Steel Erection Project Information

ASSESSMENT ID: STL-__________ DATE: ______________ TIME: ______________

PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________

STRUCTURE TYPE:

☐ Building Frame ☐ Bridge ☐ Industrial ☐ Tower ☐ Roof Truss ☐ Other: ______________

STEEL SPECIFICATIONS:

Total Tonnage: ______ tons Max Piece Weight: ______ tons Max Lift Height: ______ m (ft)

Connection Types: ☐ Bolted ☐ Welded ☐ Combination

STEEL ERECTOR: ______________ ERECTION SUPERVISOR: ______________

STRUCTURAL ENGINEER: ______________ PE #: ______________

ERECTION START DATE: ______________ ESTIMATED COMPLETION: ______________

Pre-Erection Engineering And Planning - OSHA 29 Cfr 1926.752

ERECTION PLAN:

☐ Erection plan prepared by qualified person: ______________ Date: ___________

☐ Plan includes sequence of erection

☐ Plan includes temporary bracing requirements

☐ Plan includes critical lift identification

☐ Plan includes fall protection procedures

☐ Plan reviewed with all workers pre-erection

DRAWINGS AND DOCUMENTS:

☐ Structural drawings available and current Drawing #: ______________

☐ Shop drawings available Drawing #: ______________

☐ Connection details available Drawing #: ______________

☐ Anchor bolt setting plan available Drawing #: ______________

☐ Field weld procedures (WPS) available #: ______________

SITE CONDITIONS:

☐ Site access for cranes verified

☐ Ground conditions adequate for crane setup

☐ Overhead power lines identified and protected

☐ Underground utilities located and marked

☐ Adjacent structures protected

☐ Public protection measures in place

ENGINEER'S CERTIFICATION:

"I certify that the steel structure and erection plan meet all applicable codes and standards. The structure

is designed to withstand construction loads with the specified temporary bracing."

Name: ______________ PE #: ______________ Date: ___________ Signature: ___________

Crane And Rigging Equipment Inspection - OSHA 29 Cfr 1926.1400

CRANE INFORMATION:

Crane Type: ______________ Manufacturer: ______________ Model: ______________

Capacity: ______ tons Configuration: ______________ Crane ID: ______________

Operator: ______________ Certification #: ______________ Expiry: ___________

Last Inspection: ___________ Next Inspection: ___________ Annual: ☐ Monthly: ☐ Daily: ☐

DAILY CRANE INSPECTION CHECKLIST: Item ________ Wire rope/hoist line Hook and latch Boom and jib Outriggers/pads Tires/tracks Hydraulics/leaks Controls Safety devices Load indicator Anti-two block Swing brake Lights/alarmsSatisfactory _____________
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
Defect Found _____________
☐
☐
☐
☐
☐ N/A
☐
☐
☐
☐
☐ N/A
☐
☐ N/A
Corrective Action ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________
RIGGING EQUIPMENT: Equipment Type ________ Slings (wire) Slings (synthetic) Shackles Turnbuckles Spreader bars Lifting lugs ChokersSize/Capacity ________ ________ _____________ ________ ________ ________ ________ ________Condition __________ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐Last Inspected ________ ________ ________ ________ ________ ________ ________ ________Next Inspected ________ ________ ________ ________ ________ ________ ________ ________Tag Color ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________

Rigger-in-charge: ______________ Certified? Yes ☐ No ☐ Certification #: ______________

Steel Erection Hazard Identification And Risk Assessment

HAZARDCAUSEPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (1-5)RISK RATING (L x S)
Structural Instability / Collapse-Inadequate temporary bracing
-Missing connections
-Unsecured columns
-Wind loading during erection
-Improper erection sequence
-Cascade collapse
-Multiple fatalities
-Crush injuries
-Equipment damage
-Schedule delays
-Erection sequence plan
-Temporary bracing design
-Guying
-Anchor bolt verification
-Progressive stability checks
3 (Occasional)5 (Catastrophic)15 (EXTREME)
Falls from Height-Unprotected edges
-Missing fall arrest system
-Improper tie-off
-Connector rods/beams without protection
-Slip on steel surfaces
-Fatalities
-Paralysis
-Broken bones
-Head injury
-Permanent disability
-Guardrails (permanent)
-Personal fall arrest system (PFAS)
-Safety nets
-Controlled decking zones
-Connector safety (6' rule)
5 (Frequent)5 (Catastrophic)25 (EXTREME)
Falling Objects-Unsecured tools
-Loose materials
-Spanner bags/bolts on beams
-Wind blowing materials
-Improper storage
-Crane loads
-Struck-by injuries
-Head injury
-Fatality
-Equipment damage
-Public injury
-Tool tethers
-Toeboards
-Debris nets
-Exclusion zones
-Barricades
-Material storage limits
-Canopies
-Hard hats (all workers)
5 (Frequent)4 (Critical)20 (EXTREME)
Crane Related Hazards-Overloading
-Improper rigging
-Swinging loads
-Two-blocking
-Power line contact
-Outrigger failure
-Poor communi- cation
-Crane tip
-Load drop
-Boom collapse
-Struck by load
-Electro- cution
-Crush injuries
-Lift plan for all critical lifts
-Rigging inspection
-Load indicators
-Tag lines
-Power line clearance (20' rule)
-Qualified operators
3 (Occasional)5 (Catastrophic)15 (EXTREME)
Bolting Operations-Improper bolt installation
-Incorrect bolt tension
-Tool kickback
-Ergonomics (awkward positions)
-Falling tools/bolts
-Connection failure
-Structural instability
-Injury from tool kickback
-Musculo- skeletal injuries
-Struck by falling objects
-Torque wrench calibration
-Turn-of-nut method
-Direct tension indicators
-Work positioning
-Tool tethers
4 (Probable)3 (Major)12 (HIGH)
Welding Operations-Fire/ explosion
-Arc flash
-Fumes/gas exposure
-Electrical shock
-Compressed gas cylinders
-Welding in rain/wet conditions
-Burns
-Eye damage (arc eye)
-Respiratory illness
-Electro- cution
-Explosion
-Hot work permit
-Fire watch required
-Welding screens
-PPE (hood, gloves, leathers)
-Ventilation
-Cylinder storage
3 (Occasional)4 (Critical)12 (HIGH)
Decking Operations-Open openings
-Unsecured deck sheets
-Wind lifting sheets
-Lack of fall protection
-Inadequate decking sequence
-Fall through
-Falls
-Struck by materials
-Crush injuries
-Cut hazards (sharp edges)
-Controlled decking zones
-Cover openings
-Securing deck sheets immediately
-Fall protection at leading edge
4 (Probable)5 (Catastrophic)20 (EXTREME)
Adverse Weather-High wind (≥20 mph)
-Lightning
-Rain/ice/snow
-Extreme heat
-Poor visibility
-Loss of control of loads
-Crane instability
-Electro- cution
-Slips/falls
-Heat stress
-Hypothermia
-Wind monitoring
-Work suspension criteria (wind ≥20 mph stop lifts, ≥30 mph stop all)
-Lightning safety (30/30 rule)
3 (Occasional)4 (Critical)12 (HIGH)

Critical Lift Plan - OSHA 29 Cfr 1926.1400

LIFT ID: ______________ DATE: ______________ TIME: ______________

DESCRIPTION: ______________

LOAD DETAILS:

Piece: ______________ Weight: ______ tons Dimensions: ______ x ______ x ______

Center of gravity location: ______________

Lift radius: ______ ft Lift height: ______ ft Boom angle: ______ degrees

Crane capacity at this radius/angle: ______ tons % of capacity: ______%

RIGGING DETAILS:

Sling type/size: ______________ Sling capacity: ______ tons # of slings: ______

Sling angle: ______ degrees Reduction factor: ______ Effective capacity: ______ tons

Shackle size/capacity: ______________ Lifting lug capacity: ______ tons

Spreader beam required? Yes ☐ No ☐ Capacity: ______ tons

PERSONNEL:

Lift Director: ______________ Crane Operator: ______________

Signal Person: ______________ Rigger: ______________

Safety Observer: ______________

SITE CONDITIONS:

Ground conditions: ______________ Outrigger pads: ______________

Overhead obstructions: ______________ Power line clearance: ______ ft

Weather conditions: Wind speed: ______ mph Visibility: Good ☐ Fair ☐ Poor ☐

COMMUNICATION:

Primary method: ☐ Radio (channel: ___) ☐ Hand signals ☐ Verbal ☐ Other: ______________

Backup method: ______________

Hand signal card posted? Yes ☐ No ☐

LIFT APPROVAL:

Lift Director: ______________ Date: ___________ Time: ___________

Crane Operator: ______________ Date: ___________ Time: ___________

Fall Protection For Steel Erection - OSHA 29 Cfr 1926.760

FALL PROTECTION REQUIREMENTS:

CONNECTORS (workers connecting steel):

☐ Fall protection required at heights > 15 feet (2 stories)

☐ Connectors must be protected from falls > 30 feet

☐ Connector safety: 100% tie-off when possible

☐ Connector training completed: Date: ___________

ALL OTHER WORKERS:

☐ Fall protection required at heights > 15 feet

☐ Guardrail systems ☐ Personal fall arrest systems ☐ Safety nets

☐ Positioning device systems

CONTROLLED DECKING ZONES (CDZ):

☐ CDZ established for initial decking operations

☐ CDZ boundaries clearly marked

☐ Only trained workers allowed in CDZ

☐ CDZ not to exceed 90 feet in width

☐ CDZ not to exceed 3 floors or 50 feet in height

☐ CDZ safety monitoring system in place

PERSONAL FALL ARREST SYSTEMS (PFAS):

Harness type: ______________ Manufacturer: ______________ Last inspected: ___________

Lanyard type: ☐ Shock-absorbing ☐ Self-retracting Length: ______ ft

Anchor points: ______________ Capacity: 5,000 lbs minimum

Clearance calculation: Free fall ≤ 6 ft, Total fall distance: ______ ft

Rescue plan for suspended workers: ______________

SAFETY NETS:

☐ Nets installed where fall hazards exist

☐ Drop test completed: Date: ___________ Results: Pass ☐ Fail ☐

☐ Nets extend 8-13 feet beyond edge

☐ No debris in nets

☐ Nets inspected weekly: Last inspection: ___________

Steel Erection Daily Checklist

INSPECTOR: ______________ DATE: ______________ TIME: ______________

WEATHER: ______________ WIND: ______ mph TEMP: ______°F/°C

INSPECTION ITEMSATISFACTORYDEFECT FOUNDCORRECTIVE ACTION
PRE-ERECTION:
1. Erection plan reviewed with crew
2. Crane pre-use inspection completed
3. Rigging equipment inspected
4. Anchor bolts/leveling plates checked
5. Site ground conditions adequate
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐
☐
________ ________ ________ ________ ________
STRUCTURAL STABILITY:
6. Erected steel plumb and level
7. Temporary bracing installed per plan
8. Connections properly made (bolts/welds)
9. No unsecured members
10. Structure stable before releasing crane
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐
☐
________ ________ ________ ________ ________
FALL PROTECTION:
11. Connectors tied-off where required
12. Other workers using fall protection
13. Anchor points adequate and identified
14. Leading edge protection in place
15. Safety nets installed (if used)
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐ N/A
☐
☐
☐ N/A
________ ________ ________ ________ ________
FALLING OBJECT PROTECTION:
16. Toeboards installed where required
17. Tool tethers in use
18. Debris nets/ canopies in place
19. Materials stored securely
20. Exclusion zones below work
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐ N/A
☐
☐
________ ________ ________ ________ ________
CRANE OPERATIONS:
21. Crane setup/outriggers adequate
22. Power line clearance maintained
23. Tag lines used on loads
24. Load chart and capacity limits observed
25. Communications effective
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐ N/A
☐
☐
☐
________ ________ ________ ________ ________
HOUSEKEEPING:
26. Work areas clear of debris
27. Bolts/tools stored properly
28. Walkways and access clear
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
________ ________ ________

OVERALL ASSESSMENT:

Is steel erection safe to continue? Yes ☐ No ☐ (If No, stop work immediately)

CORRECTIVE ACTIONS TAKEN:

______________

______________

FOREMAN SIGNATURE: ______________ DATE: ___________

Connection Completion Log

COLUMN/GRID ________ ________ ________ ________ ________ ________CONNECTION TYPE ________ ________ ________ ________ ________ ________BOLTS INSTALLED ________ ________ ________ ________ ________ ________TORQUE VALUE ____________ ____________ ____________ ____________ ____________ ____________INSPECTED __________ __________ __________ __________ __________ __________ACCEPTED _________ _________ _________ _________ _________ _________DATE ___________ ___________ ___________ ___________ ___________ ___________
WELD INSPECTION LOG: Weld ID _______ _______Type _____ _____Size _____ _____Visual Insp ___________ ___________NDT Method __________ __________NDT Results ___________ ___________Accepted ________ ________Inspector __________ __________Date ___________ ___________

Steel Erection PPE Requirements

REQUIRED PPE:

☐ Hard hat (with chin strap if working at height)

☐ Safety glasses with side shields

�| High-visibility vest

☐ Steel-toed boots (with non-slip soles)

�| Leather gloves (for handling steel)

☐ Hearing protection (near cranes/equipment)

☐ Full body harness with lanyard (fall protection)

☐ Welding PPE (hood, gloves, leathers) - as required

☐ Face shield (for grinding/cutting)

☐ Sun protection

TOOL TETHERS:

Required for all tools at height? Yes ☐ No ☐

Tether type: ☐ Lanyard ☐ Retractable ☐ Bungee

Approved for tool weight? Yes ☐ No ☐

Steel Erection Emergency Response Plan

POTENTIAL EMERGENCIES:

☐ Structural collapse ☐ Fall from height ☐ Crane accident ☐ Fire/explosion

☐ Medical emergency ☐ Electrical contact ☐ Welding fire ☐ Severe weather

☐ Suspended worker rescue

EMERGENCY CONTACTS:

EMERGENCY: 911

Site Safety Officer: ______________ Phone: ______________

Erection Supervisor: ______________ Phone: ______________

Project Manager: ______________ Phone: ______________

Nearest Hospital: ______________ Phone: ______________

RESCUE PROCEDURES FOR SUSPENDED WORKERS:

1. Assess situation - DO NOT become victim

2. Call 911 - advise of suspended worker

3. Communicate with suspended worker

4. Initiate pre-planned rescue:

☐ Self-rescue (descender device)

☐ Aerial lift rescue

☐ Crane rescue with personnel basket

☐ Wait for emergency services

5. Provide first aid after rescue

6. Complete incident report

RESCUE EQUIPMENT LOCATION:

Rescue descender: ______________

Personnel basket: ______________

Ladder: ______________

First aid kit: ______________

STRUCTURAL COLLAPSE PROCEDURES:

1. Clear area immediately - evacuate to assembly point

2. Account for all personnel

3. Call 911 - advise of collapse and potential trapped workers

4. DO NOT re-enter structure - wait for emergency services

5. Secure perimeter - prevent unauthorized access

EVACUATION ROUTES:

Primary: ______________

Secondary: ______________

Assembly Point: ______________

Steel Erection Training And Competency

TRAINING REQUIREMENTS - OSHA 29 CFR 1926.761

TOPIC ________ Steel Erection Safety Orientation Fall Protection for Steel Erectors Connector Safety Crane and Rigging Safety Critical Lift Procedures Bolting/Welding Procedures Site-Specific Erection Plan Emergency ProceduresTRAINER ________ ________ ________ ________ ________ ________ ________ ________ ________DATE ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ATTENDEES ________ ________ ________ ________ ________ ________ ________ ________ ________

COMPETENT PERSON DESIGNATION:

Name: ______________ Title: ______________ Experience: ______ years

Responsibilities:

☐ Daily inspections of steel erection operations

☐ Verify temporary bracing installation

☐ Ensure fall protection compliance

☐ Identify and correct hazards

☐ Stop work when unsafe conditions exist

CRANE OPERATOR CERTIFICATION:

Name: ______________ Cert #: ______________ Expiry: ___________

Name: ______________ Cert #: ______________ Expiry: ___________

RIGGER CERTIFICATION:

Name: ______________ Cert #: ______________ Level: Basic ☐ Advanced ☐

SIGNAL PERSON CERTIFICATION:

Name: ______________ Qualified by: ______________ Date: ___________

Steel Erection Permit And Authorizations

PERMIT TYPE ________ Crane Use Permit Critical Lift Permit Hot Work Permit (welding) Steel Erection Permit Overheight TransportISSUING AUTHORITY ________ ________ ________ ________ ________ ________PERMIT # _____________ _____________ _____________ _____________ _____________ _____________ISSUE DATE ___________ ___________ ___________ ___________ ___________ ___________EXPIRY DATE ___________ ___________ ___________ ___________ ___________ ___________

NOTIFICATIONS COMPLETED:

☐ OSHA (if applicable) Date: ___________ Confirmation #: ______________

�| Local authorities (road closures) Date: ___________ Contact: ______________

☐ Adjacent property owners Date: ___________ Method: ______________

Steel Erection Risk Assessment Summary

OVERALL RISK ASSESSMENT:

Based on the identified hazards and existing controls, the overall risk level for this steel erection is:

☐ LOW - Routine erection with minimal hazards, controls adequate

☐ MEDIUM - Moderate hazards, requires ongoing monitoring

☐ HIGH - Significant hazards, requires active controls and frequent inspection

☐ EXTREME - Severe hazards, requires engineering controls and specialized oversight

CRITICAL CONTROLS REQUIRED:

1. ______________

2. ______________

3. ______________

4. ______________

5. ______________

WORK STOPPING AUTHORITY:

All personnel have the authority and responsibility to stop work if conditions become unsafe.

Stop work protocol: Notify supervisor immediately, secure area, correct condition before resuming.

Certification And Approval

ERECTION SUPERVISOR:

"I have reviewed this risk assessment and confirm that all identified hazards have been addressed with

appropriate controls. All required permits and notifications are complete."

Name: ______________ Signature: ______________ Date: ___________

PROJECT MANAGER:

"I approve the steel erection plan and risk assessment. Resources are allocated for all required controls."

Name: ______________ Signature: ______________ Date: ___________

SAFETY OFFICER:

"I have verified that all safety requirements are met and that steel erection can proceed safely."

Name: ______________ Signature: ______________ Date: ___________

CRANE OPERATOR:

"I have reviewed the lift plan and confirm that I understand my role in safe steel erection."

Name: ______________ Signature: ______________ Date: ___________

NEXT REVIEW DATE: ______________