Free Scaffolding Risk Assessment template for construction you can edit online and download as PDF. Covers scaffold project information, scaffold design and engineering - osha 29 cfr 1926.451(a), scaffold component inspection.
ASSESSMENT ID: SCF-__________ DATE: ______________ TIME: ______________
PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________
SCAFFOLD TYPE:
☐ Supported ☐ Suspended ☐ Mobile ☐ Frame ☐ System ☐ Tube & Clamp ☐ Pole
☐ Pump Jack ☐ Ladder Jack ☐ Mast Climber ☐ Other: ______________
SCAFFOLD DIMENSIONS:
Height: ______ m/ft Length: ______ m/ft Width: ______ m/ft # of Tiers: ______
Maximum Load Capacity: ______ kg (lbs) Intended Load: ______ kg (lbs)
SCAFFOLD ERECTOR: ______________ COMPETENT PERSON: ______________
ERECTION DATE: ______________ LAST INSPECTION: ______________ NEXT INSPECTION: ______________
DESIGN REQUIREMENTS:
☐ Designed by qualified person: ______________ Date: ___________
☐ Design drawings available: Yes ☐ No ☐ Drawing #: ______________
☐ Load calculations completed: Yes ☐ No ☐ Capacity: ______ psf (kPa)
☐ Wind load considerations: Yes ☐ No ☐ Max wind speed: ______ mph
SCAFFOLD CLASSIFICATION:
☐ Light Duty (25 lbs/ft²) ☐ Medium Duty (50 lbs/ft²) ☐ Heavy Duty (75 lbs/ft²)
☐ Special Duty (designed for specific loads): ______________
ENGINEERING CERTIFICATION:
"I certify that this scaffold design meets all applicable OSHA requirements and is safe for the intended
use when erected according to these specifications."
Name: ______________ PE #: ______________ Date: ___________ Signature: ___________
| COMPONENT ________ Frames Cross Braces Base Plates Screw Jacks Guardrails Midrails Toeboards Planks/Decks Couplers/Clamps Access Ladder | MANUFACTURER ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ | MODEL ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ | CONDITION ________ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ | RATING ____________ ______ lbs ______ lbs ______ lbs ______ lbs ______ lbs ______ lbs ______ lbs ______ lbs ______ lbs ______ lbs | REPLACEMENT DATE ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ |
|---|
INSPECTION FINDINGS:
______________
______________
INSPECTED BY: ______________ DATE: ___________
FOUNDATION TYPE:
☐ Concrete slab ☐ Compacted gravel ☐ Asphalt ☐ Soil ☐ Mud sills ☐ Other: ______________
FOUNDATION ASSESSMENT:
Bearing capacity: ______ psf (kPa) Required capacity: ______ psf (kPa) Adequate? Yes ☐ No ☐
Level? Yes ☐ No ☐ Slope: ______ % Drainage adequate? Yes ☐ No ☐
Frost heave potential? Yes ☐ No ☐ Settlement observed? Yes ☐ No ☐
BASE PLATES AND MUD SILLS:
☐ Base plates installed on all legs ☐ Mud sills used (size: ______ x ______)
☐ Screw jacks adjusted for leveling ☐ Maximum screw jack extension: ______ inches (≤ 12" required)
☐ Base plates secured to prevent movement
ADJACENT CONDITIONS:
☐ Excavations nearby? Yes ☐ No ☐ Distance: ______ ft Protected? Yes ☐ No ☐
☐ Vehicle traffic nearby? Yes ☐ No ☐ Barriers in place? Yes ☐ No ☐
☐ Overhead hazards? Yes ☐ No ☐ Description: ______________
☐ Underground utilities? Yes ☐ No ☐ Locates completed? Yes ☐ No ☐
ERECTION/DISMANTLING PLAN:
Plan reference: ______________ Prepared by: ______________ Date: ___________
Sequence documented? Yes ☐ No ☐ Critical lifts identified? Yes ☐ No ☐
FALL PROTECTION DURING ERECTION:
☐ Personal fall arrest system required ☐ Lanyards with shock absorbers
☐ Anchor points identified: ______________
☐ Tie-off required at all times above ______ ft
☐ Fall protection plan for erectors: ______________
MATERIAL HANDLING:
☐ Crane/hoist used for material handling ☐ Manual hoisting ☐ Gin wheels
☐ Material hoist inspected? Yes ☐ No ☐ Date: ___________
☐ Hoist operator qualified? Yes ☐ No ☐ Name: ______________
☐ Tag lines used for swinging loads? Yes ☐ No ☐
☐ Material stacking limited to rated capacity
ERECTION TEAM:
Lead erector: ______________ Experience: ______ years Certified? Yes ☐ No ☐
Team members: ______________ ______________ ______________
Communication method: ☐ Hand signals ☐ Radio ☐ Verbal ☐ Other: ______________
| HAZARD | CAUSE | POTENTIAL CONSEQUENCE | EXISTING CONTROLS | LIKELIHOOD (1-5) | SEVERITY (1-5) | RISK RATING (L x S) |
|---|---|---|---|---|---|---|
| Scaffold Collapse | -Improper assembly -Overloading -Inadequate foundations -Missing components -Damaged parts -Inadequate ties | -Multiple fatalities -Crush injuries -Equipment damage -Adjacent property damage | -Engineered design -Competent person inspection -Load capacity signs -Tie-ins -Foundation preparation | 2 (Remote) | 5 (Catastrophic) | 10 (HIGH) |
| Falls from Height | -Missing guardrails -Unprotected edges -Unsafe access (ladders) -Slippery surfaces -Climbing cross braces -Ice/snow | -Fatalities -Paralysis -Broken bones -Head injury -Permanent disability | -Guardrails (top, mid, toeboard) -Personal fall arrest -Safe access (ladders, stairs) -Non-slip surfaces -Training | 4 (Probable) | 5 (Catastrophic) | 20 (EXTREME) |
| Falling Objects/ Tools | -No toeboards -Unsecured materials -Overhead work -Wind -Poor housekeeping | -Struck-by injuries -Head injury -Fatality -Property damage -Public injury | -Toeboards (4" min) -Debris nets -Tool tethers -Canopies -Barricades -Exclusion zones -Material storage limits | 4 (Probable) | 4 (Critical) | 16 (EXTREME) |
| Overloading | -Exceeding rated load -Material stockpiling -Concentrated loads -Dynamic loads (equipment) -Multiple workers | -Deck failure -Structural damage -Collapse -Injury | -Load capacity signs posted -Material management plan -Regular inspection -Training | 3 (Occasional) | 4 (Critical) | 12 (HIGH) |
| Electrical Hazards | -Contact with power lines -Energized equipment -Improper grounding -Damaged cords -Wet conditions | -Electrocution -Burns -Cardiac arrest -Fall from shock | -Maintain safe distance (10' for <50kV, more for higher) -Insulated tools -Power line de- energized or moved | 2 (Remote) | 5 (Catastrophic) | 10 (HIGH) |
| Instability (Overturning) | -Inadequate ties/guys -Wind loading -Eccentric loads -Mobile scaffold movement -Unlocked casters -Uneven ground | -Scaffold tipping -Fall of scaffold -Injury to workers -Property damage | -Tie-ins at required intervals -Height/ width ratio limits -Outriggers -Brakes locked -Wind monitoring | 3 (Occasional) | 4 (Critical) | 12 (HIGH) |
| Plank/Deck Failure | -Damaged planks -Improper span -Overloading -Not secured -Missing planks -Split wood planks | -Fall through -Injury -Collapse -Fatality | -Grade stamped planks -Proper overlap (12" min) -Secured to prevent movement -Regular inspection -Load limits | 3 (Occasional) | 4 (Critical) | 12 (HIGH) |
| Access Hazards | -Missing ladder -Improper ladder placement -Climbing braces -Icy/slippery rungs -No handhold access | -Fall while accessing scaffold -Trips -Musculoskeletal injuries | -Safe ladder access (extend 3' above platform) -Stairway towers -Gates on ladder openings | 4 (Probable) | 4 (Critical) | 16 (EXTREME) |
| Adverse Weather | -Wind -Rain -Ice/Snow -Extreme heat -Lightning -High winds | -Loss of balance -Slips/falls -Reduced visibility -Hypothermia -Heat stress -Lightning strike | -Weather monitoring -Work suspension criteria -Non-slip surfaces -Tie-offs in high winds | 3 (Occasional) | 3 (Major) | 9 (MEDIUM) |
SUSPENDED SCAFFOLD TYPE:
☐ Two-point (swing stage) ☐ Multi-point ☐ Boatswain's chair ☐ Catenary ☐ Float
SUSPENSION EQUIPMENT:
Hoist type: ☐ Electric ☐ Manual ☐ Air
Rated capacity: ______ lbs Serial #: ______________ Last test date: ___________
Wire rope: Diameter: ______ Condition: Good ☐ Fair ☐ Poor ☐ Replacement date: ___________
OUTRIGGER BEAMS/CORNER BEAMS:
☐ Secured against movement ☐ Counterweights installed ☐ Tied back to structure
☐ Vertical pickup points used ☐ Stop bolts installed
FALL PROTECTION FOR SUSPENDED SCAFFOLDS:
☐ Independent lifeline required ☐ Personal fall arrest system ☐ Tied off to structure
☐ Lanyard length limited to prevent hitting lower level
STABILITY REQUIREMENTS:
☐ Scaffold level ☐ Guardrails in place ☐ Toeboards installed
☐ Platform secured to hangers ☐ Maximum platform deflection: ______ inches
MOBILE SCAFFOLD TYPE:
☐ Rolling tower ☐ Manual propelled ☐ Powered ☐ Work platform
DIMENSIONS:
Height: ______ ft Base width: ______ ft Base length: ______ ft
Height to base width ratio: ______ (max 4:1 when stationary, 3:1 when moving)
CASTERS AND WHEELS:
☐ Locking casters with positive locks ☐ Swivel locks engaged when stationary
☐ Casters rated for load ☐ Condition: Good ☐ Fair ☐ Poor ☐
MOVING PROCEDURES:
☐ Workers removed before moving ☐ Materials secured ☐ Pushed at base only
☐ Surface clear of debris/holes ☐ Level surface only ☐ Obstructions removed
STABILIZATION:
☐ Outriggers installed (if required) ☐ Screw jacks adjusted to level
☐ Ties or guys required at height? Yes ☐ No ☐
GUARDRAIL SYSTEMS:
☐ Top rail: Height 42-45 inches Condition: ______________ Installed on all open sides
☐ Mid rail: Height ~21 inches Condition: ______________ Installed on all open sides
☐ Toeboard: 4 inches minimum Condition: ______________ Installed on all open sides
☐ Posts: Spacing ≤ 8 feet Condition: ______________
☐ Guardrails capable of withstanding 200 lbs force
PERSONAL FALL ARREST SYSTEMS (PFAS):
☐ PFAS required when guardrails not feasible ☐ Full body harness
☐ Lanyard with shock absorber ☐ Self-retracting lifeline (SRL)
☐ Anchor points: ______________ Rated capacity: 5,000 lbs
☐ Clearance calculation: Free fall ≤ 6 ft, Total fall distance: ______ ft
☐ Rescue plan in place: ______________
SAFETY NETS:
☐ Nets installed when guardrails/PFAS not feasible ☐ Drop test completed
☐ Nets extend 8-13 feet from edge ☐ No debris in nets
INSPECTOR: ______________ DATE: ______________ TIME: ______________
COMPETENT PERSON DESIGNATION: Yes ☐ No ☐ TRAINING CURRENT: Yes ☐ No ☐
| INSPECTION ITEM | SATISFACTORY | DEFECT FOUND | CORRECTIVE ACTION |
|---|---|---|---|
| PRE-USE INSPECTION: 1. Scaffold level and plumb 2. Base plates/sills in place and undamaged 3. Screw jacks extended properly (≤ 12") 4. Frames vertical and properly connected 5. Cross braces installed and secured | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ N/A ☐ ☐ | ________ ________ ________ ________ ________ |
| GUARDRAILS AND FALL PROTECTION: 6. Top rails in place (42-45") 7. Mid rails in place (~21") 8. Toeboards installed (4") 9. Access ladder/stairs safe and secure 10. No missing planks or open holes | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ ☐ | ________ ________ ________ ________ ________ |
| PLANKING/DECKS: 11. Planks in good condition (no splits, cracks) 12. Planks properly overlapped (12" min) 13. Planks secured to prevent movement 14. Full decking provided on work levels 15. No cantilevered planks unless designed | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ N/A ☐ ☐ ☐ | ________ ________ ________ ________ ________ |
| TIES AND BRACING: 16. Ties installed at required intervals (max 26') 17. Ties secured to structure 18. Guys/bracing adequate for height | ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ N/A | ________ ________ ________ |
| LOADS AND CAPACITY: 19. Load capacity signs posted 20. Materials stored within capacity limits 21. No excessive concentrated loads | ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ | ________ ________ ________ |
| ELECTRICAL SAFETY: 22. Safe distance from power lines (>10') 23. Electrical cords in good condition 24. Tools properly grounded/GFCI protected | ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ | ________ ________ ________ |
| HOUSEKEEPING: 25. Platforms clear of debris/tripping hazards 26. Materials stored neatly 27. Access clear and unobstructed | ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ | ________ ________ ________ |
OVERALL ASSESSMENT:
Is scaffold safe for use? Yes ☐ No ☐ (If No, tag out and remove from service)
CORRECTIVE ACTIONS TAKEN:
______________
______________
INSPECTOR SIGNATURE: ______________ DATE: ___________
| DATE ___________ ___________ ___________ ___________ ___________ | INSPECTOR ________ ________ ________ ________ ________ | SHIFT Day ☐ Night ☐ Day ☐ Night ☐ Day ☐ Night ☐ Day ☐ Night ☐ Day ☐ Night ☐ | CONDITIONS ____________ ____________ ____________ ____________ ____________ | DEFECTS FOUND _____________ _____________ _____________ _____________ _____________ | CORRECTIVE ACTION ________ ________ ________ ________ ________ | SIGNATURE ________ ________ ________ ________ ________ |
|---|
CURRENT SCAFFOLD STATUS:
☐ GREEN TAG - SAFE FOR USE
Date: ___________ Inspector: ______________
Capacity: ______ psf Last inspection: ___________
☐ YELLOW TAG - CAUTION - RESTRICTED USE
Restriction: ______________
Date: ___________ Inspector: ______________
☐ RED TAG - UNSAFE - DO NOT USE
Reason: ______________
Date: ___________ Inspector: ______________
TAG LOCATION: ______________ TAG #: ______________
PERMIT TYPE: ☐ Erection ☐ Dismantling ☐ Modification ☐ Relocation
PERMIT #: SCF-P-__________ DATE: ______________ TIME: ______________
SCAFFOLD ID/LOCATION: ______________
WORK DESCRIPTION: ______________
REQUIREMENTS VERIFIED:
☐ Competent person on site: ______________
☐ Erection plan reviewed
☐ Fall protection available and inspected
☐ Tools and equipment inspected
☐ Materials inspected
☐ Weather conditions suitable (wind < 25 mph)
☐ Area below barricaded
☐ Overhead hazards identified
☐ Electrical hazards identified
☐ Communication system established
☐ Emergency response plan reviewed
☐ First aid kit available
☐ Fire extinguisher available
AUTHORIZED WORKERS:
1. ______________ 2. ______________ 3. ______________
4. ______________ 5. ______________ 6. ______________
I CONFIRM THAT ALL SAFETY REQUIREMENTS HAVE BEEN MET AND WORK CAN PROCEED SAFELY.
SUPERVISOR: ______________ SIGNATURE: ______________ DATE: ___________
COMPETENT PERSON: ______________ SIGNATURE: ______________ DATE: ___________
PERMIT VALID: FROM: ___________ TO: ___________ EXTENDED: Yes ☐ No ☐ NEW EXPIRY: ___________
TRAINING REQUIREMENTS:
All employees working on scaffolds must be trained by a qualified person to recognize hazards and
understand procedures to control or minimize those hazards.
| EMPLOYEE NAME ________ ________ ________ ________ | JOB ROLE ________ ________ ________ ________ | TRAINING TOPICS ________ ________ ________ ________ | DATE ___________ ___________ ___________ ___________ | TRAINER ________ ________ ________ ________ |
|---|
COMPETENT PERSON DESIGNATION:
Name: ______________ Title: ______________ Experience: ______ years
Training completed:
☐ OSHA scaffold competent person training Date: ___________ Provider: ______________
☐ Specific scaffold type training Date: ___________ Type: ______________
☐ Fall protection training Date: ___________
☐ Hazard identification training Date: ___________
☐ Emergency procedures training Date: ___________
COMPETENT PERSON DUTIES:
☐ Daily scaffold inspections
☐ Oversee erection/dismantling
☐ Train employees on scaffold safety
☐ Identify and correct hazards
☐ Stop work when unsafe conditions exist
POTENTIAL EMERGENCIES:
☐ Scaffold collapse ☐ Fall from height ☐ Electrical contact ☐ Medical emergency
☐ Severe weather ☐ Fire ☐ Tool/material strike ☐ Rescue situation
EMERGENCY CONTACTS:
EMERGENCY: 911
Site Safety Officer: ______________ Phone: ______________
Competent Person: ______________ Phone: ______________
Project Manager: ______________ Phone: ______________
Nearest Hospital: ______________ Phone: ______________
RESCUE PROCEDURES FOR FALL ARREST:
1. Assess situation - DO NOT become victim
2. Call 911 - advise of suspended worker
3. Attempt to communicate with suspended worker
4. Initiate pre-planned rescue:
☐ Self-rescue (if possible)
☐ Aerial lift rescue
☐ Ladder rescue
☐ Mechanical hoist rescue
☐ Wait for emergency services
5. Provide first aid after rescue
6. Complete incident report
RESCUE EQUIPMENT LOCATION: ______________
SCAFFOLD EVACUATION PROCEDURES:
1. Stop work immediately
2. Descend using safe access
3. Move to assembly point: ______________
4. Account for all personnel
5. Report to supervisor
OVERALL RISK ASSESSMENT:
Based on the identified hazards and existing controls, the overall risk level for this scaffold is:
☐ LOW - Scaffold properly erected, maintained, and used within design parameters
☐ MEDIUM - Moderate hazards present, requires ongoing monitoring
☐ HIGH - Significant hazards identified, requires immediate corrective action
☐ EXTREME - Unsafe conditions present - DO NOT USE
CRITICAL CONTROLS REQUIRED:
1. ______________
2. ______________
3. ______________
4. ______________
5. ______________
MONITORING FREQUENCY:
☐ Continuous monitoring required ☐ Daily inspection ☐ Weekly inspection ☐ Pre-use inspection
☐ Competent person inspection frequency: ______________
WORK STOPPING AUTHORITY:
All personnel have the authority and responsibility to stop work if conditions become unsafe.
Stop work protocol: Notify supervisor immediately, tag scaffold red, secure area.
COMPETENT PERSON:
"I have inspected this scaffold and confirm that it has been erected according to design specifications
and is safe for use. All required controls are in place."
Name: ______________ Signature: ______________ Date: ___________
SCAFFOLD SUPERVISOR:
"I have reviewed this risk assessment and confirm that all workers have been trained and understand
the hazards and controls."
Name: ______________ Signature: ______________ Date: ___________
PROJECT MANAGER:
"I approve the use of this scaffold for the intended work activities."
Name: ______________ Signature: ______________ Date: ___________
NEXT INSPECTION DATE: ______________