Concrete Placement Risk Assessment template

Free Concrete Placement Risk Assessment template for construction you can edit online and download as PDF. Covers concrete placement project information, formwork design and engineering - aci 347, formwork inspection checklist.

Concrete Placement Project Information

ASSESSMENT ID: CONC-__________ DATE: ______________ TIME: ______________

PROJECT: ______________ LOCATION: ______________ CONTRACTOR: ______________

PLACEMENT TYPE:

☐ Foundation/Slab ☐ Walls ☐ Columns ☐ Beams ☐ Elevated Deck ☐ Precast ☐ Other: ______________

CONCRETE SPECIFICATIONS:

Volume: ______ m³ (yd³) Pour Rate: ______ m³/hr Slump: ______ mm (in)

Concrete Type: ☐ Standard ☐ High-Strength ☐ Lightweight ☐ Self-Consolidating ☐ Other: ______________

Pumping Required? Yes ☐ No ☐ Pump Type: ☐ Boom ☐ Line ☐ Trailer-mounted

STRUCTURAL ENGINEER: ______________ CONCRETE SUPERVISOR: ______________

PLACEMENT DATE: ______________ INSPECTION DATE: ______________

Formwork Design And Engineering - Aci 347

FORMWORK DESIGN:

☐ Designed by qualified engineer: ______________ Date: ___________

☐ Design drawings available: Yes ☐ No ☐ Drawing #: ______________

☐ Load calculations completed: Yes ☐ No ☐

- Concrete pressure: ______ psf (kPa) - Live loads: ______ psf (kPa)

- Wind loads: ______ psf (kPa) - Impact loads: ______ psf (kPa)

☐ Deflection limits established: ______ mm (in)

FORMWORK MATERIALS:

☐ Plywood (thickness: ______ mm) ☐ Lumber (size: ______) ☐ Steel forms ☐ Aluminum forms

☐ Engineered formwork system: ______________

☐ Ties/anchors: Type: ______________ Spacing: ______ Capacity: ______ lbs

SHORING AND RESHORING:

☐ Shoring plan provided ☐ Shore spacing: ______ ☐ Shore capacity: ______ lbs

☐ Reshoring required? Yes ☐ No ☐ ☐ Reshore placement plan

☐ Removal time based on concrete strength: ______ psi at ______ days

ENGINEER'S CERTIFICATION:

"I certify that this formwork design meets ACI 347 requirements and is safe for the intended concrete

placement operations."

Name: ______________ PE #: ______________ Date: ___________ Signature: ___________

Formwork Inspection Checklist

INSPECTOR: ______________ DATE: ______________ TIME: ______________

INSPECTION ITEMSATISFACTORYDEFECT FOUNDCORRECTIVE ACTION
FOUNDATION/SUPPORT:
1. Base/ground adequately compacted and level
2. Mud sills/sole plates adequate and undamaged
3. Shoring posts plumb and properly braced
4. Base plates/jacks secure and adjusted
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐ N/A
☐
☐
________ ________ ________ ________
FORMWORK ASSEMBLY:
5. Form panels properly aligned and plumb
6. All connections/tie points secured
7. Form ties installed per design (spacing/pattern)
8. Wales/stiffeners in place and secured
9. No damaged/warped form materials in use
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐
☐
________ ________ ________ ________ ________
BRACING AND STABILITY:
10. Horizontal bracing installed as required
11. Diagonal bracing installed as required
12. Lateral stability ensured for entire assembly
13. Formwork tied to structure where required
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐ N/A
________ ________ ________ ________
ACCESS AND WORK PLATFORMS:
14. Work platforms provided for workers
15. Guardrails/fall protection in place
16. Access ladders/stairs safe and secure
17. Toeboards installed to prevent falling objects
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐
☐
________ ________ ________ ________
PRE-POUR PREPARATIONS:
18. Form release agent applied properly
19. All joints sealed to prevent grout loss
20. Inserts/embeds correctly positioned
21. Reinforcement in place and inspected
22. Clean-out doors provided at bottom
23. Debris removed from forms
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐ Yes
☐
☐
☐ N/A
☐
☐ N/A
☐
________ ________ ________ ________ ________ ________

OVERALL ASSESSMENT:

Is formwork safe for concrete placement? Yes ☐ No ☐ (If No, DO NOT POUR)

CORRECTIVE ACTIONS TAKEN:

______________

INSPECTOR SIGNATURE: ______________ DATE: ___________

Concrete Pumping Safety - Aci 304.2R

PUMPING EQUIPMENT:

Pump Type: ______________ Manufacturer: ______________ Model: ______________

Pump Capacity: ______ m³/hr Boom Length: ______ m (ft) Last Inspection: ___________

Operator: ______________ Certified? Yes ☐ No ☐ Certification #: ______________

PUMP SETUP:

☐ Pump placed on stable, level ground

☐ Outriggers fully extended and on adequate pads

☐ Clearance from overhead power lines: ______ m (ft) (minimum 3m for <50kV, more for higher)

☐ Hopper grate in place and secure

☐ All hose couplings/whip checks installed

☐ Pipeline supported at ______ m (ft) intervals

☐ End hose secured to prevent whipping

PUMP LINE INSPECTION: Component ________ Delivery Line Couplings Hoses Reducers End HoseCondition ____________ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐ Good ☐ Bad ☐Last Test _____________ _____________ _____________ _____________ _____________ _____________Next Test _____________ _____________ _____________ _____________ _____________ _____________Replacement Due ________ ________ ________ ________ ________ ________

PUMPING PROCEDURES:

☐ Prime pump with grout before concrete

☐ Radio/communication system between pump operator and placement crew

☐ Established hand signals posted

☐ Reverse pumping procedure understood

☐ Blockage clearing procedure established (NEVER exceed rated pressure)

☐ Emergency stop locations identified

PUMP OPERATOR CHECKS:

Pre-pump inspection completed? Yes ☐ No ☐ Date: ___________

Water level checked? Yes ☐ No ☐ Hydraulic fluid checked? Yes ☐ No ☐

Lubrication checked? Yes ☐ No ☐

Concrete Placement Hazard Identification And Risk Assessment

HAZARDCAUSEPOTENTIAL CONSEQUENCEEXISTING CONTROLSLIKELIHOOD (1-5)SEVERITY (1-5)RISK RATING (L x S)
Formwork Failure-Inadequate design
-Insufficient bracing
-Premature stripping
-Overloading
-Vibration from placing equipment
-Worker fatalities/ injuries
-Concrete loss
-Property damage
-Schedule delays
-Engineered design
-Proper material selection
-Qualified inspector
-Pour rate limits
-Shore monitoring
2 (Remote)5 (Catastrophic)10 (HIGH)
Concrete Pumping Hazards-Line rupture
-Hose whip
-Blockage clearing
-Outrigger failure
-Boom contact with power lines
-Poor communi- cation
-High pressure injection injury
-Struck by hose
-Crush injuries
-Electro- cution
-Equipment inspection
-Whip checks
-Pressure gauges
-Exclusion zone
-Radio communi- cation
-Power line clearance
3 (Occasional)4 (Critical)12 (HIGH)
Chemical Exposure/ Burns-Cement contact
-Wet concrete on skin
-Inhalation of cement dust
-Additives (accelerators, retarders)
-Skin burns
-Respiratory irritation
-Eye damage
-Chemical pneumonia
-Allergic reaction (chromium)
-PPE (rubber boots, gloves, protective clothing)
-Eye wash stations
-Wash facilities
-SDS review
-Training
4 (Probable)3 (Major)12 (HIGH)
Concrete Placement Ergonomics-Vibration from vibrators
-Repetitive motion
-Heavy lifting
-Awkward postures
-Prolonged standing
-Musculo- skeletal disorders (HAVS)
-Back injuries
-Fatigue
-Equipment with anti- vibration handles
-Job rotation
-Mechanical aids
-Team lifting
-Anti- fatigue mats
4 (Probable)2 (Minor)8 (MEDIUM)
Finishing Operations-Working on wet surfaces
-Power trowels
-Wet conditions
-Electrical cords in water
-Edge work near drops
-Slips/falls
-Electrocution
-Cuts from tools
-Muscle strain
-Non-slip boots
-GFCI protected circuits
-Tool guards
-Work rotation
-Edge protection
4 (Probable)3 (Major)12 (HIGH)
Stripping Formwork-Premature removal
-Improper sequence
-Heavy forms handling
-Stuck forms releasing suddenly
-Structural failure
-Form collapse
-Falling materials
-Crush injuries
-Concrete strength testing
-Stripping plan
-Proper sequence
-Mechanical aids
-Barricades
3 (Occasional)4 (Critical)12 (HIGH)
Curing Operations-Hot weather conditions
-Cold weather conditions
-Improper curing method
-Chemical curing compounds
-Concrete cracking
-Surface defects
-Delayed strength gain
-Chemical exposure
-Temperature monitoring
-Curing compounds
-Wet coverings
-Heating/ cooling systems
-PPE
3 (Occasional)2 (Minor)6 (LOW)

Concrete Placement Plan And Sequence

PLACEMENT METHOD:

☐ Pump ☐ Bucket & Crane ☐ Conveyor ☐ Chute ☐ Buggy ☐ Direct discharge

POUR SEQUENCE:

Phase 1: ______________

Start Time: ___________ End Time: ___________ Volume: ______ m³

Phase 2: ______________

Start Time: ___________ End Time: ___________ Volume: ______ m³

Phase 3: ______________

Start Time: ___________ End Time: ___________ Volume: ______ m³

Phase 4: ______________

Start Time: ___________ End Time: ___________ Volume: ______ m³

COLD JOINTS:

Maximum time between lifts: ______ minutes Locations allowed: ______________

VIBRATION PLAN:

Vibrator type: ______ Number of vibrators: ______ Operator: ______________

Vibration procedure: ______________

Avoid over-vibration: Yes ☐ No ☐

CONSOLIDATION CHECKS:

Visual inspection frequency: ______________ Test method: ______________

Concrete Testing And Quality Control

TESTING LABORATORY: ______________ TECHNICIAN: ______________

TEST TYPE ________ Slump Temperature Air Content Unit Weight Compressive Strength (Cylinders)FREQUENCY _____________ Every ______ Every ______ Every ______ Every ______ Every ______SAMPLED BY _____________ _____________ _____________ _____________ _____________ _____________RESULTS _____________ _____________ _____________ _____________ _____________ _____________ACCEPTABLE (Y/N) ________ ________ ________ ________ ________ ________
TEST CYLINDER TRACKING: Cylinder Set # ________ ________ ________ ________Cast Date ___________ ___________ ___________ ___________Break Date _____________ _____________ _____________ _____________Strength (psi) ________ ________ ________ ________Required Strength ________ ________ ________ ________Pass/Fail ___________ ___________ ___________ ___________

NON-DESTRUCTIVE TESTING:

Test method: ☐ Rebound hammer ☐ Windsor probe ☐ Ultrasonic ☐ Other: ______________

Results: ______________

CONCRETE STRENGTH FOR FORMWORK REMOVAL:

Required strength for stripping: ______ psi Achieved at: ______ days

Stripping authorized by engineer? Yes ☐ No ☐ Date: ___________

Concrete Placement Daily Log

DATE: ______________ SUPERVISOR: ______________ WEATHER: ______________

TIME __________ __________ __________ __________ __________ACTIVITY ________ ________ ________ ________ ________CREW SIZE _________ _________ _________ _________ _________EQUIPMENT ____________ ____________ ____________ ____________ ____________CONCRETE VOL ____________ ____________ ____________ ____________ ____________NOTES ________ ________ ________ ________ ________

DELAYS/ISSUES ENCOUNTERED:

______________

CORRECTIVE ACTIONS TAKEN:

______________

SIGNATURE: ______________

Concrete Placement PPE Requirements

REQUIRED PPE:

☐ Hard hat

☐ Safety glasses with side shields

☐ High-visibility vest

☐ Steel-toed rubber boots (waterproof)

☐ Waterproof gloves

☐ Rain gear (if required)

☐ Knee pads (for finishing work)

☐ Hearing protection (near pumps/vibrators)

☐ Respiratory protection (if silica exposure)

☐ Fall protection (if working at height)

SPECIAL PPE FOR PUMP OPERATORS:

☐ Full face shield ☐ Chemical-resistant suit ☐ Neoprene gloves ☐ Rubber apron

Concrete Placement Emergency Response Plan

POTENTIAL EMERGENCIES:

☐ Formwork failure/collapse ☐ Concrete pump accident ☐ Medical emergency

☐ Chemical exposure/burns ☐ Concrete washout spill ☐ Equipment accident

☐ Electrical contact ☐ Fall from height ☐ Concrete embedment

EMERGENCY CONTACTS:

EMERGENCY: 911

Site Safety Officer: ______________ Phone: ______________

Concrete Supervisor: ______________ Phone: ______________

Project Manager: ______________ Phone: ______________

Nearest Hospital: ______________ Phone: ______________

Poison Control: 1-800-222-1222

CHEMICAL EXPOSURE PROCEDURES:

Eyes: Flush with water for 15 minutes minimum

Skin: Remove contaminated clothing, wash thoroughly with water

Inhalation: Move to fresh air, seek medical attention if symptoms persist

Ingestion: Do NOT induce vomiting, seek immediate medical attention

CONCRETE WASHOUT PROCEDURES:

Designated washout area: ______________

Spill kit location: ______________

Procedure: ______________

FIRST AID STATIONS:

Location 1: ______________ Location 2: ______________

EYE WASH STATIONS:

Location 1: ______________ Location 2: ______________

Concrete Placement Risk Assessment Summary

OVERALL RISK ASSESSMENT:

Based on the identified hazards and existing controls, the overall risk level for this concrete placement is:

☐ LOW - Routine placement with minimal hazards, controls adequate

☐ MEDIUM - Moderate hazards, requires ongoing monitoring

☐ HIGH - Significant hazards, requires active controls and frequent inspection

☐ EXTREME - Severe hazards, requires engineering controls and specialized oversight

CRITICAL CONTROLS REQUIRED:

1. ______________

2. ______________

3. ______________

4. ______________

5. ______________

POUR APPROVAL:

I have inspected the formwork, reinforcing steel, embeds, and placement equipment. All conditions are

satisfactory for concrete placement to proceed safely.

Inspector: ______________ Signature: ______________ Date: ___________

Concrete Supervisor: ______________ Signature: ______________ Date: ___________

POUR START TIME: ______________ POUR END TIME: ______________