Roofing Operations Risk Assessment template

Free Roofing Operations Risk Assessment template for construction you can edit online and download as PDF. Covers 29 cfr 1926 subpart q - concrete, roofing, roofing project information, fall protection plan - osha 29 cfr 1926.500

29 Cfr 1926 Subpart Q - Concrete, Roofing

Roofing Project Information

ASSESSMENT ID: ROOF-__________ DATE: ______________ TIME: ______________

PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________

ROOF TYPE:

☐ Low-Slope (<4:12) ☐ Steep-Slope (≥4:12) ☐ Flat ☐ Metal ☐ Shingle ☐ Tile ☐ Membrane

☐ Built-Up ☐ Modified Bitumen ☐ TPO/PVC ☐ EPDM ☐ Green Roof ☐ Other: ______________

BUILDING DETAILS:

Height: ______ m/ft Number of Stories: ______ Roof Area: ______ m²/ft²

Roof Pitch: ______ :12 Eave Height: ______ m/ft Parapet Height: ______ m/ft

ROOFING CONTRACTOR: ______________ SUPERVISOR: ______________

PROJECT START DATE: ______________ ESTIMATED COMPLETION: ______________

Fall Protection Plan - OSHA 29 Cfr 1926.500 - 1926.503

FALL PROTECTION REQUIREMENTS:

☐ Fall protection required for all work > 6 feet

☐ Written fall protection plan available

☐ Plan specifically addresses roofing operations

☐ Plan reviewed with all workers pre-project

☐ Competent person designated for fall protection

Name: ______________ Date of designation: ___________

FALL PROTECTION SYSTEMS SELECTED:

PRIMARY SYSTEM:

☐ Guardrail Systems

- Top rail @ 42" (±3") - Mid rail - Toeboards

- Capable of withstanding 200 lbs force

☐ Personal Fall Arrest Systems (PFAS)

- Full body harnesses

- Shock-absorbing lanyards or self-retracting lifelines (SRLs)

- Anchor points (5,000 lbs capacity)

- Anchors pre-planned and identified: ______________

- Clearance calculations completed

☐ Safety Net Systems

- Installed as close as possible (max 30' below)

- Extend 8-13' beyond edge

- Drop-tested after installation

☐ Warning Line Systems (low-slope roofs only)

- Lines at least 6' from edge

- Stanchions securely fastened

- Warning lines醒目ly visible

☐ Safety Monitoring Systems (low-slope roofs only, ≤ 50' width)

- Competent safety monitor designated

- Monitor on same roof, in visual contact

- Monitor authorized to stop work

SECONDARY SYSTEMS (as backup):

☐ Catch platforms ☐ Controlled access zones ☐ Hole covers

FALL PROTECTION EQUIPMENT INSPECTION: Equipment Type ________ Full Body Harness Lanyard (6') SRL Anchor Straps Guardrail Sections Warning Line StanchionsQuantity ________ ________ ________ ________ ________ ________ ________Last Inspected ________ ________ ________ ________ ________ ________ ________Next Inspected ________ ________ ________ ________ ________ ________ ________Condition ________ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐ Good ☐ Replace ☐

Roof Access And Material Handling

ROOF ACCESS:

Access Method:

☐ Ladder (fixed) ☐ Ladder (portable) ☐ Stairway ☐ Scaffold ☐ Aerial lift ☐ Hoist

☐ Other: ______________

LADDER SAFETY (if used):

☐ Ladder extends 3' above roof edge

☐ Ladder secured at top and bottom

☐ Ladder on stable, level surface

☐ Ladder angle correct (4:1)

☐ Ladder inspected daily

☐ Workers maintain 3-point contact

MATERIAL HANDLING:

Material Delivery:

☐ Crane/hoist to roof ☐ Conveyor ☐ Ladder (hand-carry) ☐ Forklift ☐ Other: ______________

ROOFTOP MATERIAL STORAGE:

☐ Storage areas designated away from edges

☐ Materials stacked securely (no tipping)

☐ Weight limits established (roof load capacity)

☐ Roof load capacity verified: ______ psf

☐ Maximum stack height: ______

☐ Materials protected from wind

☐ No materials stored within 6' of edge (unless guarded)

☐ Access pathways maintained

MATERIAL HOISTING:

☐ Hoist inspected and certified

☐ Hoist operator trained

☐ Communication system established

☐ Load limit posted and observed

☐ Exclusion zone below hoist

☐ Tag lines used for swinging loads

Roofing Operations Hazard Identification And Risk Assessment

HAZARDCAUSEPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (1-5)RISK RATING (L x S)
Falls from Roof Edge-Unprotected edges
-No fall protection
-Warning line too close
-Slip/trip at edge
-Roof edge collapse
-Fatalities
-Paralysis
-Broken bones
-Head injury
-Permanent disability
-Guardrails
-PFAS
-Safety nets
-Warning lines
-Safety monitor
-Training
-Edge awareness
5 (Frequent)5 (Catastrophic)25 (EXTREME)
Falls Through Openings-Skylights
-Roof openings
-Holes for HVAC/vent
-Uncovered openings
-Weak roof deck
-Deteriorated skylight materials
-Fall through
-Fatalities
-Crush injuries
-Paralysis
-Skylight screens or guards
-Covers secured and marked
-Barricades around openings
-PFAS near openings
4 (Probable)5 (Catastrophic)20 (EXTREME)
Material Handling (Hoisting)-Lifting materials to roof
-Carrying bundles up ladder
-Manual lifting of heavy bundles
-Wind blowing materials
-Struck-by falling materials
-Crush injuries
-Back injury
-Musculo- skeletal disorders
-Mechanical lifts
-Tag lines
-Exclusion zone below
-Team lifting
-Proper body mechanics
-Hoist inspection
4 (Probable)4 (Critical)16 (EXTREME)
Roof Integrity Failure-Weak roof deck
-Overloading (materials)
-Deteriorated structure
-Hidden damage
-Unsupported areas
-Ponding water (added weight)
-Collapse
-Fall through
-Multiple fatalities
-Crush injuries
-Equipment damage
-Load calculation
-Structural assessment
-Material staging away from weak areas
-Reinforcing if needed
-Daily inspection
2 (Remote)5 (Catastrophic)10 (HIGH)
Hot Work (Torches, Kettles)-Torches
-Kettles (hot asphalt)
-Flammable materials
-Gas cylinders (propane)
-Spontaneous combustion
-Wind blowing flames/sparks
-Fire
-Explosion
-Burns
-Property damage
-Inhalation of fumes
-Hot work permit
-Fire watch (during + 30 min after)
-Extinguishers (ABC type)
-Combustible clearance (35' min)
-Propane storage away from work area
3 (Occasional)5 (Catastrophic)15 (EXTREME)
Weather Conditions-High wind (≥15-20 mph)
-Rain
-Ice/Snow
-Extreme heat
-Lightning
-Loss of balance
-Falls
-Slips
-Wind blowing materials off roof
-Heat stress
-Hypothermia
-Lightning strike
-Weather monitoring
-Work suspension policy
-Non-slip footwear
-Hydration stations
-Shade/ rest breaks
4 (Probable)4 (Critical)16 (EXTREME)
Ladder Safety-Improper ladder placement
-Unsecured ladder
-Overreaching
-Carrying materials while climbing
-Defective ladder
-Fall from ladder
-Fractures
-Head injury
-Paralysis
-Ladder inspection
-Proper setup (4:1)
-Tie-off at top
-3-point contact
-Tool hoist line (not hands)
4 (Probable)4 (Critical)16 (EXTREME)
Power Tools (Nail Guns, Saws)-Nail guns
-Circular saws
-Roof cutters
-Kickback
-Electrical shock
-Dust (silica)
-Puncture wounds
-Lacerations
-Amputation
-Eye injury
-Hearing damage
-Respiratory illness
-Tool guards
-Sequential triggers
-GFCI protection
-Safety glasses
-Hearing protection
-Dust mask/ respirator
4 (Probable)3 (Major)12 (HIGH)
Chemical Exposure-Adhesives
-Solvents
-Primers
-Cleaning agents
-Inhalation of fumes
-Skin contact
-Skin irritation
-Respiratory irritation
-Dizziness
-Nausea
-Chemical burns
-SDS available
-Ventilation
-Gloves
-Respirators (if needed)
-Eye protection
-Wash facilities
3 (Occasional)2 (Minor)6 (MEDIUM)

Roof Anchor System - Personal Fall Arrest

ANCHOR POINT INFORMATION:

Anchor Type: ☐ Permanent roof anchor ☐ Temporary roof anchor ☐ Counterweight ☐ Beam clamp

☐ Parapet anchor ☐ Other: ______________

Anchor Manufacturer: ______________ Model: ______________

Anchor Capacity: 5,000 lbs (minimum) Certification: ______________

ANCHOR LOCATIONS: Anchor ID _________ _________ _________ _________ _________Location ________ ________ ________ ________ ________Installation Date ________ ________ ________ ________ ________Inspected __________ __________ __________ __________ __________Max Users __________ __________ __________ __________ __________Notes ________ ________ ________ ________ ________

ANCHOR INSPECTION:

☐ Anchors inspected before each use

☐ Visual check for damage/corrosion

☐ Connections secure

☐ No loose fasteners

☐ Load testing completed (if required)

Last inspection date: ___________ Inspector: ______________

Next inspection due: ___________

CONNECTING DEVICES:

☐ Shock-absorbing lanyards (6') - Last inspected: ___________

☐ Self-retracting lifelines (SRLs) - Last inspected: ___________

☐ Rope grabs - Last inspected: ___________

☐ Cross-arm straps - Last inspected: ___________

CLEARANCE CALCULATIONS:

Roof Edge Distance: ______ ft Free Fall Distance: ______ ft Total Fall Distance: ______ ft

Clearance Required: ______ ft Clearance Available: ______ ft Adequate? Yes ☐ No ☐

Swing Fall Hazard Assessed? Yes ☐ No ☐ Mitigation: ______________

Hot Work / Torch Operations Safety

HOT WORK PERMIT:

Permit #: ______________ Date: ______________ Time: ______________ TO: ______________

Authorized By: ______________ Expiry: ______________

WORK DESCRIPTION: ______________

FIRE PREVENTION:

☐ Combustible materials removed from area (35' minimum)

☐ Non-combustible covers used for remaining combustibles

☐ Roof deck protected from heat

☐ Fire extinguishers (ABC) in work area: Quantity: ______ Last inspected: ___________

☐ Fire watch assigned: Name(s): ______________

☐ Fire watch remains during work + 30 minutes after

☐ Water hose available and connected

☐ Fire alarm activation notified (if applicable)

☐ Sprinkler system in service (if applicable)

GAS CYLINDER SAFETY:

☐ Cylinders secured upright

☐ Cylinders stored away from work area

☐ Caps on when not in use

☐ Hoses inspected - no leaks

☐ Flashback arrestors installed

☐ Proper torches with working valves

PPE FOR HOT WORK:

☐ Face shield ☐ Leather gloves ☐ Long sleeves ☐ Leather apron ☐ Fire-resistant clothing

POST-WORK CHECK:

☐ Area inspected for hot spots/smoldering

☐ Fire watch duration completed: ______ minutes

☐ Final inspection time: ___________ By: ______________

Roofing Operations Daily Checklist

INSPECTOR: ______________ DATE: ______________ TIME: ______________

WEATHER: Temp: ______ Wind: ______ mph Conditions: ☐ Clear ☐ Rain ☐ Snow ☐ Ice

INSPECTION ITEMSATISFACTORYDEFECT FOUNDCORRECTIVE ACTION
PRE-WORK:
1. Job briefing completed with crew
2. Fall protection plan reviewed
3. Weather conditions safe for work
4. Hot work permit issued (if applicable)
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐ N/A
________ ________ ________ ________
FALL PROTECTION:
5. Guardrails in place and secure (if used)
6. Warning lines set back 6' from edge (if used)
7. PFAS equipment inspected (harness/lanyard)
8. Anchor points inspected and secure
9. Safety monitor designated and on roof (if used)
10. All workers tied-off where required
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ N/A
☐ N/A
☐ N/A
☐ N/A
☐ N/A
☐
________ ________ ________ ________ ________ ________
ROOF OPENINGS:
11. Skylights guarded or covered
12. Roof openings covered/secured
13. Hole covers marked "HOLE" or "COVER"
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
________ ________ ________
ACCESS & MATERIALS:
14. Ladders secure and properly set up
15. Materials stored safely (away from edge)
16. Roof load capacity not exceeded
17. Material hoisting area barricaded below
18. Pathways clear for movement
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐ N/A
☐
________ ________ ________ ________ ________
HOT WORK (if applicable):
19. Combustibles cleared (35' minimum)
20. Fire extinguishers in place
21. Fire watch assigned and present
22. Gas cylinders secured and hoses good
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ N/A
☐ N/A
☐ N/A
☐ N/A
________ ________ ________ ________
PPE:
23. Hard hats being worn
24. Safety glasses being worn
25. Hearing protection worn (if required)
26. Gloves appropriate for task
27. Non-slip footwear worn
28. Sun protection (hat, sunscreen) as needed
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐
☐
☐ N/A
________ ________ ________ ________ ________ ________

OVERALL ASSESSMENT:

Is roofing work safe to continue? Yes ☐ No ☐ (If No, stop work immediately)

CORRECTIVE ACTIONS TAKEN:

______________

FOREMAN SIGNATURE: ______________ DATE: ___________

Roofing Operations PPE Requirements

BASE PPE (ALL ROOFING WORK):

☐ Hard hat (with chin strap if working at height)

☐ Safety glasses with side shields (or tinted for sun)

☐ High-visibility vest (as required)

☐ Steel-toed boots with non-slip soles

☐ Work gloves (leather or task-specific)

☐ Hearing protection (when using power tools)

☐ Sunscreen (SPF 30+)

☐ Long sleeves (for sun protection)

FALL PROTECTION PPE:

☐ Full body harness (properly fitted)

☐ Shock-absorbing lanyard (6') or SRL

☐ Anchor strap/connector

☐ Positioning lanyard (if used)

HOT WORK PPE:

☐ Face shield

☐ Leather welding gloves

☐ Leather apron or sleeves

☐ Fire-resistant clothing

☐ Leather boots (no synthetic materials)

WEATHER-RELATED PPE:

☐ Rain gear

☐ Cold weather gear (insulated, layered)

☐ Sun hat with neck protection

☐ Cooling vest (for extreme heat)

☐ Hydration pack/water bottles

Roofing Operations Emergency Response Plan

POTENTIAL EMERGENCIES:

☐ Fall from roof ☐ Fall through skylight ☐ Fire (torch/kettle)

☐ Heat stroke/stress ☐ Lightning strike ☐ Severe weather (high wind)

☐ Ladder fall ☐ Material dropped on worker ☐ Medical emergency

☐ Kettle asphalt burn ☐ Propane explosion ☐ Roof collapse

EMERGENCY CONTACTS:

EMERGENCY: 911

Site Safety Officer: ______________ Phone: ______________

Roofing Supervisor: ______________ Phone: ______________

Project Manager: ______________ Phone: ______________

Nearest Hospital: ______________ Phone: ______________

Poison Control: 1-800-222-1222

FALL FROM HEIGHT EMERGENCY PROCEDURES:

1. Call 911 immediately - advise "fall from height"

2. DO NOT move victim unless in immediate danger (fire, etc.)

3. Check for consciousness, breathing, bleeding

4. If trained, provide first aid - control bleeding, keep neck stable

5. Keep victim calm and warm

6. Clear area for emergency responders

7. Designate someone to meet ambulance and direct to scene

8. Preserve area for investigation

SUSPENDED WORKER RESCUE PROCEDURES (after fall arrest):

1. Assess situation - DO NOT become victim

2. Communicate with suspended worker

3. Initiate rescue immediately (suspension trauma risk)

4. Rescue options:

☐ Self-rescue (if worker can ascend)

☐ Aerial lift rescue

☐ Ladder rescue

☐ Crane with personnel basket

☐ Wait for emergency services (if rapid response)

5. After rescue, lay worker flat, elevate legs

6. Seek medical evaluation even if no symptoms

FIRE EMERGENCY PROCEDURES:

1. Sound alarm - call 911

2. If safe, use fire extinguisher (PASS technique)

3. Evacuate roof immediately - use designated ladder/stairs

4. Account for all personnel at assembly point

5. Shut off propane/gas sources if safe

6. Do not re-enter building until cleared

HEAT STRESS EMERGENCY PROCEDURES:

1. Move victim to cool/shaded area

2. Remove excess clothing

3. Cool with water, fans, ice packs (neck, armpits, groin)

4. Provide cool water if conscious

5. If unconscious or confused, call 911 immediately

FIRST AID KIT LOCATION: ______________

EYE WASH STATION LOCATION: ______________ (if chemicals used)

BURN KIT LOCATION: ______________

FIRE EXTINGUISHER LOCATION: ______________

ASSEMBLY POINT: ______________

Roofing Operations Training And Qualifications

TRAINING REQUIREMENTS:

All workers must be trained in:

☐ Fall protection systems and procedures

☐ Roof-specific hazards

☐ Ladder safety

☐ Material handling

☐ Hot work safety (if applicable)

☐ Emergency procedures

☐ First aid/CPR (supervisors)

TRAINING LOG: EMPLOYEE NAME ________ ________ ________ ________ ________FALL PROTECTION ________ ________ ________ ________ ________LADDER SAFETY _____________ _____________ _____________ _____________ _____________HOT WORK _________ _________ _________ _________ _________DATE ___________ ___________ ___________ ___________ ___________TRAINER ________ ________ ________ ________ ________

COMPETENT PERSON DESIGNATION:

Name: ______________ Title: ______________ Experience: ______ years

Responsibilities:

☐ Daily roof inspections

☐ Verify fall protection systems

☐ Monitor weather conditions and stop work if unsafe

☐ Ensure hot work safety

☐ Identify and correct hazards

☐ Stop work when unsafe conditions exist

Roofing Operations Risk Assessment Summary

OVERALL RISK ASSESSMENT:

Based on the identified hazards and existing controls, the overall risk level for this roofing operation:

☐ LOW - Low-slope roof, good access, minimal hazards, controls adequate

☐ MEDIUM - Moderate slope, some edge exposure, requires ongoing monitoring

☐ HIGH - Steep slope, significant fall hazards, requires strict controls

☐ EXTREME - Severe hazards (steep slope, high height, torch work) - requires specialized oversight

CRITICAL CONTROLS REQUIRED:

1. ______________

2. ______________

3. ______________

4. ______________

5. ______________

WORK STOPPING AUTHORITY:

All personnel have the authority and responsibility to stop work if conditions become unsafe.

Stop work protocol: Notify supervisor immediately, secure area, correct condition before resuming.

Specific stop work conditions:

- Wind speeds > 15-20 mph (depending on material)

- Lightning within 10 miles (30/30 rule)

- Wet/icy conditions

- Any fall protection deficiency

- Any fire hazard

Certification And Approval

ROOFING SUPERVISOR:

"I have reviewed this risk assessment and confirm that all roofing work will be performed in accordance

with OSHA requirements and safe work practices. All workers are trained and fall protection is in place."

Name: ______________ Signature: ______________ Date: ___________

SAFETY OFFICER:

"I have verified that all safety requirements are met and that roofing operations can proceed safely."

Name: ______________ Signature: ______________ Date: ___________

PROJECT MANAGER:

"I approve the roofing work and risk assessment."

Name: ______________ Signature: ______________ Date: ___________

NEXT REVIEW DATE: ______________