Electrical Work Permit (Enhanced) template

Free Electrical Work Permit (Enhanced) template for construction you can edit online and download as PDF. Covers permit information, work team & qualifications, hazard identification.

Permit Information

PTW REFERENCE: PTW-______________ DATE: ______________

PROJECT NAME: ______________ NUMBER OF EMPLOYEES: _____

STARTING FROM: ______________ DATE: ______________ TIME: ______________

EXPECTED COMPLETION: ______________ DATE: ______________ TIME: ______________

WORK TYPE:

☐ Energized Lines/Equipment ☐ De-Energized Line/Equipment ☐ Testing/Troubleshooting

☐ Inspection ☐ Maintenance ☐ Installation ☐ Other: ______________

VOLTAGE LEVEL: ______________ V / ______________ kV

WORK DESCRIPTION: ______________

______________

LOCATION OF JOB TO BE PERFORMED: ______________

EQUIPMENT ID: ______________ PANEL/MCC #: ______________

TOOLS/EQUIPMENT TO BE USED: ______________

______________

Work Team & Qualifications

ROLENAMECERTIFICATION / LICENSE
Permit Applicant Authorized Electrician (In-charge) Licensed Electrical Worker Electrical Helper Safety Observer / Standby Person Operating Authority________ ________ ________ ________ ________ ________________ License #: ______________ License #: ______________ Training Date: ___________ ________ ________

TOTAL NUMBER OF WORKERS: _____ (Minimum 2 persons for electrical work - buddy system)

Hazard Identification

Identify risk associated with this Electrical work:

☐ Electrocution ☐ Arc Flash ☐ Flying particles ☐ Noise

☐ Falling Objects ☐ Protruding objects ☐ Tripping / Slipping ☐ Electric shock

☐ Fire ☐ Manual handling ☐ Electric Burn ☐ Near Overhead lines

☐ Arc Blast ☐ Flash Blindness ☐ Secondary Falls ☐ Cardiac Arrest

☐ Stored Energy ☐ Capacitors ☐ Backfeed ☐ Induced Voltage

OTHER HAZARDS (Specify): ______________

______________

Attached Documents

The following document must be attached with this permit:

DOCUMENTATTACHEDREFERENCE NUMBER
Method Statement Risk Assessment (RAMS) Single Line Diagram / Electrical Drawing Arc Flash Study / Label LOTO Procedure / Certificate Other (specify): ______________☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
Rev #: ______________ Ref #: ______________ Drawing #: ______________ Ref #: ______________ Ref #: ______________ Ref #: ______________

Arc Flash & Shock Risk Assessment (Nfpa 70E)

EQUIPMENT DETAILS:

Nominal Voltage: ______________ V / ______________ kV

Available Fault Current: ______________ kA (if known)

ARC FLASH CALCULATIONS (if available):

Incident Energy: ______________ cal/cm² @ ______________ mm working distance

Arc Flash Boundary: ______________ mm / m

Arc Flash PPE Category: ☐ 0 ☐ 1 ☐ 2 ☐ 3 ☐ 4 (Based on NFPA 70E)

Limited Approach Boundary (for shock): ______________ mm / m

Restricted Approach Boundary: ______________ mm / m

Prohibited Approach Boundary: ______________ mm / m

ARC FLASH LABEL AFFIXED TO EQUIPMENT? ☐ Yes ☐ No ☐ N/A

RISK ASSESSMENT COMPLETED BY: ______________ DATE: ______________

Precaution Measures Checklist

Precaution require to complete the work safelyYesNoVoltage/Dist
Is the safe distance maintained? Does the work require access to confined spaces? If yes, obtain CSE permit Have all possible sources of electrical power been isolated, locked and properly tagged? Is isolation in place and followed as per procedure? Isolation Type: ☐ Switch Out ☐ Lockout/Tag out ☐ Both Number of Locks Applied: _____ LOTO Station #: ______________ Has it been confirmed by testing, that the lines/equipment are de-energized? Voltage Tester Used: ______________ Model: ______________ Tester tested on known live source before use? ☐ Yes ☐ No Test Results: Phase A-G: ___V Phase B-G: ___V Phase C-G: ___V A-B: ___V B-C: ___V Have tools and devices to be used been tested and adjusted? Are insulated tools being used (rated for voltage)? Are rubber insulating gloves being used? Glove Test Date: ______________ Next Test Due: ______________ Is arc flash PPE being worn as per category? Are grounds applied (if required for high voltage)? Is a safety observer / standby person assigned? Are barricades and warning signs in place?☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
_____ m Permit #: __ LOTO #: ____ Rating: __V Class: _____ Cat: _____ Type: _____ Name: _____

Energized Work Permit (To Be Completed Only For Work On Live Parts >50V)

Justification for Energized Work (Must meet one of the following):

☐ De-energizing would introduce additional or increased hazards

☐ De-energizing is infeasible due to equipment design or operational limitations

☐ Other approved justification: ______________

SAFE WORK PRACTICES FOR ENERGIZED WORK:

☐ Energized work plan / procedure developed

☐ Detailed step-by-step work sequence established

☐ Approach boundaries established and respected

☐ Insulated tools and equipment used

☐ Rubber insulating gloves and sleeves worn

☐ Arc flash PPE as per category worn

☐ Barricades and warning signs in place

☐ Safety observer / standby person present

☐ Emergency response plan specific to energized work

ENERGIZED WORK APPROVALS:

Electrical Supervisor: ______________ Date: ______________

Safety Manager: ______________ Date: ______________

Inspection Checklist (Issuer & Receiver)

The following areas / items have been inspected by issuer and receiver:

ITEMSTATUSCOMMENTS
Fire Extinguisher Type: ☐ CO2 ☐ Dry Chemical ☐ Other Access / Escape Route Danger / Warning Signs Lighting Safety Barriers / Barricades Insulated Stick / Hot Stick Portable Radio / Communication Voltage Tester Insulated Tools Rubber Gloves Arc Flash PPE LOTO Equipment First Aid Kit Emergency Eye WashPresent ☐ Not Clear ☐ Blocked In Place ☐ Not Adequate ☐ Not In Place ☐ Not Available ☐ Not Working ☐ Not Working ☐ Not Available ☐ Not Available ☐ Not Available ☐ Not In Place ☐ Not Present ☐ Not Available ☐ NotType: _________ Qty: _____ Size: _____ ________ ________ ________ ________ Rating: _____ kV Channel: _____ Calibration due: _________ Rating: _____ V Class: _____ Test date: _________ Category: _____ Locks: _____ Tags: _____ Location: ______________ Location: ______________

OTHER ITEMS (Specify):

______________

INSPECTED BY (Issuer): ______________ DATE: ______________ TIME: ______________

INSPECTED BY (Receiver): ______________ DATE: ______________ TIME: ______________

Personal Protective Equipment (Ppe) - NFPA 70E Requirements

SHOCK PROTECTION PPE (Based on Voltage):

☐ Rubber Insulating Gloves (Class: _____) (Max use voltage: _____ V)

☐ Leather Protector Gloves (over rubber gloves)

☐ Rubber Sleeves (Class: _____) (if required)

☐ Insulating Mat / Platform (Rating: _____ V)

☐ Insulated Tools (Rating: _____ V)

☐ Voltage Rated Flash Protection

☐ Face Shield (with arc rating)

ARC FLASH PPE (Based on Category):

CATEGORY 0:

☐ Non-melting natural fiber clothing (long sleeve shirt & pants)

☐ Safety Glasses

☐ Ear Canal Inserts

CATEGORY 1 (4 cal/cm²):

☐ Arc Rated Shirt & Pants or Coverall

☐ Arc Rated Face Shield or Flash Suit Hood

☐ Safety Glasses

☐ Hearing Protection

☐ Leather Gloves

CATEGORY 2 (8 cal/cm²):

☐ Arc Rated Shirt & Pants or Coverall

☐ Arc Rated Flash Suit Hood or Face Shield

☐ Safety Glasses

☐ Hearing Protection

☐ Leather Gloves

CATEGORY 3 (25 cal/cm²):

☐ Arc Rated Flash Suit Jacket & Pants or Coverall

☐ Arc Rated Flash Suit Hood

☐ Safety Glasses

☐ Hearing Protection

☐ Leather Gloves

☐ Arc Rated Under Layer

CATEGORY 4 (40 cal/cm²):

☐ Arc Rated Flash Suit Jacket & Pants or Coverall

☐ Arc Rated Flash Suit Hood

☐ Safety Glasses

☐ Hearing Protection

☐ Leather Gloves

☐ Arc Rated Under Layer

PPE INSPECTED BY: ______________ DATE: ______________

Lockout/Tagout (Loto) Verification

LOTO PROCEDURE NUMBER: ______________ Rev: _____

ENERGY ISOLATION POINTS:

POINTDEVICE TYPELOCK NUMBERTAG NUMBERVERIFIED BY
_____________ _____________ _____________ __________________________ _____________ _____________ __________________________ _____________ _____________ __________________________ _____________ _____________ __________________________ _____________ _____________ _____________

STORED ENERGY CHECK:

☐ Capacitors discharged ☐ Inductors shorted ☐ Springs released/blocked

☐ Flywheels stopped ☐ Elevated parts lowered/blocked ☐ Other: ______________

VERIFICATION METHOD:

☐ Visual inspection of open disconnect

☐ Voltage testing at point of work

☐ Test on known live source before and after

☐ Grounding applied after testing

LOTO REMOVAL:

Expected removal date/time: ______________

Actual removal date/time: ______________

Removed by: ______________ Witnessed by: ______________

Grounding Procedure (For High Voltage/Transmission)

☐ Grounding required for this work

GROUNDING EQUIPMENT:

Ground Set #1: Rating: _____ kV Cable Size: _____ Length: _____ m

Ground Set #2: Rating: _____ kV Cable Size: _____ Length: _____ m

Ground Clamp Type: ______________

GROUND INSTALLATION SEQUENCE:

1. Test for absence of voltage at point of ground application

2. Attach ground cable to ground bus/electrode first

3. Apply grounding device to phase conductors using hot stick

4. Verify ground connection integrity

GROUND INSTALLED BY: ______________ DATE: ______________ TIME: ______________

GROUND REMOVAL SEQUENCE:

1. Remove grounding device from phase conductors using hot stick

2. Disconnect ground cable from ground bus/electrode

GROUND REMOVED BY: ______________ DATE: ______________ TIME: ______________

Emergency Response Plan

EMERGENCY CONTACTS:

First Aid / Medical Emergency: ______________ Phone: ______________

Fire Emergency: ______________ Phone: ______________

Electrical Supervisor: ______________ Phone: ______________

Safety Representative: ______________ Phone: ______________

Site Security: ______________ Phone: ______________

Local Hospital: ______________ Phone: ______________

Ambulance: ______________ Phone: ______________

EMERGENCY PROCEDURES:

ELECTRIC SHOCK / ELECTROCUTION:

1. De-energize source if possible (if safe to do so)

2. If cannot de-energize, use non-conductive material to separate victim

3. Call for emergency medical assistance immediately

4. Check breathing and pulse - begin CPR if trained

5. Treat for shock - keep victim warm and lying down

6. Do not move victim unless in danger of further injury

ARC FLASH / BURN:

1. Stop - Drop - Roll if clothing on fire

2. Cool burns with cool water for at least 10 minutes

3. Cover burns with clean, dry cloth

4. Seek immediate medical attention

5. Do not apply ointments or ice directly to burns

FIRE:

1. Raise alarm - Call fire department

2. Use appropriate fire extinguisher (Class C for electrical fires)

3. Evacuate area if fire is uncontrollable

4. Do not use water on electrical fires

EMERGENCY EYE WASH STATION LOCATION: ______________

FIRST AID KIT LOCATION: ______________

ASSEMBLY POINT: ______________

EMERGENCY DRILLS CONDUCTED: Last drill date: ______________ Next drill due: ______________

Daily Briefing / Toolbox Talk

DATE: ______________ TIME: ______________ CONDUCTED BY: ______________

TOPICS COVERED:

☐ Scope of work for the day

☐ Hazards identified and controls

☐ LOTO status and verification

☐ PPE requirements

☐ Emergency procedures

☐ Specific tasks and assignments

☐ Communication protocols

☐ Previous day lessons learned / incidents

ATTENDEES:

1. ______________ 6. ______________

2. ______________ 7. ______________

3. ______________ 8. ______________

4. ______________ 9. ______________

5. ______________ 10. ______________

KEY DISCUSSION POINTS: ______________

______________

Work Execution Log

DATESTART TIMEEND TIMEWORK PERFORMEDSUPERVISORWORKER SIGNATURE
___________ ___________ ___________ ___________ ______________________ ___________ ___________ ___________ ______________________ ___________ ___________ ___________ ___________________ ________ ________ ________ ________________ ________ ________ ________ ________________ ________ ________ ________ ________

UNUSUAL OCCURRENCES / NEAR MISSES: ______________

______________

Handover / Shift Change

SHIFT: ☐ Day ☐ Afternoon ☐ Night DATE: ______________

WORK COMPLETED THIS SHIFT: ______________

______________

WORK PENDING / INCOMPLETE: ______________

______________

HAZARDS / ISSUES TO BE AWARE OF: ______________

______________

LOTO STATUS AT HANDOVER:

☐ All LOTO devices remain in place (work incomplete)

☐ LOTO devices removed (work complete)

☐ Partial LOTO - list devices remaining: ______________

OUTGOING SUPERVISOR: ______________ SIGNATURE: ______________

INCOMING SUPERVISOR: ______________ SIGNATURE: ______________

DATE/TIME: ______________

Work Completion / Close-Out

WORK COMPLETED: ☐ Yes ☐ No (If No, new permit required)

EQUIPMENT STATUS:

☐ Equipment returned to normal operating condition

☐ All guards and covers reinstalled

☐ Area cleaned and all debris removed

☐ Tools and equipment removed from work area

☐ All personnel accounted for

ENERGIZATION VERIFICATION:

☐ Work area inspected and clear

☐ All grounds removed

☐ All personnel clear of danger zone

☐ LOTO devices removed by authorized personnel

☐ Equipment energized and tested (if applicable)

☐ Post-energization check completed

FINAL INSPECTION BY SUPERVISOR:

Comments: ______________

______________

WORK COMPLETION DATE: ______________ TIME: ______________

SUPERVISOR SIGNATURE: ______________

FINAL APPROVAL (Area Authority):

Name: ______________ Signature: ______________ Date: ______________

Authorization Signatures

PERMIT APPLICANT:

I have assessed the work area, identified hazards, and ensured all precautionary measures are in place.

Name: ______________ Signature: ______________ Date: ______________

AUTHORIZED ELECTRICIAN (IN-CHARGE):

I am qualified for this task and will ensure all safe work practices are followed.

Name: ______________ Signature: ______________ Date: ______________

License #: ______________

SAFETY OBSERVER:

I understand my role and responsibilities during this electrical work.

Name: ______________ Signature: ______________ Date: ______________

OPERATING AUTHORITY / ISSUER:

I have verified the isolation and confirmed the area is ready for work.

Name: ______________ Signature: ______________ Date: ______________

SAFETY OFFICER REVIEW:

I have reviewed this permit and confirm compliance with safety requirements.

Name: ______________ Signature: ______________ Date: ______________

PROJECT MANAGER APPROVAL (if required):

Name: ______________ Signature: ______________ Date: ______________

Permit Validity & Extensions

ORIGINAL VALIDITY PERIOD:

FROM: ______________ DATE: ______________ TIME: ______________

TO: ______________ DATE: ______________ TIME: ______________

EXTENSION 1:

Approved by: ______________ DATE: ______________ TIME: ______________

New expiry: ______________ DATE: ______________ TIME: ______________

EXTENSION 2:

Approved by: ______________ DATE: ______________ TIME: ______________

New expiry: ______________ DATE: ______________ TIME: ______________

MAXIMUM VALIDITY PERIOD (per site rules): ______________ hours/days

Incident / Near Miss Reporting

INCIDENT / NEAR MISS OCCURRED? ☐ Yes ☐ No

IF YES:

DATE: ______________ TIME: ______________ LOCATION: ______________

DESCRIPTION OF INCIDENT: ______________

______________

______________

IMMEDIATE ACTIONS TAKEN: ______________

______________

INJURIES / DAMAGES: ______________

REPORTED TO: ______________ DATE: ______________ TIME: ______________

INCIDENT REPORT NUMBER: ______________ (attach separate report if required)

SAFETY FIRST - ELECTRICITY KILLS

This permit must be available at the work site at all times