ASSESSMENT ID: MECH-__________ DATE: ______________ TIME: ______________
PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________
INSTALLATION TYPE:
☐ HVAC Equipment ☐ Piping Systems ☐ Pumps ☐ Compressors ☐ Conveyors ☐ Elevators/Escalators
☐ Boilers/Pressure Vessels ☐ Tanks ☐ Generators ☐ Turbines ☐ Material Handling ☐ Other: ________
EQUIPMENT DETAILS:
Equipment: ______________ Manufacturer: ______________ Model: ______________
Weight: ______ kg (lbs) Dimensions: ______ x ______ x ______ Lifting Points: Yes ☐ No ☐
Operating Pressure: ______ psi Temperature: ______ °C/°F Rotating Equipment: Yes ☐ No ☐
MECHANICAL CONTRACTOR: ______________ SUPERVISOR: ______________
MANUFACTURER REPRESENTATIVE: ______________ INSTALLATION START: ______________
ENGINEERING DOCUMENTS:
☐ Equipment specifications available
☐ Installation drawings available Drawing #: ______________
☐ P&ID diagrams available Drawing #: ______________
☐ Foundation/structural drawings Drawing #: ______________
☐ Rigging/lift plan prepared Lift plan #: ______________
☐ Manufacturer installation manual available
☐ Sequence of installation documented
SITE PREPARATION:
☐ Foundation inspected and approved Date: ___________ By: ______________
☐ Anchor bolts verified (location/size)
☐ Grouting materials available
☐ Access for equipment delivery verified
☐ Crane/rigging setup area prepared
☐ Temporary utilities available (power/water/air)
☐ Weather protection in place (if required)
COORDINATION:
☐ Other trades coordinated (electrical, piping, structural)
☐ Sequence of installation coordinated
☐ Testing requirements defined
☐ Commissioning plan prepared
ENGINEER'S CERTIFICATION (if required):
"I certify that the installation meets all applicable codes and manufacturer requirements."
Name: ______________ PE #: ______________ Date: ___________ Signature: ___________
LIFT INFORMATION:
Lift ID: ______________ Date: ______________ Time: ______________
Equipment: ______________ Weight: ______ tons Center of Gravity Marked? Yes ☐ No ☐
Lift Radius: ______ ft Lift Height: ______ ft Crane Capacity: ______ tons % Capacity: ______%
CRANE DETAILS:
Crane Type: ______________ Capacity: ______ tons Configuration: ______________
Operator: ______________ Certification #: ______________
Rigging Foreman: ______________ Signal Person: ______________
| RIGGING DETAILS: Component ________ Slings (wire) Slings (synthetic) Shackles Spreader Bar Lifting Lugs Turnbuckles Eye Bolts | Size/Capacity ________ ________ ________ ________ ________ ________ ________ ________ | Condition __________ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ | Inspection Date ________ ________ ________ ________ ________ ________ ________ ________ | Certified? __________ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ |
|---|
LIFT PROCEDURES:
☐ Pre-lift meeting conducted with all personnel
☐ Test lift performed (6 inches) to verify rigging
☐ Tag lines used to control load
☐ Communication method established (radio channel: ___)
☐ Emergency stop signal understood by all
☐ Exclusion zone established below lift
☐ Spotter positioned to monitor clearances
APPROVALS:
Lift Director: ______________ Date: ___________ Time: ___________
Crane Operator: ______________ Date: ___________ Time: ___________
Safety Observer: ______________ Date: ___________ Time: ___________
| HAZARD | CAUSE | POTENTIAL CONSEQUENCE | EXISTING CONTROLS | LIKELIHOOD (1-5) | SEVERITY (1-5) | RISK RATING (L x S) |
|---|---|---|---|---|---|---|
| Heavy Lifting & Rigging Hazards | -Inadequate lift plan -Crane overload -Improper rigging -Sling failure -Load shifting -Center of gravity unknown | -Crush injuries -Fatalities -Equipment damage -Structural damage -Drop load | -Lift plan -Qualified rigger -Certified crane operator -Inspected rigging -Tag lines -Exclusion zone | 3 (Occasional) | 5 (Catastrophic) | 15 (EXTREME) |
| Pressure Testing Hazards | -Over- pressurization -Air in system -Rapid pressurization -Testing with improper medium -Inadequate isolation | -Explosion -Pipe/equip rupture -Projectile debris -Struck-by injuries -Fatalities | -Test procedure -Pressure relief valves -Gradual pressure increase -Exclusion zone -Remote monitoring | 2 (Remote) | 5 (Catastrophic) | 10 (HIGH) |
| Heavy Equipment Handling | -Manual lifting -Awkward positioning -Pinch points -Falling equipment -Unstable placement | -Back injury -Musculo- skeletal disorders -Crush injuries -Struck by equipment | -Mechanical lifting aids -Team lifting (2+ persons) -Proper body mechanics -Work rotation -Anti-fatigue mats | 4 (Probable) | 3 (Major) | 12 (HIGH) |
| HVAC Installation Hazards | -Ductwork handling -Overhead duct install -Ladder work -Aerial lifts -Drilling for supports -Sheet metal edges | -Cuts from sharp metal -Shoulder/ back strain -Fall from height -Eye injury from debris | -Gloves -Long sleeves -Mechanical lifts for heavy sections -Proper ladder safety -Safety glasses | 4 (Probable) | 2 (Minor) | 8 (MEDIUM) |
| Piping Installation Hazards | -Pipe fitting (alignment) -Threading pipes -Welding pipe joints -Soldering/ brazing -Heavy pipe sections -Swinging pipe | -Pinch/crush injuries -Cuts from threads -Burns -Fire -Fume inhalation -Ergonomic strain | -Pipe supports during fitting -Threading machines with guards -Hot work permit -Pipe stands -Chain hoists | 4 (Probable) | 3 (Major) | 12 (HIGH) |
| Rotating Equipment (Pumps/Fans/ Compressors) | -Coupling | parts | -Guards in | | | | -Startup testing -Alignment procedures installation -Vibration testing -Lack of guarding | -Entanglement -Amputation -Struck by rotating -Projectile debris -Hearing damage | -Lockout/ Tagout during installation place -Alignment procedures with machine stopped -Hearing protection | 2 (Remote) | 5 (Catastrophic) | 10 (HIGH) |
| Welding & Hot Work | -Arc flash -Sparks -Hot metal -Fumes/gas exposure -Compressed gas cylinders -Welding in confined spaces | -Eye damage (arc eye) -Burns -Fire -Explosion -Respiratory illness -Electro- cution | -Welding screens -Welding PPE (hood, gloves, leathers) -Ventilation -Fire watch -Hot work permit -Gas detectors | 3 (Occasional) | 3 (Major) | 9 (MEDIUM) |
| Mechanical Equipment Alignment | -Heavy tools (torque wrenches) -Precision adjustments -Laser alignment -Feeler gauges -Repeated bending | -Shoulder/ back strain -Pinch points -Hand/foot injuries -Eye injury from laser exposure -Musculo- skeletal disorders | -Tool balancers -Team lifting -Proper ergonomics -Laser safety glasses -Work rotation | 4 (Probable) | 2 (Minor) | 8 (MEDIUM) |
| Confined Spaces (Tanks, Vessels, Ductwork) | -Entry into tanks/vessels -Atmospheric hazards -Engulfment -Mechanical equipment inside -Rescue difficulties | -Oxygen deficiency -Toxic atmosphere -Explosion -Entrapment -Asphyxiation -Fatalities | -Permit- required confined space program -Continuous air monitoring -Ventilation -Attendant outside -Rescue plan | 2 (Remote) | 5 (Catastrophic) | 10 (HIGH) |
TEST INFORMATION:
System/Component: ______________ Test Pressure: ______ psi Test Medium: ______________
Test Date: ______________ Start Time: ______________ End Time: ______________
Test Supervisor: ______________ Test Technician: ______________
PRE-TEST CHECKS:
☐ Test procedure reviewed and approved
☐ All connections/welds completed and inspected
☐ All supports and anchors in place
☐ Temporary supports added (if required)
☐ System isolated from other equipment
☐ Pressure relief valve installed (set at test pressure + 10% max)
☐ Test gauges calibrated (range: 2x test pressure)
☐ Gauges visible from safe location
☐ Bleeders/vents installed at high points
☐ Exclusion zone established (radius: ______ ft)
☐ Warning signs posted: "PRESSURE TEST IN PROGRESS - KEEP OUT"
☐ Barricades in place
☐ Communication system tested
DURING TEST:
☐ Pressurize slowly - monitored continuously
☐ All personnel outside exclusion zone during pressurization
☐ No one allowed in zone until pressure stabilized
☐ Visual inspection conducted from safe distance
☐ Pressure recorded at regular intervals: ______ minutes
☐ Soap solution used to check for leaks (no flames)
EMERGENCY PROCEDURES (if rupture occurs):
1. Immediately isolate pressure source
2. DO NOT enter area until pressure fully relieved
3. Account for all personnel
4. Provide first aid if needed
5. Investigate cause before re-testing
POST-TEST:
☐ Pressure relieved slowly
☐ System drained/vented
☐ Test results recorded
☐ Test report completed
☐ System returned to normal configuration
TEST RESULTS:
☐ PASS - No leaks, no deformation
☐ FAIL - Issues identified: ______________
Corrective actions: ______________
Retest required: Yes ☐ No ☐ New test date: ___________
TEST SUPERVISOR SIGNATURE: ______________ DATE: ___________
INSPECTOR: ______________ DATE: ______________ TIME: ______________
WEATHER: ______________ WORK AREA: ______________
| INSPECTION ITEM | SATISFACTORY | DEFECT FOUND | CORRECTIVE ACTION |
|---|---|---|---|
| PRE-WORK: 1. Job briefing completed with crew 2. Hazard assessment reviewed 3. All workers trained for task 4. Permits in place (hot work, confined space, etc.) | ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ N/A | ________ ________ ________ ________ |
| EQUIPMENT & TOOLS: 5. Tools inspected and in good condition 6. Rigging equipment inspected (daily) 7. Welding equipment inspected 8. Lifting equipment inspected 9. Testing equipment calibrated | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ N/A ☐ N/A ☐ N/A ☐ N/A | ________ ________ ________ ________ ________ |
| WORK AREA: 10. Work area clean and organized 11. Adequate lighting provided 12. Ventilation adequate (welding, solvents) 13. Fire extinguishers accessible 14. Exits/egress clear 15. Barricades/signs in place (testing, lifts) | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ N/A ☐ ☐ ☐ N/A | ________ ________ ________ ________ ________ ________ |
| FALL PROTECTION: 16. Ladders safe and properly used 17. Aerial lift inspected and fall protection used 18. Scaffold safe and inspected 19. Guardrails in place where required | ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ N/A ☐ N/A ☐ N/A | ________ ________ ________ ________ |
| PPE: 20. Hard hats being worn 21. Safety glasses being worn 22. Hearing protection worn (if required) 23. Gloves appropriate for task 24. Welding PPE used (if welding) 25. Respirators used (if required) | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ ☐ N/A ☐ N/A | ________ ________ ________ ________ ________ ________ |
| INSTALLATION QUALITY: 26. Equipment properly aligned 27. Connections properly torqued 28. Supports/anchors adequate 29. Piping/ductwork properly supported 30. Clearances maintained | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ ☐ | ________ ________ ________ ________ ________ |
OVERALL ASSESSMENT:
Is mechanical installation safe to continue? Yes ☐ No ☐ (If No, stop work immediately)
CORRECTIVE ACTIONS TAKEN:
______________
FOREMAN SIGNATURE: ______________ DATE: ___________
BASE PPE (ALL MECHANICAL WORK):
☐ Hard hat
☐ Safety glasses with side shields
☐ High-visibility vest (as required)
☐ Steel-toed boots
☐ Work gloves (leather)
☐ Hearing protection (when near loud equipment)
TASK-SPECIFIC PPE:
RIGGING/LIFTING:
☐ Leather gloves ☐ Steel-toed boots ☐ Hard hat ☐ High-visibility vest
WELDING/HOT WORK:
☐ Welding hood (auto-darkening or fixed shade)
☐ Welding gloves (leather, gauntlet style)
☐ Leather jacket/sleeves
☐ Leather apron (for heavy welding)
☐ Welding cap (under hood)
☐ Safety glasses under hood
☐ Ear plugs (under ear muffs if loud)
☐ Respirator (if ventilation inadequate)
☐ Flame-resistant (FR) clothing
☐ Leather boots (no synthetic materials)
GRINDING/CUTTING:
☐ Face shield (over safety glasses)
☐ Leather gloves ☐ Long sleeves ☐ Hearing protection
CONFINED SPACE:
☐ Full body harness with retrieval line
☐ Atmospheric monitor
☐ Respirator (if required)
☐ Hard hat with chin strap
☐ Lighting (explosion-proof if required)
PRESSURE TESTING:
☐ Safety glasses ☐ Face shield ☐ Hearing protection ☐ Leather gloves
POTENTIAL EMERGENCIES:
☐ Rigging failure/dropped load ☐ Pressure test rupture ☐ Fire/explosion
☐ Confined space emergency ☐ Welding flash/fire ☐ Chemical spill
☐ Equipment tip-over ☐ Crush injury ☐ Medical emergency
☐ Entanglement in rotating equipment
EMERGENCY CONTACTS:
EMERGENCY: 911
Site Safety Officer: ______________ Phone: ______________
Mechanical Supervisor: ______________ Phone: ______________
Project Manager: ______________ Phone: ______________
Nearest Hospital: ______________ Phone: ______________
Poison Control: 1-800-222-1222
RIGGING FAILURE/DROPPED LOAD PROCEDURES:
1. Clear area immediately - evacuate to assembly point
2. Account for all personnel - check for injuries
3. Call 911 if injuries - advise "dropped load with crush injuries"
4. DO NOT attempt to move victim unless immediate danger
5. Secure area - prevent unauthorized access
6. Preserve scene for investigation
7. Notify supervisor and safety officer immediately
CONFINED SPACE EMERGENCY PROCEDURES:
1. DO NOT ENTER - most rescuers become victims
2. Call 911 immediately - advise "confined space emergency"
3. Activate ventilation to maximum
4. Attempt to communicate with victim
5. Retrieve victim using retrieval line if attached and conscious
6. Wait for trained rescue team - provide information about space
7. Have SDS available for any chemicals involved
PRESSURE TEST RUPTURE PROCEDURES:
1. Immediately isolate pressure source
2. DO NOT enter area until pressure fully relieved
3. Account for all personnel
4. Call 911 if injuries - advise "high pressure rupture"
5. Provide first aid for projectile injuries (do not remove embedded objects)
6. Secure area - investigate cause
FIRST AID KIT LOCATION: ______________
EYE WASH STATION LOCATION: ______________
BURN KIT LOCATION: ______________
FIRE EXTINGUISHER LOCATION: ______________
EMERGENCY SHUTOFF LOCATION: ______________
ASSEMBLY POINT: ______________
| QUALIFIED PERSONNEL: Role ________ Rigging Supervisor Crane Operator Welder Welder Pipefitter Millwright HVAC Technician Confined Space Attendant | Name ________ ________ ________ ________ ________ ________ ________ ________ ________ | Certification # ________ ________ ________ ________ ________ ________ ________ ________ ________ | Expiry Date ________ ________ ________ ________ ________ ________ ________ ________ ________ |
|---|---|---|---|
| TRAINING REQUIREMENTS: TOPIC ________ Mechanical Installation Safety Rigging & Lifting Safety Pressure Testing Safety Confined Space Entry Hot Work / Welding Safety Lockout/Tagout Fall Protection Emergency Procedures | TRAINER ________ ________ ________ ________ ________ ________ ________ ________ ________ | DATE ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ | ATTENDEES ________ ________ ________ ________ ________ ________ ________ ________ ________ |
COMPETENT PERSON DESIGNATION:
Name: ______________ Title: ______________ Experience: ______ years
Responsibilities:
☐ Daily mechanical installation inspections
☐ Verify rigging/lift plans followed
☐ Ensure pressure testing procedures followed
☐ Monitor confined space entries
☐ Identify and correct hazards
☐ Stop work when unsafe conditions exist
| PERMIT TYPE ________ Critical Lift Permit Hot Work Permit Confined Space Entry Pressure Test Permit Lockout/Tagout Boiler/Pressure Vessel Installation Permit | ISSUING AUTHORITY ________ ________ ________ ________ ________ ________ ________ | PERMIT # _____________ _____________ _____________ _____________ _____________ _____________ _____________ | ISSUE DATE ___________ ___________ ___________ ___________ ___________ ___________ ___________ | EXPIRY DATE ___________ ___________ ___________ ___________ ___________ ___________ ___________ |
|---|
NOTIFICATIONS COMPLETED:
☐ Manufacturer notified of installation start Date: ___________ Contact: ______________
☐ Inspector notified for hold points Date: ___________ Inspection scheduled: ___________
☐ Other trades coordinated Date: ___________ Details: ______________
OVERALL RISK ASSESSMENT:
Based on the identified hazards and existing controls, the overall risk level for this mechanical installation:
☐ LOW - Routine installation with minimal hazards, controls adequate
☐ MEDIUM - Moderate hazards, requires ongoing monitoring
☐ HIGH - Significant hazards (heavy lifts, pressure tests), requires strict controls
☐ EXTREME - Severe hazards - requires engineering controls and specialized oversight
CRITICAL CONTROLS REQUIRED:
1. ______________
2. ______________
3. ______________
4. ______________
5. ______________
WORK STOPPING AUTHORITY:
All personnel have the authority and responsibility to stop work if conditions become unsafe.
Stop work protocol: Notify supervisor immediately, secure area, correct condition before resuming.
MECHANICAL SUPERVISOR:
"I have reviewed this risk assessment and confirm that all mechanical work will be performed in accordance
with manufacturer requirements, codes, and safe work practices."
Name: ______________ Signature: ______________ Date: ___________
SAFETY OFFICER:
"I have verified that all safety requirements are met and that mechanical installation can proceed safely."
Name: ______________ Signature: ______________ Date: ___________
PROJECT MANAGER:
"I approve the mechanical installation work and risk assessment."
Name: ______________ Signature: ______________ Date: ___________
NEXT REVIEW DATE: ______________