Free Concrete Placement Risk Assessment template for construction you can edit online and download as PDF. Covers concrete placement project information, formwork design and engineering - aci 347, formwork inspection checklist.
ASSESSMENT ID: CONC-__________ DATE: ______________ TIME: ______________
PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________
PLACEMENT TYPE:
☐ Foundation/Slab ☐ Walls ☐ Columns ☐ Beams ☐ Elevated Deck ☐ Precast ☐ Other: ______________
CONCRETE SPECIFICATIONS:
Volume: ______ m³ (yd³) Pour Rate: ______ m³/hr Slump: ______ mm (in)
Concrete Type: ☐ Standard ☐ High-Strength ☐ Lightweight ☐ Self-Consolidating ☐ Other: ______________
Pumping Required? Yes ☐ No ☐ Pump Type: ☐ Boom ☐ Line ☐ Trailer-mounted
STRUCTURAL ENGINEER: ______________ CONCRETE SUPERVISOR: ______________
PLACEMENT DATE: ______________ INSPECTION DATE: ______________
FORMWORK DESIGN:
☐ Designed by qualified engineer: ______________ Date: ___________
☐ Design drawings available: Yes ☐ No ☐ Drawing #: ______________
☐ Load calculations completed: Yes ☐ No ☐
- Concrete pressure: ______ psf (kPa) - Live loads: ______ psf (kPa)
- Wind loads: ______ psf (kPa) - Impact loads: ______ psf (kPa)
☐ Deflection limits established: ______ mm (in)
FORMWORK MATERIALS:
☐ Plywood (thickness: ______ mm) ☐ Lumber (size: ______) ☐ Steel forms ☐ Aluminum forms
☐ Engineered formwork system: ______________
☐ Ties/anchors: Type: ______________ Spacing: ______ Capacity: ______ lbs
SHORING AND RESHORING:
☐ Shoring plan provided ☐ Shore spacing: ______ ☐ Shore capacity: ______ lbs
☐ Reshoring required? Yes ☐ No ☐ ☐ Reshore placement plan
☐ Removal time based on concrete strength: ______ psi at ______ days
ENGINEER'S CERTIFICATION:
"I certify that this formwork design meets ACI 347 requirements and is safe for the intended concrete
placement operations."
Name: ______________ PE #: ______________ Date: ___________ Signature: ___________
INSPECTOR: ______________ DATE: ______________ TIME: ______________
| INSPECTION ITEM | SATISFACTORY | DEFECT FOUND | CORRECTIVE ACTION |
|---|---|---|---|
| FOUNDATION/SUPPORT: 1. Base/ground adequately compacted and level 2. Mud sills/sole plates adequate and undamaged 3. Shoring posts plumb and properly braced 4. Base plates/jacks secure and adjusted | ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ N/A ☐ ☐ | ________ ________ ________ ________ |
| FORMWORK ASSEMBLY: 5. Form panels properly aligned and plumb 6. All connections/tie points secured 7. Form ties installed per design (spacing/pattern) 8. Wales/stiffeners in place and secured 9. No damaged/warped form materials in use | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ ☐ | ________ ________ ________ ________ ________ |
| BRACING AND STABILITY: 10. Horizontal bracing installed as required 11. Diagonal bracing installed as required 12. Lateral stability ensured for entire assembly 13. Formwork tied to structure where required | ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ N/A | ________ ________ ________ ________ |
| ACCESS AND WORK PLATFORMS: 14. Work platforms provided for workers 15. Guardrails/fall protection in place 16. Access ladders/stairs safe and secure 17. Toeboards installed to prevent falling objects | ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ ☐ | ________ ________ ________ ________ |
| PRE-POUR PREPARATIONS: 18. Form release agent applied properly 19. All joints sealed to prevent grout loss 20. Inserts/embeds correctly positioned 21. Reinforcement in place and inspected 22. Clean-out doors provided at bottom 23. Debris removed from forms | ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes ☐ Yes | ☐ ☐ ☐ N/A ☐ ☐ N/A ☐ | ________ ________ ________ ________ ________ ________ |
OVERALL ASSESSMENT:
Is formwork safe for concrete placement? Yes ☐ No ☐ (If No, DO NOT POUR)
CORRECTIVE ACTIONS TAKEN:
______________
INSPECTOR SIGNATURE: ______________ DATE: ___________
PUMPING EQUIPMENT:
Pump Type: ______________ Manufacturer: ______________ Model: ______________
Pump Capacity: ______ m³/hr Boom Length: ______ m (ft) Last Inspection: ___________
Operator: ______________ Certified? Yes ☐ No ☐ Certification #: ______________
PUMP SETUP:
☐ Pump placed on stable, level ground
☐ Outriggers fully extended and on adequate pads
☐ Clearance from overhead power lines: ______ m (ft) (minimum 3m for <50kV, more for higher)
☐ Hopper grate in place and secure
☐ All hose couplings/whip checks installed
☐ Pipeline supported at ______ m (ft) intervals
☐ End hose secured to prevent whipping
| PUMP LINE INSPECTION: Component ________ Delivery Line Couplings Hoses Reducers End Hose | Condition ____________ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ | Last Test _____________ _____________ _____________ _____________ _____________ _____________ | Next Test _____________ _____________ _____________ _____________ _____________ _____________ | Replacement Due ________ ________ ________ ________ ________ ________ |
|---|
PUMPING PROCEDURES:
☐ Prime pump with grout before concrete
☐ Radio/communication system between pump operator and placement crew
☐ Established hand signals posted
☐ Reverse pumping procedure understood
☐ Blockage clearing procedure established (NEVER exceed rated pressure)
☐ Emergency stop locations identified
PUMP OPERATOR CHECKS:
Pre-pump inspection completed? Yes ☐ No ☐ Date: ___________
Water level checked? Yes ☐ No ☐ Hydraulic fluid checked? Yes ☐ No ☐
Lubrication checked? Yes ☐ No ☐
| HAZARD | CAUSE | POTENTIAL CONSEQUENCE | EXISTING CONTROLS | LIKELIHOOD (1-5) | SEVERITY (1-5) | RISK RATING (L x S) |
|---|---|---|---|---|---|---|
| Formwork Failure | -Inadequate design -Insufficient bracing -Premature stripping -Overloading -Vibration from placing equipment | -Worker fatalities/ injuries -Concrete loss -Property damage -Schedule delays | -Engineered design -Proper material selection -Qualified inspector -Pour rate limits -Shore monitoring | 2 (Remote) | 5 (Catastrophic) | 10 (HIGH) |
| Concrete Pumping Hazards | -Line rupture -Hose whip -Blockage clearing -Outrigger failure -Boom contact with power lines -Poor communi- cation | -High pressure injection injury -Struck by hose -Crush injuries -Electro- cution | -Equipment inspection -Whip checks -Pressure gauges -Exclusion zone -Radio communi- cation -Power line clearance | 3 (Occasional) | 4 (Critical) | 12 (HIGH) |
| Chemical Exposure/ Burns | -Cement contact -Wet concrete on skin -Inhalation of cement dust -Additives (accelerators, retarders) | -Skin burns -Respiratory irritation -Eye damage -Chemical pneumonia -Allergic reaction (chromium) | -PPE (rubber boots, gloves, protective clothing) -Eye wash stations -Wash facilities -SDS review -Training | 4 (Probable) | 3 (Major) | 12 (HIGH) |
| Concrete Placement Ergonomics | -Vibration from vibrators -Repetitive motion -Heavy lifting -Awkward postures -Prolonged standing | -Musculo- skeletal disorders (HAVS) -Back injuries -Fatigue | -Equipment with anti- vibration handles -Job rotation -Mechanical aids -Team lifting -Anti- fatigue mats | 4 (Probable) | 2 (Minor) | 8 (MEDIUM) |
| Finishing Operations | -Working on wet surfaces -Power trowels -Wet conditions -Electrical cords in water -Edge work near drops | -Slips/falls -Electrocution -Cuts from tools -Muscle strain | -Non-slip boots -GFCI protected circuits -Tool guards -Work rotation -Edge protection | 4 (Probable) | 3 (Major) | 12 (HIGH) |
| Stripping Formwork | -Premature removal -Improper sequence -Heavy forms handling -Stuck forms releasing suddenly | -Structural failure -Form collapse -Falling materials -Crush injuries | -Concrete strength testing -Stripping plan -Proper sequence -Mechanical aids -Barricades | 3 (Occasional) | 4 (Critical) | 12 (HIGH) |
| Curing Operations | -Hot weather conditions -Cold weather conditions -Improper curing method -Chemical curing compounds | -Concrete cracking -Surface defects -Delayed strength gain -Chemical exposure | -Temperature monitoring -Curing compounds -Wet coverings -Heating/ cooling systems -PPE | 3 (Occasional) | 2 (Minor) | 6 (LOW) |
PLACEMENT METHOD:
☐ Pump ☐ Bucket & Crane ☐ Conveyor ☐ Chute ☐ Buggy ☐ Direct discharge
POUR SEQUENCE:
Phase 1: ______________
Start Time: ___________ End Time: ___________ Volume: ______ m³
Phase 2: ______________
Start Time: ___________ End Time: ___________ Volume: ______ m³
Phase 3: ______________
Start Time: ___________ End Time: ___________ Volume: ______ m³
Phase 4: ______________
Start Time: ___________ End Time: ___________ Volume: ______ m³
COLD JOINTS:
Maximum time between lifts: ______ minutes Locations allowed: ______________
VIBRATION PLAN:
Vibrator type: ______ Number of vibrators: ______ Operator: ______________
Vibration procedure: ______________
Avoid over-vibration: Yes ☐ No ☐
CONSOLIDATION CHECKS:
Visual inspection frequency: ______________ Test method: ______________
TESTING LABORATORY: ______________ TECHNICIAN: ______________
| TEST TYPE ________ Slump Temperature Air Content Unit Weight Compressive Strength (Cylinders) | FREQUENCY _____________ Every ______ Every ______ Every ______ Every ______ Every ______ | SAMPLED BY _____________ _____________ _____________ _____________ _____________ _____________ | RESULTS _____________ _____________ _____________ _____________ _____________ _____________ | ACCEPTABLE (Y/N) ________ ________ ________ ________ ________ ________ |
|---|
| TEST CYLINDER TRACKING: Cylinder Set # ________ ________ ________ ________ | Cast Date ___________ ___________ ___________ ___________ | Break Date _____________ _____________ _____________ _____________ | Strength (psi) ________ ________ ________ ________ | Required Strength ________ ________ ________ ________ | Pass/Fail ___________ ___________ ___________ ___________ |
|---|
NON-DESTRUCTIVE TESTING:
Test method: ☐ Rebound hammer ☐ Windsor probe ☐ Ultrasonic ☐ Other: ______________
Results: ______________
CONCRETE STRENGTH FOR FORMWORK REMOVAL:
Required strength for stripping: ______ psi Achieved at: ______ days
Stripping authorized by engineer? Yes ☐ No ☐ Date: ___________
DATE: ______________ SUPERVISOR: ______________ WEATHER: ______________
| TIME __________ __________ __________ __________ __________ | ACTIVITY ________ ________ ________ ________ ________ | CREW SIZE _________ _________ _________ _________ _________ | EQUIPMENT ____________ ____________ ____________ ____________ ____________ | CONCRETE VOL ____________ ____________ ____________ ____________ ____________ | NOTES ________ ________ ________ ________ ________ |
|---|
DELAYS/ISSUES ENCOUNTERED:
______________
CORRECTIVE ACTIONS TAKEN:
______________
SIGNATURE: ______________
REQUIRED PPE:
☐ Hard hat
☐ Safety glasses with side shields
☐ High-visibility vest
☐ Steel-toed rubber boots (waterproof)
☐ Waterproof gloves
☐ Rain gear (if required)
☐ Knee pads (for finishing work)
☐ Hearing protection (near pumps/vibrators)
☐ Respiratory protection (if silica exposure)
☐ Fall protection (if working at height)
SPECIAL PPE FOR PUMP OPERATORS:
☐ Full face shield ☐ Chemical-resistant suit ☐ Neoprene gloves ☐ Rubber apron
POTENTIAL EMERGENCIES:
☐ Formwork failure/collapse ☐ Concrete pump accident ☐ Medical emergency
☐ Chemical exposure/burns ☐ Concrete washout spill ☐ Equipment accident
☐ Electrical contact ☐ Fall from height ☐ Concrete embedment
EMERGENCY CONTACTS:
EMERGENCY: 911
Site Safety Officer: ______________ Phone: ______________
Concrete Supervisor: ______________ Phone: ______________
Project Manager: ______________ Phone: ______________
Nearest Hospital: ______________ Phone: ______________
Poison Control: 1-800-222-1222
CHEMICAL EXPOSURE PROCEDURES:
Eyes: Flush with water for 15 minutes minimum
Skin: Remove contaminated clothing, wash thoroughly with water
Inhalation: Move to fresh air, seek medical attention if symptoms persist
Ingestion: Do NOT induce vomiting, seek immediate medical attention
CONCRETE WASHOUT PROCEDURES:
Designated washout area: ______________
Spill kit location: ______________
Procedure: ______________
FIRST AID STATIONS:
Location 1: ______________ Location 2: ______________
EYE WASH STATIONS:
Location 1: ______________ Location 2: ______________
OVERALL RISK ASSESSMENT:
Based on the identified hazards and existing controls, the overall risk level for this concrete placement is:
☐ LOW - Routine placement with minimal hazards, controls adequate
☐ MEDIUM - Moderate hazards, requires ongoing monitoring
☐ HIGH - Significant hazards, requires active controls and frequent inspection
☐ EXTREME - Severe hazards, requires engineering controls and specialized oversight
CRITICAL CONTROLS REQUIRED:
1. ______________
2. ______________
3. ______________
4. ______________
5. ______________
POUR APPROVAL:
I have inspected the formwork, reinforcing steel, embeds, and placement equipment. All conditions are
satisfactory for concrete placement to proceed safely.
Inspector: ______________ Signature: ______________ Date: ___________
Concrete Supervisor: ______________ Signature: ______________ Date: ___________
POUR START TIME: ______________ POUR END TIME: ______________