Free Demolition Operations Risk Assessment template for construction you can edit online and download as PDF. Covers demolition project information, pre-demolition engineering survey - osha 29 cfr 1926.850, hazardous materials sur
ASSESSMENT ID: DMO-__________ DATE: ______________ TIME: ______________
PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________
STRUCTURE TYPE: Building ☐ Bridge ☐ Industrial ☐ Other: ______________
HEIGHT: ______ m/ft FLOORS: ______ CONSTRUCTION: Wood ☐ Masonry ☐ Steel ☐ Concrete ☐
DEMOLITION METHOD: Mechanical ☐ Explosive ☐ Manual ☐ Deconstruction ☐
DEMOLITION ENGINEER: ______________ DEMOLITION SUPERVISOR: ______________
STRUCTURAL ASSESSMENT:
☐ Structure inspected by qualified engineer: ______________ Date: ___________
☐ Structural drawings reviewed: Yes ☐ No ☐ Source: ______________
☐ Condition of structural members assessed: Good ☐ Fair ☐ Poor ☐ Critical ☐
☐ Load-bearing walls identified: Yes ☐ No ☐
☐ Columns/beams requiring special handling: ______________
☐ Floor loading capacity assessed: ______ kPa (psf)
☐ Unstable/deficient members identified: ______________
ADJACENT STRUCTURES ASSESSMENT:
☐ Adjacent buildings: ______________ Distance: ______ m/ft
☐ Shoring/bracing required for adjacent structures? Yes ☐ No ☐ Details: ______________
☐ Public right-of-way adjacent? Yes ☐ No ☐ Distance: ______ m/ft
☐ Underground structures (basements, vaults): ______________
DEMOLITION SEQUENCE PLAN:
Plan reference: ______________ Prepared by: ______________ Date: ___________
Critical structural elements sequence: ______________
ENGINEER'S CERTIFICATION:
"I have inspected this structure and the demolition plans. The structure is safe for demolition using the
proposed methods and sequence."
Name: ______________ PE #: ______________ Date: ___________ Signature: ___________
ASBESTOS CONTAINING MATERIALS (ACM):
Survey completed by: ______________ Date: ___________ Lab: ______________
ACM identified? Yes ☐ No ☐ (If Yes, complete below)
| ACM LOCATION ________ ________ ________ | MATERIAL TYPE ________ ________ ________ | CONDITION ________ ________ ________ | ABATEMENT REQUIRED ________☐ Yes ☐ No ________☐ Yes ☐ No ________☐ Yes ☐ No | STATUS Completed ☐ Pending ☐ Completed ☐ Pending ☐ Completed ☐ Pending ☐ |
|---|
Abatement contractor: ______________ License #: ______________ Date: ___________
Final air clearance testing: Date: ___________ Results: Pass ☐ Fail ☐
LEAD BASED PAINT (LBP):
Testing completed? Yes ☐ No ☐ Date: ___________ Results: Positive ☐ Negative ☐
Lead abatement required? Yes ☐ No ☐ Contractor: ______________
OTHER HAZARDOUS MATERIALS:
☐ PCBs ☐ Mercury ☐ Radioactive materials ☐ Biological hazards ☐ Other: ______________
Details: ______________
Abatement status: ______________
CONFIRMATION: All hazardous materials removed prior to demolition? Yes ☐ No ☐
| UTILITY ________ Electric Gas Water Sewer Steam Telecom Other: __________ | PROVIDER ________ ________ ________ ________ ________ ________ ________ ________ | LOCATION ________ ________ ________ ________ ________ ________ ________ ________ | DISCONNECTED ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | DATE __________ __________ __________ __________ __________ __________ __________ __________ | VERIFIED BY ________ ________ ________ ________ ________ ________ ________ ________ |
|---|
VERIFICATION METHOD:
☐ Visual inspection ☐ Testing ☐ Provider confirmation ☐ Lockout/Tagout
TEMPORARY UTILITIES INSTALLED:
☐ Temporary power ☐ Temporary water ☐ Temporary lighting ☐ Other: ______________
| HAZARD | CAUSE | POTENTIAL CONSEQUENCE | EXISTING CONTROLS | LIKELIHOOD (1-5) | SEVERITY (1-5) | RISK RATING (L x S) |
|---|---|---|---|---|---|---|
| Uncontrolled Collapse | -Inadequate engineering survey -Wrong sequence -Weakened structure -Overloading -Vibration | -Multiple fatalities -Crush injuries -Equipment damage -Adjacent building damage | -Engineered demolition plan -Sequential demolition -Structural monitoring -Shoring/ bracing | 2 (Remote) | 5 (Catastrophic) | 10 (HIGH) |
| Hazardous Materials Exposure | -Disturbing ACM without abatement -Lead dust -Chemical release -Unknown materials | -Respiratory disease (asbestosis, cancer) -Lead poisoning -Chemical burns | -Pre- demolition survey -Proper abatement -PPE (respiratory) -Air monitoring | 3 (Occasional) | 5 (Catastrophic) | 15 (EXTREME) |
| Dust and Debris | -Demolition activities -Crushing operations -Material handling -Wind | -Respiratory irritation -Visibility reduction -Community complaints -Regulatory violations | -Water suppression (hoses, sprays) -Dust barriers -Respiratory protection -Enclosed chutes | 5 (Frequent) | 3 (Major) | 15 (HIGH) |
| Flying Debris | -Explosive demolition -Material impact -Structural failure -High winds | -Struck by debris -Eye injury -Head injury -Fatality | -Exclusion zones -Blast mats/ blankets -Barricades -PPE (hard hat, safety glasses) | 3 (Occasional) | 4 (Critical) | 12 (HIGH) |
| Equipment & Vehicle Operations | -Heavy equipment operation -Poor visibility -Multiple machines -Unstable ground | -Struck by equipment -Crush injuries -Roll-over -Collision | -Equipment operator training -Spotter -Exclusion zones -Backup alarms -Maintenance | 4 (Probable) | 4 (Critical) | 16 (EXTREME) |
| Falls from Height | -Working on partially demolished structure -Unprotected edges -Unstable work surface -Debris accumulation | -Fall from height -Fatalities -Paralysis | -Guardrails -Personal fall arrest -Scaffolding -Aerial lifts -Safe access platforms | 4 (Probable) | 5 (Catastrophic) | 20 (EXTREME) |
| Noise Pollution | -Heavy equipment -Impact demolition -Pneumatic tools -Multiple operations | -Hearing loss -Community complaints -Regulatory violations | -Hearing protection (hearing protection program) -Noise barriers -Work hour limits -Equipment selection | 5 (Frequent) | 3 (Major) | 15 (HIGH) |
| Vibration | -Heavy equipment -Impact demolition -Pile driving nearby -Blasting | -Structural damage to adjacent structures -Settlement -Cracks -Utility damage | -Vibration monitoring -Pre- demolition condition survey -Equipment selection -Distance limits | 3 (Occasional) | 3 (Major) | 9 (MEDIUM) |
DUST SUPPRESSION METHODS:
☐ Water spray (hoses, foggers) ☐ Misting cannons ☐ Wetting agents ☐ Enclosed chutes
☐ Negative pressure enclosures ☐ Dust collectors ☐ Vacuum systems ☐ Other: ______________
WATER SUPPLY:
Source: ______________ Pressure: ______ psi Flow rate: ______ L/min
Adequate for operations? Yes ☐ No ☐
AIR MONITORING:
Particulate monitoring required? Yes ☐ No ☐ Frequency: Continuous ☐ Periodic ☐
Action level: ______ μg/m³ Last reading: ______ μg/m³ Date: ___________
Exceedances? Yes ☐ No ☐ Actions taken: ______________
SILICA EXPOSURE ASSESSMENT:
Silica present? Yes ☐ No ☐ Exposure monitoring completed? Yes ☐ No ☐
Results: ______ μg/m³ PEL: 50 μg/m³ (8-hour TWA) Exceedance? Yes ☐ No ☐
Controls in place: ☐ Wet methods ☐ Local exhaust ☐ Respiratory protection
RESPIRATORY PROTECTION PROGRAM:
Required? Yes ☐ No ☐ Type: N95 ☐ N100 ☐ Half-face ☐ Full-face ☐ PAPR ☐
Fit testing current? Yes ☐ No ☐ Medical evaluations current? Yes ☐ No ☐
PUBLIC PROTECTION MEASURES:
☐ Perimeter fencing/barricades Type: ______________ Height: ______ m/ft
☐ Protected walkways/canopies Location: ______________ Width: ______ m/ft
☐ Signs posted: "DANGER - DEMOLITION - KEEP OUT" Locations: ______________
☐ Public notification: ______________ Date: ___________
☐ Community liaison: ______________ Phone: ______________
EXCLUSION ZONES:
Demolition zone radius: ______ m/ft Barricaded? Yes ☐ No ☐
Drop zone radius (1.5 x building height): ______ m/ft Barricaded? Yes ☐ No ☐
Equipment operation zone: ______ m/ft Barricaded? Yes ☐ No ☐
Blast zone (if explosive demolition): ______ m/ft Evacuation required? Yes ☐ No ☐
ACCESS CONTROL:
Gate locations: ______________ Guarded? Yes ☐ No ☐ Hours: ______________
Site security after hours? Yes ☐ No ☐ Method: ______________
DEMOLITION SEQUENCE:
Phase 1: ______________
Date: ___________ Supervisor: ______________ Crew: ______________
Phase 2: ______________
Date: ___________ Supervisor: ______________ Crew: ______________
Phase 3: ______________
Date: ___________ Supervisor: ______________ Crew: ______________
Phase 4: ______________
Date: ___________ Supervisor: ______________ Crew: ______________
Phase 5: ______________
Date: ___________ Supervisor: ______________ Crew: ______________
LOAD BEARING WALL/COLUMN REMOVAL SEQUENCE:
______________
______________
SHORING AND BRACING DURING DEMOLITION:
Type: ______________ Locations: ______________ Inspection frequency: ______________
BLASTING CONTRACTOR: ______________ LICENSE #: ______________
BLASTING ENGINEER: ______________ CERT #: ______________
BLAST DESIGN:
Number of delays: ______ Maximum charge per delay: ______ kg (lbs)
Total explosive weight: ______ kg (lbs) Type: ______________
BLAST AREA:
Evacuation zone radius: ______ m/ft Number of structures to evacuate: ______
Public notification completed? Yes ☐ No ☐ Date: ___________
BLAST MONITORING:
Seismographs: Number: ______ Locations: ______________
Vibration limits: ______ mm/sec (in/sec) Air blast limits: ______ dB
BLAST PROCEDURES:
Warning signals: 1st: ___________ 2nd: ___________ 3rd: ___________
All clear signal: ___________
Blast time scheduled: ___________ Actual blast time: ___________
POST-BLAST INSPECTION:
Date: ___________ Time: ___________ Inspector: ______________
Conditions: Safe ☐ Unsafe ☐ (If unsafe, actions: ______________)
INSPECTOR: ______________ DATE: ______________ TIME: ______________
WEATHER: ______________ WIND: ______ mph TEMP: ______°F/°C
| INSPECTION ITEM | SATISFACTORY | DEFECT FOUND | CORRECTIVE ACTION |
|---|---|---|---|
| PRE-WORK INSPECTION: 1. Structure stable - no signs of uncontrolled movement 2. Shoring/bracing in place and secure 3. No hazardous materials exposed 4. Utilities confirmed isolated 5. Adjacent structures stable - no new cracks | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ N/A ☐ ☐ ☐ | ________ ________ ________ ________ ________ |
| FALL PROTECTION: 6. Guardrails in place where required 7. PFAS available and inspected 8. Workers using fall protection correctly | ☐ Yes ☐ Yes ☐ Yes | ☐ N/A ☐ N/A ☐ | ________ ________ ________ |
| DUST CONTROL: 9. Dust suppression systems operating 10. Visible dust controlled 11. Respiratory protection being worn where required | ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ | ________ ________ ________ |
| PUBLIC PROTECTION: 12. Barricades/fencing in place and secure 13. Warning signs posted and legible 14. No unauthorized access observed 15. Protected walkways clear and safe | ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ N/A | ________ ________ ________ ________ |
| EQUIPMENT AND OPERATIONS: 16. Equipment in safe operating condition 17. Operators trained and authorized 18. Exclusion zones maintained 19. Communication systems working | ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ | ________ ________ ________ ________ |
| HOUSEKEEPING: 20. Debris being removed regularly 21. Material storage areas organized 22. Walkways and access clear | ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ | ________ ________ ________ |
| PPE: 23. Hard hats being worn 24. Safety glasses/goggles being worn 25. Hearing protection being worn where required 26. High-visibility clothing being worn 27. Respiratory protection being worn correctly | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ ☐ N/A | ________ ________ ________ ________ ________ |
OVERALL ASSESSMENT:
Is demolition safe to continue? Yes ☐ No ☐ (If No, stop work immediately)
CORRECTIVE ACTIONS TAKEN:
______________
______________
INSPECTOR SIGNATURE: ______________ DATE: ___________
| WASTE STREAM ________ Concrete/Masonry Steel/Metal Wood Asbestos (if any) Hazardous Waste General Debris | CONTAINER TYPE ________ ________ ________ ________ ________ ________ ________ | HAULER ________ ________ ________ ________ ________ ________ ________ | DISPOSAL FACILITY ________ ________ ________ ________ ________ ________ ________ | MANIFEST # ________ ________ ________ ________ ________ ________ ________ |
|---|
RECYCLING PROGRAM:
Materials recycled: ☐ Concrete (crush on site) ☐ Metal ☐ Wood ☐ Other: ______________
Recycling rate target: ______% Current: ______%
POTENTIAL EMERGENCIES:
☐ Structural collapse ☐ Fire ☐ Explosion ☐ Toxic release ☐ Medical emergency
☐ Utility strike ☐ Equipment accident ☐ Public intrusion ☐ Severe weather
EMERGENCY CONTACTS:
EMERGENCY (Police/Fire/Ambulance): 911
Site Safety Officer: ______________ Phone: ______________
Demolition Supervisor: ______________ Phone: ______________
Project Manager: ______________ Phone: ______________
Company Safety Director: ______________ Phone: ______________
Nearest Hospital: ______________ Phone: ______________
Poison Control: 1-800-222-1222
Utility Emergency: Electric: _________ Gas: _________ Water: _________
EMERGENCY PROCEDURES:
STRUCTURAL COLLAPSE:
1. Clear the area immediately - evacuate to assembly point
2. Account for all personnel - conduct head count
3. Call 911 - advise of collapse and potential trapped workers
4. DO NOT re-enter structure - wait for emergency services
5. Secure the perimeter - prevent unauthorized access
FIRE/EXPLOSION:
1. Sound alarm - evacuate immediately
2. Call 911 - provide location and nature of fire
3. If safe, use fire extinguishers on small fires
4. Account for all personnel at assembly point
5. Isolate fuel/power sources if safe to do so
MEDICAL EMERGENCY:
1. Assess scene safety - DO NOT become victim
2. Call 911 - provide location and nature of injury
3. Provide first aid/CPR if trained
4. Direct emergency responders to scene
5. Complete incident report
HAZARDOUS MATERIALS RELEASE:
1. Evacuate affected area - upwind if possible
2. Call 911 - identify material if known
3. Notify site supervisor immediately
4. Isolate area - restrict access
5. Contact environmental authorities if required
EVACUATION ROUTES:
Primary: ______________
Secondary: ______________
Assembly Point: ______________
FIRST AID STATIONS:
Location 1: ______________ Location 2: ______________
FIRE EXTINGUISHERS:
Type: ABC ☐ CO2 ☐ Water ☐ Class D (metal) ☐
Locations: ______________
Inspection date: ___________ By: ______________
EMERGENCY DRILLS:
Last drill date: ___________ Next drill date: ___________
Drill type: Evacuation ☐ Fire ☐ Medical ☐ Spill ☐
| EQUIPMENT TYPE ________ Fire Extinguishers First Aid Kits Eye Wash Stations Emergency Showers Spill Kits Communication Devices Emergency Lighting Backup Power | LOCATION ________ ________ ________ ________ ________ ________ ________ ________ ________ | LAST INSPECTED ________ ________ ________ ________ ________ ________ ________ ________ ________ | CONDITION ___________ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ | NEXT INSPECTION ________ ________ ________ ________ ________ ________ ________ ________ ________ |
|---|
INSPECTED BY: ______________ DATE: ___________
REPORTING REQUIREMENTS:
☐ OSHA (within 8 hours for fatality, 24 hours for hospitalization/amputation)
☐ State/local authorities ☐ Insurance carrier ☐ Company management
INCIDENT INVESTIGATION TEAM:
Lead Investigator: ______________ Date: ___________
Team Members: ______________
INVESTIGATION PROCEDURE:
1. Secure the scene - preserve evidence
2. Document with photos/videos
3. Interview witnesses
4. Review relevant documentation
5. Identify root causes
6. Develop corrective actions
7. Implement preventive measures
8. Share lessons learned
| CORRECTIVE ACTION TRACKING: Action Item ________ ________ ________ | Responsible ________ ________ ________ | Due Date _____________ _____________ _____________ | Status _____________ _____________ _____________ | Closure Date ________ ________ ________ |
|---|
TRAINING REQUIREMENTS - OSHA 29 CFR 1926.21
| TOPIC ________ Demolition Safety Orientation Hazard Communication (HAZCOM) Asbestos Awareness Lead Awareness Fall Protection Heavy Equipment Safety Respiratory Protection First Aid/CPR Fire Extinguisher Use Site-Specific Demolition Plan Emergency Procedures | TRAINER ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ | DATE ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ ___________ | ATTENDEES ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ ________ |
|---|
COMPETENCY VERIFICATION:
I confirm that all personnel assigned to demolition operations have received appropriate training and
are competent to perform their assigned tasks safely.
Supervisor Signature: ______________ Date: ___________
| PERMIT TYPE ________ Demolition Permit Asbestos Abatement Permit Blasting Permit Environmental Permit Road Closure Permit Other: ______________ | ISSUING AUTHORITY ________ ________ ________ ________ ________ ________ ________ | PERMIT # _____________ _____________ _____________ _____________ _____________ _____________ _____________ | ISSUE DATE ___________ ___________ ___________ ___________ ___________ ___________ ___________ | EXPIRY DATE ___________ ___________ ___________ ___________ ___________ ___________ ___________ |
|---|
NOTIFICATIONS COMPLETED:
☐ OSHA (if > 5 employees, 1926.850) Date: ___________ Confirmation #: ______________
☐ Local building department Date: ___________ Contact: ______________
☐ Fire department Date: ___________ Contact: ______________
☐ Police department Date: ___________ Contact: ______________
☐ Utility companies Date: ___________ Details: ______________
☐ Adjacent property owners Date: ___________ Method: ______________
☐ Community notification Date: ___________ Method: ______________
OVERALL RISK ASSESSMENT:
Based on the identified hazards and existing controls, the overall risk level for this demolition project is:
☐ LOW - Routine demolition with minimal hazards, controls adequate
☐ MEDIUM - Moderate hazards, requires ongoing monitoring
☐ HIGH - Significant hazards, requires active controls and frequent inspection
☐ EXTREME - Severe hazards, requires engineering controls and specialized oversight
CRITICAL CONTROLS REQUIRED:
1. ______________
2. ______________
3. ______________
4. ______________
5. ______________
MONITORING FREQUENCY:
☐ Continuous monitoring required ☐ Hourly ☐ Daily ☐ Weekly
☐ Pre-operation inspection required each shift
☐ Structural engineer inspection frequency: ______________
COMPETENT PERSON DESIGNATION:
Name: ______________ Title: ______________ Phone: ______________
Qualifications: ______________
WORK STOPPING AUTHORITY:
All personnel have the authority and responsibility to stop work if conditions become unsafe.
Stop work protocol: ______________
DEMOLITION SUPERVISOR:
"I have reviewed this risk assessment and confirm that all identified hazards have been addressed with
appropriate controls. All required permits and notifications are complete."
Name: ______________ Signature: ______________ Date: ___________
PROJECT MANAGER:
"I approve the demolition plan and risk assessment. Resources are allocated for all required controls."
Name: ______________ Signature: ______________ Date: ___________
SAFETY OFFICER:
"I have verified that all safety requirements are met and that the demolition can proceed safely."
Name: ______________ Signature: ______________ Date: ___________
COMPETENT PERSON (Demolition):
"I will conduct daily inspections and ensure compliance with the demolition plan."
Name: ______________ Signature: ______________ Date: ___________
NEXT REVIEW DATE: ______________