Excavation Permit (Enhanced) template

Free Excavation Permit (Enhanced) template for construction you can edit online and download as PDF. Covers permit information, hazard identification, precautions & control measures.

Permit Information

PTW REFERENCE: PTW-______________ DATE: ______________

PROJECT NAME: ______________ NO. OF EMPLOYEES INVOLVED: _____

STARTING FROM: ______________ DATE: ______________ TIME: ______________

EXPECTED COMPLETION: ______________ DATE: ______________ TIME: ______________

EXCAVATION / TRENCH TYPE: ☐ Excavation ☐ Trench ☐ Pit ☐ Foundation ☐ Test Pit

DIMENSIONS: Depth: ______________ m Length: ______________ m Width: ______________ m

WORK DESCRIPTION: ______________

______________

LOCATION OF JOB TO BE PERFORMED: ______________

TOOLS/EQUIPMENT TO BE USED: ______________

______________

Hazard Identification

Identify risk associated with this Excavation:

☐ Personnel Falling ☐ Underground Utilities ☐ Biological ☐ Noise

☐ Falling Objects/Equipment ☐ Cave-in (Collapse) ☐ Dust ☐ Vibration

☐ Flood / Water ☐ Adjacent Structure ☐ Heat ☐ Traffic

☐ Equipment Roll-over ☐ Hazardous Atmosphere ☐ Confined Space ☐ Overhead Power Lines

☐ Toxic Gases ☐ Oxygen Deficiency ☐ Flammable Gas ☐ Access/Egress

OTHER HAZARDS (Specify): ______________

______________

Precautions & Control Measures

Precaution require to complete the work safelyYesNoN/A
Is method statement attached with this permit? Is risk assessment attached with this permit? Are the equipments/machineries inspected and valid certification available? Is operator certification/license valid? Is the hard barrier given and safe distance (at least 1 meter from edge) maintained? Is soil type identified?☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐

Soil Classification

Soil Type Identified:

☐ Stable Rock - Competent, intact rock mass

☐ Type A Soil - Cohesive soils with high compressive strength (clay, silty clay, etc.)

☐ Type B Soil - Cohesive soils with medium compressive strength (silt, sandy loam, etc.)

☐ Type C Soil - Granular soils (sand, gravel, etc.) or submerged soil

Soil Conditions: ☐ Dry ☐ Moist ☐ Wet / Saturated ☐ Frozen ☐ Previously disturbed

Soil Classified By: ______________ Date: ______________

Protective Systems (For Excavations ≥ 1.5M / 5 Feet Deep)

Will the excavation be 1.5m (5 feet) or more deep? ☐ Yes ☐ No

Will personnel be entering the excavation? ☐ Yes ☐ No

If YES to both, control measures implemented:

☐ SHORING - Type: ☐ Hydraulic ☐ Timber ☐ Steel Sheet Piling ☐ Screw Jacks

Details: ______________

☐ SHIELDING - Trench Box Size: _______ m (L) x _______ m (H)

Trench Box Certified: ☐ Yes ☐ No Cert Date: ______________

☐ SLOPING - Slope Ratio: ______ : 1 (H:V) Angle: ______ degrees

Based on soil type: ☐ Type A (3/4:1) ☐ Type B (1:1) ☐ Type C (1½:1)

☐ BENCHING - Type: ☐ Single ☐ Multiple Bench Width: ______ m Height: ______ m

Details: ______________

______________

Deep Excavation Requirements (≥ 6M / 20 Feet)

Will the excavation be 6m (20 feet) or more deep? ☐ Yes ☐ No

If YES, Name of Professional Engineer: ______________

License #: ______________ Date of Design: ______________

Engineering Drawings Reference: ______________

Underground Utilities Check

Are underground utilities checked by means of appropriate detector through as-built drawings?

Utilities Checked and Marked at Work Location:

☐ Electrical ☐ Sewer ☐ Communications ☐ Storm Water

☐ Gas Line ☐ Water ☐ Petroleum ☐ Other: ______________

Detection Method Used: ☐ Electromagnetic Locator ☐ GPR ☐ Both ☐ Other: ______________

As-built Drawings Reviewed: ☐ Yes ☐ No Drawing #: ______________

If underground utilities found, is trial hole system (manual digging) followed? ☐ Yes ☐ No

Trial holes completed at: ☐ Utility crossings ☐ Along entire length ☐ Other: ______________

Utilities Verification By: ______________ Date: ______________

Inspection Checklist (Issuer & Receiver)

The following areas / items have been inspected by issuer and receiver:

ITEMSTATUSCOMMENTS
Access / Egress Danger / Warning Signs Lighting / Flickering (if required) Flag Man / Spotter (if required) Multi-Gas Detector As-built Drawings Hard Barrier (1m from edge) Spoil Pile Placement Equipment/Machinery - Condition Emergency Procedures Posted First Aid KitAdequate ☐ Not In Place ☐ Not Adequate ☐ Not Assigned ☐ Not Available ☐ Not Available ☐ Not In Place ☐ Not >1m ☐ <1m ☐ Good ☐ Fault ☐ Yes ☐ No ☐ Present ☐ Not________ ________ ________ Name: ______________ Model: ______________ Drawing #: ______________ Distance: _____ m from edge Distance: _____ m from edge ________ ________ Location: ______________

OTHER ITEMS (Specify):

______________

INSPECTED BY (Issuer): ______________ DATE: ______________ TIME: ______________

INSPECTED BY (Receiver): ______________ DATE: ______________ TIME: ______________

Atmospheric Testing (If Required)

TEST EQUIPMENT DETAILS:

Gas Detector Model: ______________ Serial #: ______________ Calibration Date: ______________

ACCEPTANCE CRITERIA:

• Oxygen (O2): 19.5% - 23.5% • Lower Explosive Limit (LEL): < 10%

• Hydrogen Sulfide (H2S): < 10 ppm • Carbon Monoxide (CO): < 25 ppm

TIMELOCATIONO2 %LEL %H2S (ppm)CO (ppm)TESTED BY
______ _________________ __________________ ______________ ______________ ______________ _______________ ________

TESTED BY: ______________ DATE: ______________ TIME: ______________

Inspection System

Are adequate inspection systems followed:

☐ During excavation - continuous inspection by Competent Person

☐ After excavation - final inspection before leaving

☐ During backfilling - inspection of utility protection

☐ After backfilling - final inspection and sign-off

COMPETENT PERSON (Daily Inspections):

Name: ______________ Date: ______________

Signature: ______________

Personal Protective Equipment (Ppe)

PPE Required for the activity:

MANDATORY PPE:

☐ Helmet / Hard hat ☐ Safety Shoes / Steel-toed boots ☐ Reflective Vest

☐ Safety Goggles / Glasses ☐ Mechanical Gloves ☐ Safety Ear Plugs / Muffs

ADDITIONAL PPE (as required):

☐ Dust Mask / Respirator (Type: ______________) ☐ Gumboot / Rubber Boots

☐ Safety Harness / Fall Arrest ☐ High Visibility Clothing

☐ Face Shield ☐ Chemical Suit / Coveralls ☐ Sun Protection

☐ Other: ______________ ☐ Other: ______________ ☐ Other: ______________

PPE VERIFIED BY: ______________ DATE: ______________ TIME: ______________

Authorization Sign-Off

PERMIT RECEIVER (Confirms understanding of hazards and controls):

I certify that I have read and verified this excavation permit and checklist. I am aware of the

risks associated with excavation work and will follow all safety rules.

Name: ______________ Signature: ______________ Date: ___________

PERMIT ISSUER (Authorizes work to proceed):

I have reviewed the excavation checklist and checked the working conditions. I am satisfied

that all control measures are in place and the activity is authorized to proceed.

Name: ______________ Signature: ______________ Date: ___________

COMPETENT PERSON (Confirms soil classification and protective systems):

I have classified the soil and inspected the protective systems. They are adequate for safe work.

Name: ______________ Signature: ______________ Date: ___________

SAFETY OFFICER (Verifies controls in place):

Name: ______________ Signature: ______________ Date: ___________

Work Completion / Backfilling

EXCAVATION COMPLETED: Date: ______________ Time: ______________

BACKFILLING REQUIRED? ☐ Yes ☐ No

If Yes:

☐ Utilities protected / inspected before backfill

☐ Backfill material: ☐ Native ☐ Imported ☐ Gravel ☐ Sand

☐ Compaction performed: ☐ Mechanical ☐ Hand ☐ Water

SITE RESTORATION:

☐ Area graded / leveled

☐ Spoil piles removed

☐ Barricades / signs removed

☐ Surface restored

FINAL INSPECTION BY COMPETENT PERSON:

Signature: ______________ Date: ______________

AREA HANDOVER TO OPERATIONS:

Name: ______________ Signature: ______________ Date: ___________

THIS PERMIT IS VALID ONLY FOR THE DATE AND TIME SPECIFIED - ONE SHIFT ONLY