Free Electrical Work Permit (Enhanced) template for construction you can edit online and download as PDF. Covers permit information, work team & qualifications, hazard identification.
PTW REFERENCE: PTW-______________ DATE: ______________
PROJECT NAME: ______________ NUMBER OF EMPLOYEES: _____
STARTING FROM: ______________ DATE: ______________ TIME: ______________
EXPECTED COMPLETION: ______________ DATE: ______________ TIME: ______________
WORK TYPE:
☐ Energized Lines/Equipment ☐ De-Energized Line/Equipment ☐ Testing/Troubleshooting
☐ Inspection ☐ Maintenance ☐ Installation ☐ Other: ______________
VOLTAGE LEVEL: ______________ V / ______________ kV
WORK DESCRIPTION: ______________
______________
LOCATION OF JOB TO BE PERFORMED: ______________
EQUIPMENT ID: ______________ PANEL/MCC #: ______________
TOOLS/EQUIPMENT TO BE USED: ______________
______________
| ROLE | NAME | CERTIFICATION / LICENSE | ||
|---|---|---|---|---|
| Permit Applicant Authorized Electrician (In-charge) Licensed Electrical Worker Electrical Helper Safety Observer / Standby Person Operating Authority | ________ ________ ________ ________ ________ ________ | ________ License #: ______________ License #: ______________ Training Date: ___________ ________ ________ |
TOTAL NUMBER OF WORKERS: _____ (Minimum 2 persons for electrical work - buddy system)
Identify risk associated with this Electrical work:
☐ Electrocution ☐ Arc Flash ☐ Flying particles ☐ Noise
☐ Falling Objects ☐ Protruding objects ☐ Tripping / Slipping ☐ Electric shock
☐ Fire ☐ Manual handling ☐ Electric Burn ☐ Near Overhead lines
☐ Arc Blast ☐ Flash Blindness ☐ Secondary Falls ☐ Cardiac Arrest
☐ Stored Energy ☐ Capacitors ☐ Backfeed ☐ Induced Voltage
OTHER HAZARDS (Specify): ______________
______________
The following document must be attached with this permit:
| DOCUMENT | ATTACHED | REFERENCE NUMBER |
|---|---|---|
| Method Statement Risk Assessment (RAMS) Single Line Diagram / Electrical Drawing Arc Flash Study / Label LOTO Procedure / Certificate Other (specify): ______________ | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | Rev #: ______________ Ref #: ______________ Drawing #: ______________ Ref #: ______________ Ref #: ______________ Ref #: ______________ |
EQUIPMENT DETAILS:
Nominal Voltage: ______________ V / ______________ kV
Available Fault Current: ______________ kA (if known)
ARC FLASH CALCULATIONS (if available):
Incident Energy: ______________ cal/cm² @ ______________ mm working distance
Arc Flash Boundary: ______________ mm / m
Arc Flash PPE Category: ☐ 0 ☐ 1 ☐ 2 ☐ 3 ☐ 4 (Based on NFPA 70E)
Limited Approach Boundary (for shock): ______________ mm / m
Restricted Approach Boundary: ______________ mm / m
Prohibited Approach Boundary: ______________ mm / m
ARC FLASH LABEL AFFIXED TO EQUIPMENT? ☐ Yes ☐ No ☐ N/A
RISK ASSESSMENT COMPLETED BY: ______________ DATE: ______________
| Precaution require to complete the work safely | Yes | No | Voltage/Dist |
|---|---|---|---|
| Is the safe distance maintained? Does the work require access to confined spaces? If yes, obtain CSE permit Have all possible sources of electrical power been isolated, locked and properly tagged? Is isolation in place and followed as per procedure? Isolation Type: ☐ Switch Out ☐ Lockout/Tag out ☐ Both Number of Locks Applied: _____ LOTO Station #: ______________ Has it been confirmed by testing, that the lines/equipment are de-energized? Voltage Tester Used: ______________ Model: ______________ Tester tested on known live source before use? ☐ Yes ☐ No Test Results: Phase A-G: ___V Phase B-G: ___V Phase C-G: ___V A-B: ___V B-C: ___V Have tools and devices to be used been tested and adjusted? Are insulated tools being used (rated for voltage)? Are rubber insulating gloves being used? Glove Test Date: ______________ Next Test Due: ______________ Is arc flash PPE being worn as per category? Are grounds applied (if required for high voltage)? Is a safety observer / standby person assigned? Are barricades and warning signs in place? | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ ☐ | _____ m Permit #: __ LOTO #: ____ Rating: __V Class: _____ Cat: _____ Type: _____ Name: _____ |
Justification for Energized Work (Must meet one of the following):
☐ De-energizing would introduce additional or increased hazards
☐ De-energizing is infeasible due to equipment design or operational limitations
☐ Other approved justification: ______________
SAFE WORK PRACTICES FOR ENERGIZED WORK:
☐ Energized work plan / procedure developed
☐ Detailed step-by-step work sequence established
☐ Approach boundaries established and respected
☐ Insulated tools and equipment used
☐ Rubber insulating gloves and sleeves worn
☐ Arc flash PPE as per category worn
☐ Barricades and warning signs in place
☐ Safety observer / standby person present
☐ Emergency response plan specific to energized work
ENERGIZED WORK APPROVALS:
Electrical Supervisor: ______________ Date: ______________
Safety Manager: ______________ Date: ______________
The following areas / items have been inspected by issuer and receiver:
| ITEM | STATUS | COMMENTS |
|---|---|---|
| Fire Extinguisher Type: ☐ CO2 ☐ Dry Chemical ☐ Other Access / Escape Route Danger / Warning Signs Lighting Safety Barriers / Barricades Insulated Stick / Hot Stick Portable Radio / Communication Voltage Tester Insulated Tools Rubber Gloves Arc Flash PPE LOTO Equipment First Aid Kit Emergency Eye Wash | Present ☐ Not Clear ☐ Blocked In Place ☐ Not Adequate ☐ Not In Place ☐ Not Available ☐ Not Working ☐ Not Working ☐ Not Available ☐ Not Available ☐ Not Available ☐ Not In Place ☐ Not Present ☐ Not Available ☐ Not | Type: _________ Qty: _____ Size: _____ ________ ________ ________ ________ Rating: _____ kV Channel: _____ Calibration due: _________ Rating: _____ V Class: _____ Test date: _________ Category: _____ Locks: _____ Tags: _____ Location: ______________ Location: ______________ |
OTHER ITEMS (Specify):
______________
INSPECTED BY (Issuer): ______________ DATE: ______________ TIME: ______________
INSPECTED BY (Receiver): ______________ DATE: ______________ TIME: ______________
SHOCK PROTECTION PPE (Based on Voltage):
☐ Rubber Insulating Gloves (Class: _____) (Max use voltage: _____ V)
☐ Leather Protector Gloves (over rubber gloves)
☐ Rubber Sleeves (Class: _____) (if required)
☐ Insulating Mat / Platform (Rating: _____ V)
☐ Insulated Tools (Rating: _____ V)
☐ Voltage Rated Flash Protection
☐ Face Shield (with arc rating)
ARC FLASH PPE (Based on Category):
CATEGORY 0:
☐ Non-melting natural fiber clothing (long sleeve shirt & pants)
☐ Safety Glasses
☐ Ear Canal Inserts
CATEGORY 1 (4 cal/cm²):
☐ Arc Rated Shirt & Pants or Coverall
☐ Arc Rated Face Shield or Flash Suit Hood
☐ Safety Glasses
☐ Hearing Protection
☐ Leather Gloves
CATEGORY 2 (8 cal/cm²):
☐ Arc Rated Shirt & Pants or Coverall
☐ Arc Rated Flash Suit Hood or Face Shield
☐ Safety Glasses
☐ Hearing Protection
☐ Leather Gloves
CATEGORY 3 (25 cal/cm²):
☐ Arc Rated Flash Suit Jacket & Pants or Coverall
☐ Arc Rated Flash Suit Hood
☐ Safety Glasses
☐ Hearing Protection
☐ Leather Gloves
☐ Arc Rated Under Layer
CATEGORY 4 (40 cal/cm²):
☐ Arc Rated Flash Suit Jacket & Pants or Coverall
☐ Arc Rated Flash Suit Hood
☐ Safety Glasses
☐ Hearing Protection
☐ Leather Gloves
☐ Arc Rated Under Layer
PPE INSPECTED BY: ______________ DATE: ______________
LOTO PROCEDURE NUMBER: ______________ Rev: _____
ENERGY ISOLATION POINTS:
| POINT | DEVICE TYPE | LOCK NUMBER | TAG NUMBER | VERIFIED BY | ||
|---|---|---|---|---|---|---|
| _____________ _____________ _____________ _____________ | _____________ _____________ _____________ _____________ | _____________ _____________ _____________ _____________ | _____________ _____________ _____________ _____________ | _____________ _____________ _____________ _____________ |
STORED ENERGY CHECK:
☐ Capacitors discharged ☐ Inductors shorted ☐ Springs released/blocked
☐ Flywheels stopped ☐ Elevated parts lowered/blocked ☐ Other: ______________
VERIFICATION METHOD:
☐ Visual inspection of open disconnect
☐ Voltage testing at point of work
☐ Test on known live source before and after
☐ Grounding applied after testing
LOTO REMOVAL:
Expected removal date/time: ______________
Actual removal date/time: ______________
Removed by: ______________ Witnessed by: ______________
☐ Grounding required for this work
GROUNDING EQUIPMENT:
Ground Set #1: Rating: _____ kV Cable Size: _____ Length: _____ m
Ground Set #2: Rating: _____ kV Cable Size: _____ Length: _____ m
Ground Clamp Type: ______________
GROUND INSTALLATION SEQUENCE:
1. Test for absence of voltage at point of ground application
2. Attach ground cable to ground bus/electrode first
3. Apply grounding device to phase conductors using hot stick
4. Verify ground connection integrity
GROUND INSTALLED BY: ______________ DATE: ______________ TIME: ______________
GROUND REMOVAL SEQUENCE:
1. Remove grounding device from phase conductors using hot stick
2. Disconnect ground cable from ground bus/electrode
GROUND REMOVED BY: ______________ DATE: ______________ TIME: ______________
EMERGENCY CONTACTS:
First Aid / Medical Emergency: ______________ Phone: ______________
Fire Emergency: ______________ Phone: ______________
Electrical Supervisor: ______________ Phone: ______________
Safety Representative: ______________ Phone: ______________
Site Security: ______________ Phone: ______________
Local Hospital: ______________ Phone: ______________
Ambulance: ______________ Phone: ______________
EMERGENCY PROCEDURES:
ELECTRIC SHOCK / ELECTROCUTION:
1. De-energize source if possible (if safe to do so)
2. If cannot de-energize, use non-conductive material to separate victim
3. Call for emergency medical assistance immediately
4. Check breathing and pulse - begin CPR if trained
5. Treat for shock - keep victim warm and lying down
6. Do not move victim unless in danger of further injury
ARC FLASH / BURN:
1. Stop - Drop - Roll if clothing on fire
2. Cool burns with cool water for at least 10 minutes
3. Cover burns with clean, dry cloth
4. Seek immediate medical attention
5. Do not apply ointments or ice directly to burns
FIRE:
1. Raise alarm - Call fire department
2. Use appropriate fire extinguisher (Class C for electrical fires)
3. Evacuate area if fire is uncontrollable
4. Do not use water on electrical fires
EMERGENCY EYE WASH STATION LOCATION: ______________
FIRST AID KIT LOCATION: ______________
ASSEMBLY POINT: ______________
EMERGENCY DRILLS CONDUCTED: Last drill date: ______________ Next drill due: ______________
DATE: ______________ TIME: ______________ CONDUCTED BY: ______________
TOPICS COVERED:
☐ Scope of work for the day
☐ Hazards identified and controls
☐ LOTO status and verification
☐ PPE requirements
☐ Emergency procedures
☐ Specific tasks and assignments
☐ Communication protocols
☐ Previous day lessons learned / incidents
ATTENDEES:
1. ______________ 6. ______________
2. ______________ 7. ______________
3. ______________ 8. ______________
4. ______________ 9. ______________
5. ______________ 10. ______________
KEY DISCUSSION POINTS: ______________
______________
| DATE | START TIME | END TIME | WORK PERFORMED | SUPERVISOR | WORKER SIGNATURE | ||
|---|---|---|---|---|---|---|---|
| ___________ ___________ ___________ ___________ ___________ | ___________ ___________ ___________ ___________ ___________ | ___________ ___________ ___________ ___________ ___________ | ________ ________ ________ ________ ________ | ________ ________ ________ ________ ________ | ________ ________ ________ ________ ________ |
UNUSUAL OCCURRENCES / NEAR MISSES: ______________
______________
SHIFT: ☐ Day ☐ Afternoon ☐ Night DATE: ______________
WORK COMPLETED THIS SHIFT: ______________
______________
WORK PENDING / INCOMPLETE: ______________
______________
HAZARDS / ISSUES TO BE AWARE OF: ______________
______________
LOTO STATUS AT HANDOVER:
☐ All LOTO devices remain in place (work incomplete)
☐ LOTO devices removed (work complete)
☐ Partial LOTO - list devices remaining: ______________
OUTGOING SUPERVISOR: ______________ SIGNATURE: ______________
INCOMING SUPERVISOR: ______________ SIGNATURE: ______________
DATE/TIME: ______________
WORK COMPLETED: ☐ Yes ☐ No (If No, new permit required)
EQUIPMENT STATUS:
☐ Equipment returned to normal operating condition
☐ All guards and covers reinstalled
☐ Area cleaned and all debris removed
☐ Tools and equipment removed from work area
☐ All personnel accounted for
ENERGIZATION VERIFICATION:
☐ Work area inspected and clear
☐ All grounds removed
☐ All personnel clear of danger zone
☐ LOTO devices removed by authorized personnel
☐ Equipment energized and tested (if applicable)
☐ Post-energization check completed
FINAL INSPECTION BY SUPERVISOR:
Comments: ______________
______________
WORK COMPLETION DATE: ______________ TIME: ______________
SUPERVISOR SIGNATURE: ______________
FINAL APPROVAL (Area Authority):
Name: ______________ Signature: ______________ Date: ______________
PERMIT APPLICANT:
I have assessed the work area, identified hazards, and ensured all precautionary measures are in place.
Name: ______________ Signature: ______________ Date: ______________
AUTHORIZED ELECTRICIAN (IN-CHARGE):
I am qualified for this task and will ensure all safe work practices are followed.
Name: ______________ Signature: ______________ Date: ______________
License #: ______________
SAFETY OBSERVER:
I understand my role and responsibilities during this electrical work.
Name: ______________ Signature: ______________ Date: ______________
OPERATING AUTHORITY / ISSUER:
I have verified the isolation and confirmed the area is ready for work.
Name: ______________ Signature: ______________ Date: ______________
SAFETY OFFICER REVIEW:
I have reviewed this permit and confirm compliance with safety requirements.
Name: ______________ Signature: ______________ Date: ______________
PROJECT MANAGER APPROVAL (if required):
Name: ______________ Signature: ______________ Date: ______________
ORIGINAL VALIDITY PERIOD:
FROM: ______________ DATE: ______________ TIME: ______________
TO: ______________ DATE: ______________ TIME: ______________
EXTENSION 1:
Approved by: ______________ DATE: ______________ TIME: ______________
New expiry: ______________ DATE: ______________ TIME: ______________
EXTENSION 2:
Approved by: ______________ DATE: ______________ TIME: ______________
New expiry: ______________ DATE: ______________ TIME: ______________
MAXIMUM VALIDITY PERIOD (per site rules): ______________ hours/days
INCIDENT / NEAR MISS OCCURRED? ☐ Yes ☐ No
IF YES:
DATE: ______________ TIME: ______________ LOCATION: ______________
DESCRIPTION OF INCIDENT: ______________
______________
______________
IMMEDIATE ACTIONS TAKEN: ______________
______________
INJURIES / DAMAGES: ______________
REPORTED TO: ______________ DATE: ______________ TIME: ______________
INCIDENT REPORT NUMBER: ______________ (attach separate report if required)
SAFETY FIRST - ELECTRICITY KILLS
This permit must be available at the work site at all times