Electrical Installation Risk Assessment template

Free Electrical Installation Risk Assessment template for construction you can edit online and download as PDF. Covers electrical installation project information, electrical safety program - osha 29 cfr 1926.950 - 1926.960, locko

Electrical Installation Project Information

ASSESSMENT ID: ELEC-__________ DATE: ______________ TIME: ______________

PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________

INSTALLATION TYPE:

☐ New Construction ☐ Renovation ☐ Temporary Power ☐ Service Entrance ☐ Panel Upgrades

☐ Lighting ☐ Conduit/Wiring ☐ Controls ☐ Switchgear ☐ Other: ______________

VOLTAGE RATINGS:

Low Voltage (<600V) ☐ Medium Voltage (600V-69kV) ☐ High Voltage (>69kV) ☐

System Voltage: ______ V Phase: 1☐ 3☐ Frequency: ______ Hz

MASTER ELECTRICIAN: ______________ LICENSE #: ______________

ELECTRICAL SUPERVISOR: ______________ PROJECT ELECTRICAL ENGINEER: ______________

INSTALLATION START DATE: ______________ ESTIMATED COMPLETION: ______________

Electrical Safety Program - OSHA 29 Cfr 1926.950 - 1926.960

QUALIFIED PERSONS:

☐ All electrical workers are qualified per OSHA definition

☐ Training records available for review

☐ Annual refresher training completed

☐ Qualified person designated for site: ______________

ELECTRICAL SAFETY PROCEDURES:

☐ Written electrical safety program available

☐ Lockout/Tagout program (OSHA 1926.417)

☐ Arc flash hazard analysis completed

☐ Shock hazard analysis completed

☐ Approach boundaries established and posted

☐ Energized work permit system (if applicable)

☐ Job briefing requirement in place

APPROACH BOUNDARIES - NFPA 70E: Voltage ____________ <50V 50V - 150V 151V - 600V 601V - 2.5kV
2.51kV - 9kV
Limited Approach ________ Not specified 3 ft 6 in 3 ft 6 in 5 ft 0 in 6 ft 0 inRestricted Approach ________ Not specified 1 ft 0 in 1 ft 0 in 1 ft 6 in 2 ft 6 inArc Flash Boundary ________ Not specified Varies Varies Varies VariesRequired PPE ________ ________ ________ ________ ________ ________

SITE-SPECIFIC ARC FLASH HAZARD:

Arc flash boundary: ______ ft Incident energy: ______ cal/cm² Hazard/Risk Category: ______

Lockout/Tagout Procedures - OSHA 29 Cfr 1926.417

LOTO PROGRAM:

☐ Written LOTO program available

☐ LOTO training completed: Date: ___________ Instructor: ______________

☐ Authorized employees: ______________

☐ Affected employees: ______________

☐ Other employees: ______________

LOTO EQUIPMENT: Type ________ Padlocks Hasps Tags Lock boxes Voltage testers Grounding equipment Blank flanges/blindsQuantity _________ _________ _________ _________ _________ _________ _________ _________Location ________ ________ ________ ________ ________ ________ ________ ________Condition __________ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐Last Inspected ________ ________ ________ ________ ________ ________ ________ ________

LOTO PROCEDURE STEPS:

1. Notify all affected employees: ______________

2. Identify energy sources: ______________

3. Shut down equipment: ______________

4. Isolate energy sources: ______________

5. Apply LOTO devices: ______________

6. Dissipate stored energy: ______________

7. Verify isolation (test): ______________

8. Perform work: ______________

9. Remove LOTO devices: ______________

10. Notify employees and restart: ______________

PERIODIC LOTO INSPECTION:

Last inspection: ___________ Next inspection: ___________ Inspector: ______________

Electrical Installation Hazard Identification And Risk Assessment

HAZARDCAUSEPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (1-5)RISK RATING (L x S)
Electric Shock-Contact with live parts
-Improper grounding
-Damaged insulation
-Wet conditions
-Lack of GFCI
-Backfeed from generators
-Electro- cution
-Cardiac arrest
-Burns
-Fall from shock
-Muscle contraction
-Secondary injury
-De-energize (LOTO)
-Voltage testing
-Insulated tools
-Rubber gloves
-GFCI
-Approach boundaries
-Training
3 (Occasional)5 (Catastrophic)15 (EXTREME)
Arc Flash-Working on live equip.
-Short circuit
-Fault current
-Loose connections
-Dropped tools
-Accidental grounding
-Overload conditions
-Severe burns
-Blindness
-Hearing damage
-Blast injuries
-Fatalities
-Arc flash analysis
-Arc-rated PPE
-Flash boundaries
-Energized work permit
-Remote racking
-Training
2 (Remote)5 (Catastrophic)10 (HIGH)
Fire Hazards-Overloaded circuits
-Faulty connections
-Arcing
-Improper wire sizing
-Combustible materials near elect.
-Equipment damage
-Structure damage
-Burns
-Smoke inhalation
-Fatalities
-Proper wire sizing
-Overcurrent protection
-Arc fault protection
-Fire extinguisher nearby
-Hot work permit
2 (Remote)4 (Critical)8 (MEDIUM)
Falls from Height-Ladder work
-Working on aerial lifts
-Scaffold work
-Unprotected edges
-Working on roof/ceilings
-Unstable platforms
-Fractures
-Head injury
-Paralysis
-Fatalities
-Proper ladder selection
-Ladder securing
-Fall protection (harness in lifts)
-Guardrails
4 (Probable)4 (Critical)16 (EXTREME)
Conduit Installation Hazards-Heavy lifting
-Repetitive motion
-Bending/ twisting
-Working overhead
-Conduit threading
-Pipe bending machines
-Back injury
-Musculo- skeletal disorders
-Cuts from sharp edges
-Struck by conduit
-Mechanical aids
-Team lifting
-Proper body mechanics
-Deburring tools
-Gloves
-Barricades
4 (Probable)3 (Major)12 (HIGH)
Cable Pulling-Excessive tension
-Cable kinking
-Lubricant spills
-Pulling equipment kickback
-Confined spaces (manholes)
-Cable whip injury
-Hand/finger crush
-Slips from lubricant
-Ergonomic strain
-Proper pulling equipment
-Tension monitoring
-Approved lubricants
-Gloves
-Spill cleanup supplies
3 (Occasional)3 (Major)9 (MEDIUM)
Termination & Connection Hazards-Cuts from sharp edges
-Stripping tools
-Terminal screwdrivers
-Torque wrench use
-Awkward positions
-Crimping tools
-Lacerations
-Puncture wounds
-Electro- cution (if live)
-Muscle strain
-Proper tools
-Stripping tools
-Terminal block covers
-Torque wrench training
-Ergonomic positioning
4 (Probable)2 (Minor)8 (MEDIUM)
Energized Work-Testing live circuits
-Troubleshooting
-Meter connection
-Unqualified personnel
-Inadequate PPE
-Wrong test sequence
-Electro- cution
-Arc flash
-Burns
-Explosion
-Fatalities
-Qualified person only
-Energized work permit
-Proper PPE
-Insulated tools
-Test procedures
2 (Remote)5 (Catastrophic)10 (HIGH)
Temporary Power Hazards-Overloaded circuits
-Damaged cords
-Wet conditions
-Improper grounding
-Missing cover plates
-Extension cords as permanent wiring
-Fire
-Shock
-Equipment damage
-Trip hazards
-GFCI protection (all circuits)
-Proper wire sizing
-Cord inspection
-Cable protectors
-Grounding
4 (Probable)3 (Major)12 (HIGH)

Energized Work Permit - NFPA 70E

PERMIT #: ELEC-EWP-__________ DATE: ______________ TIME: ______________ FROM: ________ TO: ________

JUSTIFICATION FOR ENERGIZED WORK:

☐ De-energizing would create additional hazards (specify): ______________

☐ De-energizing is not feasible due to equipment design/operation (specify): ______________

☐ Customer/process cannot be shut down (specify): ______________

EQUIPMENT DESCRIPTION:

Equipment ID: ______________ Location: ______________ Voltage: ______ V

Description of work: ______________

HAZARD ANALYSIS:

Shock hazard: Yes ☐ No ☐ Limited approach boundary: ______ Restricted approach boundary: ______

Arc flash hazard: Yes ☐ No ☐ Arc flash boundary: ______ Incident energy: ______ cal/cm²

Hazard/Risk Category: ______ Required PPE: ______________

PPE REQUIRED:

☐ Arc-rated clothing (cal/cm²: _____) ☐ Arc-rated face shield/hood ☐ Safety glasses

☐ Arc-rated balaclava/hood ☐ Hearing protection ☐ Hard hat

☐ Rubber insulating gloves (class: ___) ☐ Rubber insulating sleeves ☐ Leather protectors

☐ Voltage-rated tools ☐ Insulated mats ☐ Other: ______________

QUALIFIED PERSONS:

Lead Electrician: ______________ Qualified: Yes ☐ No ☐

Assistant: ______________ Qualified: Yes ☐ No ☐

Safety Observer: ______________ Qualified: Yes ☐ No ☐

APPROVALS:

Electrician: ______________ Date: ___________ Time: ___________

Electrical Supervisor: ______________ Date: ___________ Time: ___________

Safety Officer: ______________ Date: ___________ Time: ___________

Project Manager: ______________ Date: ___________ Time: ___________

Electrical PPE Inspection Checklist

PPE TYPE ________ Rubber Gloves (00) Rubber Gloves (0) Rubber Gloves (2) Rubber Gloves (4) Leather Protectors Rubber Sleeves Arc Flash Suit Arc Flash Hood Safety Glasses Face Shield Hard Hat Insulated MatMANUFACTURER ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________MODEL __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________ __________SIZE ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____ ____LAST TEST _________ _________ _________ _________ _________ _________ _________ _________ _________ N/A N/A N/A _________NEXT TEST __________ __________ __________ __________ __________ __________ __________ __________ __________ N/A N/A N/A __________CONDITION __________ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐LOCATION ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________

RUBBER GOODS TESTING:

Standard: ASTM D120/IEC 903 Test voltage: ______ kV Test frequency: Every 6 months

Last test date: ___________ Next test date: ___________ Tested by: ______________

Visual inspection before each use required? Yes ☐ No ☐

Air test before each use required? Yes ☐ No ☐

Tool And Equipment Inspection

TOOL TYPE ________ Voltage Tester Multimeter Clamp Meter Insulation Tester GFCI Tester Impedance Tester Hot Stick Shotgun Stick Insulated ToolsMANUFACTURER ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________ ____________MODEL | VOLTAGE RATING __________ __________ __________ __________ __________ __________ __________ __________ __________ __________LAST TEST ________ ______ V ______ V ______ V ______ V ______ V ______ V ______ V ______ V 1000VNEXT TEST _________ _________ _________ _________ _________ N/A _________ _________ _________ N/ACONDITION __________ __________ __________ __________ __________ N/A __________ __________ __________ N/ALOCATION __________ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐ Good ☐ Bad☐_________ _________ _________ _________ _________ _________ _________ _________ _________ _________

TEST EQUIPMENT CALIBRATION:

All test equipment calibrated annually? Yes ☐ No ☐ Calibration due: ___________

Calibration records location: ______________

Electrical Installation Daily Checklist

INSPECTOR: ______________ DATE: ______________ TIME: ______________

WEATHER: ______________ CONDITIONS: Dry ☐ Wet ☐ Snow/Ice ☐

INSPECTION ITEMSATISFACTORYDEFECT FOUNDCORRECTIVE ACTION
PRE-WORK:
1. Job briefing completed with crew
2. Hazard assessment reviewed
3. All workers are qualified for task
4. Energized work permit issued (if applicable)
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐ N/A
________ ________ ________ ________
LOCKOUT/TAGOUT:
5. LOTO equipment available and inspected
6. Energy sources identified and isolated
7. LOTO devices applied and verified
8. Stored energy dissipated
9. Zero voltage verified before work
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐
☐
________ ________ ________ ________ ________
PPE AND TOOLS:
10. Proper PPE available and worn
11. Rubber goods inspected and in date
12. Insulated tools in good condition
13. Test equipment working and calibrated
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐ N/A
☐
☐
________ ________ ________ ________
WORK AREA:
14. Work area clean and dry
15. Proper lighting provided
16. Barricades/signs in place
17. Approach boundaries marked
18. Fire extinguisher nearby
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐ N/A
☐
________ ________ ________ ________ ________
FALL PROTECTION:
19. Ladders in good condition and properly used
20. Aerial lift inspected and fall protection used
21. Scaffold safe and inspected
☐ Yes
☐ Yes
☐ Yes
☐
☐ N/A
☐ N/A
________ ________ ________
INSTALLATION QUALITY:
22. Proper wire type/size used
23. Conduit properly supported
24. Connections properly torqued
25. Grounding/bonding installed
26. Boxes/fittings properly secured
27. Cover plates installed
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐
☐
☐
________ ________ ________ ________ ________ ________

OVERALL ASSESSMENT:

Is electrical installation safe to continue? Yes ☐ No ☐ (If No, stop work immediately)

CORRECTIVE ACTIONS TAKEN:

______________

FOREMAN SIGNATURE: ______________ DATE: ___________

Temporary Power Installation Checklist

ITEM ________ Temporary Service Disconnect Overcurrent Protection GFCI Protection Panelboard Receptacles Extension Cords Cable Protection Grounding Bonding Generator Grounding Signs LightingREQUIREMENT ________ Properly sized, lockable Properly sized for load All 120V receptacles Weatherproof, dead front Weatherproof while in use 3-wire, grounded, in good cond Protected from damage System properly grounded Equipment bonded Properly grounded (if used) Voltage, "Warning" posted Adequate for work areasCOMPLIANT __________ Yes ☐ No☐ Yes ☐ No☐ Yes ☐ No☐ Yes ☐ No☐ Yes ☐ No☐ Yes ☐ No☐ Yes ☐ No☐ Yes ☐ No☐ Yes ☐ No☐ Yes ☐ No☐ Yes ☐ No☐ Yes ☐ No☐NOTES ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________

INSTALLED BY: ______________ DATE: ___________

INSPECTED BY: ______________ DATE: ___________

Electrical Installation PPE Requirements

BASE PPE (ALL ELECTRICAL WORK):

☐ Hard hat (non-conductive)

☐ Safety glasses with side shields

☐ High-visibility vest (as required)

☐ Steel-toed boots (non-conductive soles)

☐ Flame-resistant (FR) clothing (as required)

☐ Hearing protection (as required)

☐ Work gloves

ADDITIONAL PPE FOR ENERGIZED WORK (>50V):

☐ Rubber insulating gloves (proper class)

☐ Rubber insulating sleeves (if exposure above shoulder)

☐ Leather protectors (over rubber gloves)

☐ Arc-rated face shield or flash suit hood

☐ Arc-rated balaclava (if required)

☐ Arc-rated jacket/coat (if required)

☐ Arc-rated pants (if required)

☐ Arc-rated coverall (if required)

☐ Safety glasses under face shield

☐ Hearing protection inside arc hood

☐ Insulated mat/flooring

☐ Voltage-rated tools

PPE FOR SPECIFIC TASKS:

Conduit bending/threading: ☐ Leather gloves ☐ Safety glasses ☐ Hearing protection

Cable pulling: ☐ Leather gloves ☐ Safety glasses ☐ Steel-toed boots

Termination: ☐ Safety glasses ☐ Leather gloves ☐ Dust mask (if drilling)

Testing/troubleshooting: ☐ Rubber gloves ☐ Safety glasses ☐ Arc-rated PPE

Electrical Installation Emergency Response Plan

POTENTIAL EMERGENCIES:

☐ Electrical shock/electrocution ☐ Arc flash/explosion ☐ Fire ☐ Fall from height

☐ Medical emergency ☐ Burns ☐ Cardiac arrest ☐ Confined space rescue

EMERGENCY CONTACTS:

EMERGENCY: 911

Site Safety Officer: ______________ Phone: ______________

Electrical Supervisor: ______________ Phone: ______________

Project Manager: ______________ Phone: ______________

Nearest Hospital: ______________ Phone: ______________

Power Company Emergency: ______________ Phone: ______________

ELECTRICAL SHOCK EMERGENCY PROCEDURES:

1. DO NOT TOUCH VICTIM IF STILL IN CONTACT WITH POWER

2. De-energize power source if safe to do so (LOTO)

3. If cannot de-energize, use non-conductive material to separate victim

4. Call 911 immediately - advise "electrical shock"

5. Check for breathing/circulation - begin CPR if needed

6. Use AED if available and trained

7. Treat for shock - keep victim warm, elevate legs if no injuries

8. Cover burns with sterile dressing

9. Stay with victim until help arrives

ARC FLASH/BURN EMERGENCY PROCEDURES:

1. Stop - Drop - Roll if clothing on fire

2. Remove victim from source if safe

3. Call 911 immediately - advise "arc flash/burns"

4. Cool burns with cool water (not ice) for 10-15 minutes

5. Cover burns with sterile, non-stick dressing

6. Remove jewelry/constricting items

7. Monitor for shock - keep warm

8. DO NOT apply ointments/butter to burns

FIRE EMERGENCY PROCEDURES:

1. Sound alarm - call 911

2. If safe, use Class C fire extinguisher (CO2 or dry chemical)

3. DO NOT use water on electrical fires

4. De-energize power if safe to do so

5. Evacuate area - account for personnel

FIRST AID KIT LOCATION: ______________

EYE WASH STATION LOCATION: ______________

AED LOCATION: ______________

FIRE EXTINGUISHER LOCATION: ______________

EMERGENCY SHUTOFF LOCATION: ______________

ASSEMBLY POINT: ______________

Electrical Installation Training And Qualifications

QUALIFIED ELECTRICAL WORKERS:

Name: ______________ Cert #: ______________ Expiry: ___________

Name: ______________ Cert #: ______________ Expiry: ___________

Name: ______________ Cert #: ______________ Expiry: ___________

Name: ______________ Cert #: ______________ Expiry: ___________

TRAINING REQUIREMENTS: TOPIC ________ Electrical Safety Orientation NFPA 70E / Arc Flash Awareness Lockout/Tagout Procedures Energized Work Permit Process Rubber Goods Inspection & Care Ladder & Aerial Lift Safety CPR/First Aid/AED Emergency ProceduresTRAINER ________ ________ ________ ________ ________ ________ ________ ________ ________DATE ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ATTENDEES ________ ________ ________ ________ ________ ________ ________ ________ ________

COMPETENT PERSON DESIGNATION:

Name: ______________ Title: ______________ Experience: ______ years

Responsibilities:

☐ Daily electrical safety inspections

☐ Verify LOTO procedures followed

☐ Ensure proper PPE used

☐ Identify and correct hazards

☐ Approve energized work permits

☐ Stop work when unsafe conditions exist

Electrical Installation Permit And Authorizations

PERMIT TYPE ________ Electrical Permit Energized Work Permit Hot Work Permit Confined Space Entry Lockout/Tagout Waiver Utility Connection PermitISSUING AUTHORITY ________ ________ ________ ________ ________ ________ ________PERMIT # _____________ _____________ _____________ _____________ _____________ _____________ _____________ISSUE DATE ___________ ___________ ___________ ___________ ___________ ___________ ___________EXPIRY DATE ___________ ___________ ___________ ___________ ___________ ___________ ___________

NOTIFICATIONS COMPLETED:

☐ Utility company notified of connection Date: ___________ Contact: ______________

☐ AHJ notified for inspection Date: ___________ Inspection scheduled: ___________

Electrical Installation Risk Assessment Summary

OVERALL RISK ASSESSMENT:

Based on the identified hazards and existing controls, the overall risk level for this electrical installation:

☐ LOW - Routine installation with minimal hazards, controls adequate

☐ MEDIUM - Moderate hazards, requires ongoing monitoring

☐ HIGH - Significant hazards (energized work), requires strict controls

☐ EXTREME - Severe hazards - requires engineering controls and specialized oversight

CRITICAL CONTROLS REQUIRED:

1. ______________

2. ______________

3. ______________

4. ______________

5. ______________

WORK STOPPING AUTHORITY:

All personnel have the authority and responsibility to stop work if conditions become unsafe.

Stop work protocol: Notify supervisor immediately, secure area, correct condition before resuming.

Certification And Approval

MASTER ELECTRICIAN:

"I have reviewed this risk assessment and confirm that all electrical work will be performed in accordance

with NFPA 70 (NEC), NFPA 70E, and OSHA requirements."

Name: ______________ Signature: ______________ Date: ___________

License #: ______________

ELECTRICAL SUPERVISOR:

"I have reviewed this risk assessment and confirm that all workers are qualified and understand the hazards."

Name: ______________ Signature: ______________ Date: ___________

SAFETY OFFICER:

"I have verified that all safety requirements are met and that electrical work can proceed safely."

Name: ______________ Signature: ______________ Date: ___________

PROJECT MANAGER:

"I approve the electrical installation work and risk assessment."

Name: ______________ Signature: ______________ Date: ___________

NEXT REVIEW DATE: ______________

More templates