Free Excavation Permit (Enhanced) template for construction you can edit online and download as PDF. Covers permit information, hazard identification, precautions & control measures.
PTW REFERENCE: PTW-______________ DATE: ______________
PROJECT NAME: ______________ NO. OF EMPLOYEES INVOLVED: _____
STARTING FROM: ______________ DATE: ______________ TIME: ______________
EXPECTED COMPLETION: ______________ DATE: ______________ TIME: ______________
EXCAVATION / TRENCH TYPE: ☐ Excavation ☐ Trench ☐ Pit ☐ Foundation ☐ Test Pit
DIMENSIONS: Depth: ______________ m Length: ______________ m Width: ______________ m
WORK DESCRIPTION: ______________
______________
LOCATION OF JOB TO BE PERFORMED: ______________
TOOLS/EQUIPMENT TO BE USED: ______________
______________
Identify risk associated with this Excavation:
☐ Personnel Falling ☐ Underground Utilities ☐ Biological ☐ Noise
☐ Falling Objects/Equipment ☐ Cave-in (Collapse) ☐ Dust ☐ Vibration
☐ Flood / Water ☐ Adjacent Structure ☐ Heat ☐ Traffic
☐ Equipment Roll-over ☐ Hazardous Atmosphere ☐ Confined Space ☐ Overhead Power Lines
☐ Toxic Gases ☐ Oxygen Deficiency ☐ Flammable Gas ☐ Access/Egress
OTHER HAZARDS (Specify): ______________
______________
| Precaution require to complete the work safely | Yes | No | N/A |
|---|---|---|---|
| Is method statement attached with this permit? Is risk assessment attached with this permit? Are the equipments/machineries inspected and valid certification available? Is operator certification/license valid? Is the hard barrier given and safe distance (at least 1 meter from edge) maintained? Is soil type identified? | ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ |
Soil Type Identified:
☐ Stable Rock - Competent, intact rock mass
☐ Type A Soil - Cohesive soils with high compressive strength (clay, silty clay, etc.)
☐ Type B Soil - Cohesive soils with medium compressive strength (silt, sandy loam, etc.)
☐ Type C Soil - Granular soils (sand, gravel, etc.) or submerged soil
Soil Conditions: ☐ Dry ☐ Moist ☐ Wet / Saturated ☐ Frozen ☐ Previously disturbed
Soil Classified By: ______________ Date: ______________
Will the excavation be 1.5m (5 feet) or more deep? ☐ Yes ☐ No
Will personnel be entering the excavation? ☐ Yes ☐ No
If YES to both, control measures implemented:
☐ SHORING - Type: ☐ Hydraulic ☐ Timber ☐ Steel Sheet Piling ☐ Screw Jacks
Details: ______________
☐ SHIELDING - Trench Box Size: _______ m (L) x _______ m (H)
Trench Box Certified: ☐ Yes ☐ No Cert Date: ______________
☐ SLOPING - Slope Ratio: ______ : 1 (H:V) Angle: ______ degrees
Based on soil type: ☐ Type A (3/4:1) ☐ Type B (1:1) ☐ Type C (1½:1)
☐ BENCHING - Type: ☐ Single ☐ Multiple Bench Width: ______ m Height: ______ m
Details: ______________
______________
Will the excavation be 6m (20 feet) or more deep? ☐ Yes ☐ No
If YES, Name of Professional Engineer: ______________
License #: ______________ Date of Design: ______________
Engineering Drawings Reference: ______________
Are underground utilities checked by means of appropriate detector through as-built drawings?
Utilities Checked and Marked at Work Location:
☐ Electrical ☐ Sewer ☐ Communications ☐ Storm Water
☐ Gas Line ☐ Water ☐ Petroleum ☐ Other: ______________
Detection Method Used: ☐ Electromagnetic Locator ☐ GPR ☐ Both ☐ Other: ______________
As-built Drawings Reviewed: ☐ Yes ☐ No Drawing #: ______________
If underground utilities found, is trial hole system (manual digging) followed? ☐ Yes ☐ No
Trial holes completed at: ☐ Utility crossings ☐ Along entire length ☐ Other: ______________
Utilities Verification By: ______________ Date: ______________
The following areas / items have been inspected by issuer and receiver:
| ITEM | STATUS | COMMENTS |
|---|---|---|
| Access / Egress Danger / Warning Signs Lighting / Flickering (if required) Flag Man / Spotter (if required) Multi-Gas Detector As-built Drawings Hard Barrier (1m from edge) Spoil Pile Placement Equipment/Machinery - Condition Emergency Procedures Posted First Aid Kit | Adequate ☐ Not In Place ☐ Not Adequate ☐ Not Assigned ☐ Not Available ☐ Not Available ☐ Not In Place ☐ Not >1m ☐ <1m ☐ Good ☐ Fault ☐ Yes ☐ No ☐ Present ☐ Not | ________ ________ ________ Name: ______________ Model: ______________ Drawing #: ______________ Distance: _____ m from edge Distance: _____ m from edge ________ ________ Location: ______________ |
OTHER ITEMS (Specify):
______________
INSPECTED BY (Issuer): ______________ DATE: ______________ TIME: ______________
INSPECTED BY (Receiver): ______________ DATE: ______________ TIME: ______________
TEST EQUIPMENT DETAILS:
Gas Detector Model: ______________ Serial #: ______________ Calibration Date: ______________
ACCEPTANCE CRITERIA:
• Oxygen (O2): 19.5% - 23.5% • Lower Explosive Limit (LEL): < 10%
• Hydrogen Sulfide (H2S): < 10 ppm • Carbon Monoxide (CO): < 25 ppm
| TIME | LOCATION | O2 % | LEL % | H2S (ppm) | CO (ppm) | TESTED BY | ||
|---|---|---|---|---|---|---|---|---|
| ______ ______ | ___________ ___________ | _______ _______ | _______ _______ | _______ _______ | _______ _______ | ________ ________ |
TESTED BY: ______________ DATE: ______________ TIME: ______________
Are adequate inspection systems followed:
☐ During excavation - continuous inspection by Competent Person
☐ After excavation - final inspection before leaving
☐ During backfilling - inspection of utility protection
☐ After backfilling - final inspection and sign-off
COMPETENT PERSON (Daily Inspections):
Name: ______________ Date: ______________
Signature: ______________
PPE Required for the activity:
MANDATORY PPE:
☐ Helmet / Hard hat ☐ Safety Shoes / Steel-toed boots ☐ Reflective Vest
☐ Safety Goggles / Glasses ☐ Mechanical Gloves ☐ Safety Ear Plugs / Muffs
ADDITIONAL PPE (as required):
☐ Dust Mask / Respirator (Type: ______________) ☐ Gumboot / Rubber Boots
☐ Safety Harness / Fall Arrest ☐ High Visibility Clothing
☐ Face Shield ☐ Chemical Suit / Coveralls ☐ Sun Protection
☐ Other: ______________ ☐ Other: ______________ ☐ Other: ______________
PPE VERIFIED BY: ______________ DATE: ______________ TIME: ______________
PERMIT RECEIVER (Confirms understanding of hazards and controls):
I certify that I have read and verified this excavation permit and checklist. I am aware of the
risks associated with excavation work and will follow all safety rules.
Name: ______________ Signature: ______________ Date: ___________
PERMIT ISSUER (Authorizes work to proceed):
I have reviewed the excavation checklist and checked the working conditions. I am satisfied
that all control measures are in place and the activity is authorized to proceed.
Name: ______________ Signature: ______________ Date: ___________
COMPETENT PERSON (Confirms soil classification and protective systems):
I have classified the soil and inspected the protective systems. They are adequate for safe work.
Name: ______________ Signature: ______________ Date: ___________
SAFETY OFFICER (Verifies controls in place):
Name: ______________ Signature: ______________ Date: ___________
EXCAVATION COMPLETED: Date: ______________ Time: ______________
BACKFILLING REQUIRED? ☐ Yes ☐ No
If Yes:
☐ Utilities protected / inspected before backfill
☐ Backfill material: ☐ Native ☐ Imported ☐ Gravel ☐ Sand
☐ Compaction performed: ☐ Mechanical ☐ Hand ☐ Water
SITE RESTORATION:
☐ Area graded / leveled
☐ Spoil piles removed
☐ Barricades / signs removed
☐ Surface restored
FINAL INSPECTION BY COMPETENT PERSON:
Signature: ______________ Date: ______________
AREA HANDOVER TO OPERATIONS:
Name: ______________ Signature: ______________ Date: ___________
THIS PERMIT IS VALID ONLY FOR THE DATE AND TIME SPECIFIED - ONE SHIFT ONLY