐ Site access for cranes verified
☐ Ground conditions adequate for crane setup
☐ Overhead power lines identified and protected
☐ Underground utilities located and marked
☐ Adjacent structures protected
☐ Public protection measures in place
ENGINEER'S CERTIFICATION:
"I certify that the steel structure and erection plan meet all applicable codes and standards. The structure
is designed to withstand construction loads with the specified temporary bracing."
Name: ______________ PE #: ______________ Date: ___________ Signature: ___________
CRANE INFORMATION:
Crane Type: ______________ Manufacturer: ______________ Model: ______________
Capacity: ______ tons Configuration: ______________ Crane ID: ______________
Operator: ______________ Certification #: ______________ Expiry: ___________
Last Inspection: ___________ Next Inspection: ___________ Annual: ☐ Monthly: ☐ Daily: ☐
| DAILY CRANE INSPECTION CHECKLIST: Item ________ Wire rope/hoist line Hook and latch Boom and jib Outriggers/pads Tires/tracks Hydraulics/leaks Controls Safety devices Load indicator Anti-two block Swing brake Lights/alarms | Satisfactory _____________ ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | Defect Found _____________ ☐ ☐ ☐ ☐ ☐ N/A ☐ ☐ ☐ ☐ ☐ N/A ☐ ☐ N/A | Corrective Action ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ |
|---|
| RIGGING EQUIPMENT: Equipment Type ________ Slings (wire) Slings (synthetic) Shackles Turnbuckles Spreader bars Lifting lugs Chokers | Size/Capacity ________ ________ _____________ ________ ________ ________ ________ ________ | Condition __________ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ | Last Inspected ________ ________ ________ ________ ________ ________ ________ ________ | Next Inspected ________ ________ ________ ________ ________ ________ ________ ________ | Tag Color ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ |
|---|
Rigger-in-charge: ______________ Certified? Yes ☐ No ☐ Certification #: ______________
| HAZARD | CAUSE | POTENTIAL CONSEQUENCE | EXISTING CONTROLS | LIKELIHOOD (1-5) | SEVERITY (1-5) | RISK RATING (L x S) |
|---|---|---|---|---|---|---|
| Structural Instability / Collapse | -Inadequate temporary bracing -Missing connections -Unsecured columns -Wind loading during erection -Improper erection sequence | -Cascade collapse -Multiple fatalities -Crush injuries -Equipment damage -Schedule delays | -Erection sequence plan -Temporary bracing design -Guying -Anchor bolt verification -Progressive stability checks | 3 (Occasional) | 5 (Catastrophic) | 15 (EXTREME) |
| Falls from Height | -Unprotected edges -Missing fall arrest system -Improper tie-off -Connector rods/beams without protection -Slip on steel surfaces | -Fatalities -Paralysis -Broken bones -Head injury -Permanent disability | -Guardrails (permanent) -Personal fall arrest system (PFAS) -Safety nets -Controlled decking zones -Connector safety (6' rule) | 5 (Frequent) | 5 (Catastrophic) | 25 (EXTREME) |
| Falling Objects | -Unsecured tools -Loose materials -Spanner bags/bolts on beams -Wind blowing materials -Improper storage -Crane loads | -Struck-by injuries -Head injury -Fatality -Equipment damage -Public injury | -Tool tethers -Toeboards -Debris nets -Exclusion zones -Barricades -Material storage limits -Canopies -Hard hats (all workers) | 5 (Frequent) | 4 (Critical) | 20 (EXTREME) |
| Crane Related Hazards | -Overloading -Improper rigging -Swinging loads -Two-blocking -Power line contact -Outrigger failure -Poor communi- cation | -Crane tip -Load drop -Boom collapse -Struck by load -Electro- cution -Crush injuries | -Lift plan for all critical lifts -Rigging inspection -Load indicators -Tag lines -Power line clearance (20' rule) -Qualified operators | 3 (Occasional) | 5 (Catastrophic) | 15 (EXTREME) |
| Bolting Operations | -Improper bolt installation -Incorrect bolt tension -Tool kickback -Ergonomics (awkward positions) -Falling tools/bolts | -Connection failure -Structural instability -Injury from tool kickback -Musculo- skeletal injuries -Struck by falling objects | -Torque wrench calibration -Turn-of-nut method -Direct tension indicators -Work positioning -Tool tethers | 4 (Probable) | 3 (Major) | 12 (HIGH) |
| Welding Operations | -Fire/ explosion -Arc flash -Fumes/gas exposure -Electrical shock -Compressed gas cylinders -Welding in rain/wet conditions | -Burns -Eye damage (arc eye) -Respiratory illness -Electro- cution -Explosion | -Hot work permit -Fire watch required -Welding screens -PPE (hood, gloves, leathers) -Ventilation -Cylinder storage | 3 (Occasional) | 4 (Critical) | 12 (HIGH) |
| Decking Operations | -Open openings -Unsecured deck sheets -Wind lifting sheets -Lack of fall protection -Inadequate decking sequence | -Fall through -Falls -Struck by materials -Crush injuries -Cut hazards (sharp edges) | -Controlled decking zones -Cover openings -Securing deck sheets immediately -Fall protection at leading edge | 4 (Probable) | 5 (Catastrophic) | 20 (EXTREME) |
| Adverse Weather | -High wind (≥20 mph) -Lightning -Rain/ice/snow -Extreme heat -Poor visibility | -Loss of control of loads -Crane instability -Electro- cution -Slips/falls -Heat stress -Hypothermia | -Wind monitoring -Work suspension criteria (wind ≥20 mph stop lifts, ≥30 mph stop all) -Lightning safety (30/30 rule) | 3 (Occasional) | 4 (Critical) | 12 (HIGH) |
LIFT ID: ______________ DATE: ______________ TIME: ______________
DESCRIPTION: ______________
LOAD DETAILS:
Piece: ______________ Weight: ______ tons Dimensions: ______ x ______ x ______
Center of gravity location: ______________
Lift radius: ______ ft Lift height: ______ ft Boom angle: ______ degrees
Crane capacity at this radius/angle: ______ tons % of capacity: ______%
RIGGING DETAILS:
Sling type/size: ______________ Sling capacity: ______ tons # of slings: ______
Sling angle: ______ degrees Reduction factor: ______ Effective capacity: ______ tons
Shackle size/capacity: ______________ Lifting lug capacity: ______ tons
Spreader beam required? Yes ☐ No ☐ Capacity: ______ tons
PERSONNEL:
Lift Director: ______________ Crane Operator: ______________
Signal Person: ______________ Rigger: ______________
Safety Observer: ______________
SITE CONDITIONS:
Ground conditions: ______________ Outrigger pads: ______________
Overhead obstructions: ______________ Power line clearance: ______ ft
Weather conditions: Wind speed: ______ mph Visibility: Good ☐ Fair ☐ Poor ☐
COMMUNICATION:
Primary method: ☐ Radio (channel: ___) ☐ Hand signals ☐ Verbal ☐ Other: ______________
Backup method: ______________
Hand signal card posted? Yes ☐ No ☐
LIFT APPROVAL:
Lift Director: ______________ Date: ___________ Time: ___________
Crane Operator: ______________ Date: ___________ Time: ___________
FALL PROTECTION REQUIREMENTS:
CONNECTORS (workers connecting steel):
☐ Fall protection required at heights > 15 feet (2 stories)
☐ Connectors must be protected from falls > 30 feet
☐ Connector safety: 100% tie-off when possible
☐ Connector training completed: Date: ___________
ALL OTHER WORKERS:
☐ Fall protection required at heights > 15 feet
☐ Guardrail systems ☐ Personal fall arrest systems ☐ Safety nets
☐ Positioning device systems
CONTROLLED DECKING ZONES (CDZ):
☐ CDZ established for initial decking operations
☐ CDZ boundaries clearly marked
☐ Only trained workers allowed in CDZ
☐ CDZ not to exceed 90 feet in width
☐ CDZ not to exceed 3 floors or 50 feet in height
☐ CDZ safety monitoring system in place
PERSONAL FALL ARREST SYSTEMS (PFAS):
Harness type: ______________ Manufacturer: ______________ Last inspected: ___________
Lanyard type: ☐ Shock-absorbing ☐ Self-retracting Length: ______ ft
Anchor points: ______________ Capacity: 5,000 lbs minimum
Clearance calculation: Free fall ≤ 6 ft, Total fall distance: ______ ft
Rescue plan for suspended workers: ______________
SAFETY NETS:
☐ Nets installed where fall hazards exist
☐ Drop test completed: Date: ___________ Results: Pass ☐ Fail ☐
☐ Nets extend 8-13 feet beyond edge
☐ No debris in nets
☐ Nets inspected weekly: Last inspection: ___________
INSPECTOR: ______________ DATE: ______________ TIME: ______________
WEATHER: ______________ WIND: ______ mph TEMP: ______°F/°C
| INSPECTION ITEM | SATISFACTORY | DEFECT FOUND | CORRECTIVE ACTION |
|---|---|---|---|
| PRE-ERECTION: 1. Erection plan reviewed with crew 2. Crane pre-use inspection completed 3. Rigging equipment inspected 4. Anchor bolts/leveling plates checked 5. Site ground conditions adequate | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ ☐ | ________ ________ ________ ________ ________ |
| STRUCTURAL STABILITY: 6. Erected steel plumb and level 7. Temporary bracing installed per plan 8. Connections properly made (bolts/welds) 9. No unsecured members 10. Structure stable before releasing crane | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ ☐ | ________ ________ ________ ________ ________ |
| FALL PROTECTION: 11. Connectors tied-off where required 12. Other workers using fall protection 13. Anchor points adequate and identified 14. Leading edge protection in place 15. Safety nets installed (if used) | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ N/A ☐ ☐ ☐ N/A | ________ ________ ________ ________ ________ |
| FALLING OBJECT PROTECTION: 16. Toeboards installed where required 17. Tool tethers in use 18. Debris nets/ canopies in place 19. Materials stored securely 20. Exclusion zones below work | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ N/A ☐ ☐ | ________ ________ ________ ________ ________ |
| CRANE OPERATIONS: 21. Crane setup/outriggers adequate 22. Power line clearance maintained 23. Tag lines used on loads 24. Load chart and capacity limits observed 25. Communications effective | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ N/A ☐ ☐ ☐ | ________ ________ ________ ________ ________ |
| HOUSEKEEPING: 26. Work areas clear of debris 27. Bolts/tools stored properly 28. Walkways and access clear | ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ | ________ ________ ________ |
OVERALL ASSESSMENT:
Is steel erection safe to continue? Yes ☐ No ☐ (If No, stop work immediately)
CORRECTIVE ACTIONS TAKEN:
______________
______________
FOREMAN SIGNATURE: ______________ DATE: ___________
| COLUMN/GRID ________ ________ ________ ________ ________ ________ | CONNECTION TYPE ________ ________ ________ ________ ________ ________ | BOLTS INSTALLED ________ ________ ________ ________ ________ ________ | TORQUE VALUE ____________ ____________ ____________ ____________ ____________ ____________ | INSPECTED __________ __________ __________ __________ __________ __________ | ACCEPTED _________ _________ _________ _________ _________ _________ | DATE ___________ ___________ ___________ ___________ ___________ ___________ |
|---|
| WELD INSPECTION LOG: Weld ID _______ _______ | Type _____ _____ | Size _____ _____ | Visual Insp ___________ ___________ | NDT Method __________ __________ | NDT Results ___________ ___________ | Accepted ________ ________ | Inspector __________ __________ | Date ___________ ___________ |
|---|
REQUIRED PPE:
☐ Hard hat (with chin strap if working at height)
☐ Safety glasses with side shields
�| High-visibility vest
☐ Steel-toed boots (with non-slip soles)
�| Leather gloves (for handling steel)
☐ Hearing protection (near cranes/equipment)
☐ Full body harness with lanyard (fall protection)
☐ Welding PPE (hood, gloves, leathers) - as required
☐ Face shield (for grinding/cutting)
☐ Sun protection
TOOL TETHERS:
Required for all tools at height? Yes ☐ No ☐
Tether type: ☐ Lanyard ☐ Retractable ☐ Bungee
Approved for tool weight? Yes ☐ No ☐
POTENTIAL EMERGENCIES:
☐ Structural collapse ☐ Fall from height ☐ Crane accident ☐ Fire/explosion
☐ Medical emergency ☐ Electrical contact ☐ Welding fire ☐ Severe weather
☐ Suspended worker rescue
EMERGENCY CONTACTS:
EMERGENCY: 911
Site Safety Officer: ______________ Phone: ______________
Erection Supervisor: ______________ Phone: ______________
Project Manager: ______________ Phone: ______________
Nearest Hospital: ______________ Phone: ______________
RESCUE PROCEDURES FOR SUSPENDED WORKERS:
1. Assess situation - DO NOT become victim
2. Call 911 - advise of suspended worker
3. Communicate with suspended worker
4. Initiate pre-planned rescue:
☐ Self-rescue (descender device)
☐ Aerial lift rescue
☐ Crane rescue with personnel basket
☐ Wait for emergency services
5. Provide first aid after rescue
6. Complete incident report
RESCUE EQUIPMENT LOCATION:
Rescue descender: ______________
Personnel basket: ______________
Ladder: ______________
First aid kit: ______________
STRUCTURAL COLLAPSE PROCEDURES:
1. Clear area immediately - evacuate to assembly point
2. Account for all personnel
3. Call 911 - advise of collapse and potential trapped workers
4. DO NOT re-enter structure - wait for emergency services
5. Secure perimeter - prevent unauthorized access
EVACUATION ROUTES:
Primary: ______________
Secondary: ______________
Assembly Point: ______________
TRAINING REQUIREMENTS - OSHA 29 CFR 1926.761
| TOPIC ________ Steel Erection Safety Orientation Fall Protection for Steel Erectors Connector Safety Crane and Rigging Safety Critical Lift Procedures Bolting/Welding Procedures Site-Specific Erection Plan Emergency Procedures | TRAINER ________ ________ ________ ________ ________ ________ ________ ________ ________ | DATE ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ | ATTENDEES ________ ________ ________ ________ ________ ________ ________ ________ ________ |
|---|
COMPETENT PERSON DESIGNATION:
Name: ______________ Title: ______________ Experience: ______ years
Responsibilities:
☐ Daily inspections of steel erection operations
☐ Verify temporary bracing installation
☐ Ensure fall protection compliance
☐ Identify and correct hazards
☐ Stop work when unsafe conditions exist
CRANE OPERATOR CERTIFICATION:
Name: ______________ Cert #: ______________ Expiry: ___________
Name: ______________ Cert #: ______________ Expiry: ___________
RIGGER CERTIFICATION:
Name: ______________ Cert #: ______________ Level: Basic ☐ Advanced ☐
SIGNAL PERSON CERTIFICATION:
Name: ______________ Qualified by: ______________ Date: ___________
| PERMIT TYPE ________ Crane Use Permit Critical Lift Permit Hot Work Permit (welding) Steel Erection Permit Overheight Transport | ISSUING AUTHORITY ________ ________ ________ ________ ________ ________ | PERMIT # _____________ _____________ _____________ _____________ _____________ _____________ | ISSUE DATE ___________ ___________ ___________ ___________ ___________ ___________ | EXPIRY DATE ___________ ___________ ___________ ___________ ___________ ___________ |
|---|
NOTIFICATIONS COMPLETED:
☐ OSHA (if applicable) Date: ___________ Confirmation #: ______________
�| Local authorities (road closures) Date: ___________ Contact: ______________
☐ Adjacent property owners Date: ___________ Method: ______________
OVERALL RISK ASSESSMENT:
Based on the identified hazards and existing controls, the overall risk level for this steel erection is:
☐ LOW - Routine erection with minimal hazards, controls adequate
☐ MEDIUM - Moderate hazards, requires ongoing monitoring
☐ HIGH - Significant hazards, requires active controls and frequent inspection
☐ EXTREME - Severe hazards, requires engineering controls and specialized oversight
CRITICAL CONTROLS REQUIRED:
1. ______________
2. ______________
3. ______________
4. ______________
5. ______________
WORK STOPPING AUTHORITY:
All personnel have the authority and responsibility to stop work if conditions become unsafe.
Stop work protocol: Notify supervisor immediately, secure area, correct condition before resuming.
ERECTION SUPERVISOR:
"I have reviewed this risk assessment and confirm that all identified hazards have been addressed with
appropriate controls. All required permits and notifications are complete."
Name: ______________ Signature: ______________ Date: ___________
PROJECT MANAGER:
"I approve the steel erection plan and risk assessment. Resources are allocated for all required controls."
Name: ______________ Signature: ______________ Date: ___________
SAFETY OFFICER:
"I have verified that all safety requirements are met and that steel erection can proceed safely."
Name: ______________ Signature: ______________ Date: ___________
CRANE OPERATOR:
"I have reviewed the lift plan and confirm that I understand my role in safe steel erection."
Name: ______________ Signature: ______________ Date: ___________
NEXT REVIEW DATE: ______________