Cold Work Permit (Enhanced) template

Free Cold Work Permit (Enhanced) template for construction you can edit online and download as PDF. Covers permit information, hazard identification, attached documents.

Permit Information

PTW REFERENCE: PTW-______________ CONTRACTOR: ______________

PROJECT NAME: ______________ NO. OF EMPLOYEES INVOLVED: _____

STARTING FROM: ______________ DATE: ______________ TIME: ______________

EXPECTED COMPLETION: ______________ DATE: ______________ TIME: ______________

ACTIVITY: ______________

WORK DESCRIPTION: ______________

______________

LOCATION OF JOB TO BE PERFORMED: ______________

TOOLS/EQUIPMENT TO BE USED: ______________

______________

Hazard Identification

Identify risk associated with this Cold Work:

☐ Fall from Height ☐ Adverse Weather ☐ Flying particles ☐ Moving Vehicle/Equipment

☐ Falling Debris/Objects ☐ Protruding objects ☐ Tripping / Slipping ☐ Faulty Tool/Material

☐ Noise ☐ Heat ☐ Vibration ☐ Poor Illumination

☐ Manual Handling ☐ Chemical Exposure ☐ Biological Hazards ☐ Dust / Fibers

☐ Electrical ☐ Pressure Test ☐ Hot Surfaces ☐ Sharp Edges

OTHER HAZARDS (Specify): ______________

______________

Attached Documents

The following document must be attached with this permit:

DOCUMENTATTACHEDREFERENCE NUMBER
Method Statement Risk Assessment (RAMS) Other (specify): ______________☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
Rev #: ______________ Ref #: ______________ Ref #: ______________

Precautions & Control Measures

Precaution required to complete the work safelyYesNoN/ARemarks
Have tools and devices to be used been tested and adjusted? Have all hazards related to this activity been identified and assessed? Are work area barricades/warning signs in place? Is adequate lighting provided? Are emergency procedures known and understood? Is first aid kit available at worksite? Have all personnel been briefed on task hazards?☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
☐
________ ________ ________ ________ ________ ________ ________

WORK ACTIVITY SPECIFIC CONTROLS:

Working at Height:
☐ Scaffolding ☐ Ladder ☐ MEWP ☐ Fall Protection
☐☐☐________
Pressure Test:
☐ Test plan ☐ Isolation ☐ Bleed points ☐ Pressure rating
☐☐☐________
Chemical Handling:
☐ SDS available ☐ Containment ☐ Spill kit ☐ Decontamination
☐☐☐________
Electrical Work (Cold):
☐ LOTO applied ☐ Verified ☐ Grounded ☐ Insulated tools
☐☐☐________
Saw/Cold Cut:
☐ Guards in place ☐ Spark control ☐ Fire watch ☐ Coolant/flush
☐☐☐________
Hot Surfaces:
☐ Insulated ☐ Warning signs ☐ Cool down ☐ Contact protection
☐☐☐________
Lifting Operations:
☐ Lift plan ☐ Certified gear ☐ Barricades ☐ Banksman
☐☐☐________
Dust / Fumes:
☐ LEV / Extraction ☐ Respiratory PPE ☐ Wet methods ☐ Monitoring
☐☐☐________

Associated Permits Required

Are permits associated required for this activity? If yes, mentioned below:

PERMIT TYPEREQUIREDPERMIT NUMBER
Hot Work Permit Working At Height Permit Excavation Permit Electrical Permit Confined Space Entry Permit Lifting Operation Permit Other (specify): ______________☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
☐ Yes ☐ No
#: ______________ #: ______________ #: ______________ #: ______________ #: ______________ #: ______________ #: ______________

Inspection Checklist (Issuer & Receiver)

The following areas / items have been inspected by issuer and receiver:

ITEMSTATUSCOMMENTS
Access / Egress Danger / Warning Signs Lighting / Illumination Safety Barriers / Barricades Hand Tools - Condition Power Tools - Condition Housekeeping - Work Area Fire Extinguisher (if required) First Aid Kit Emergency Contact Numbers Posted PPE AvailabilityGood ☐ Poor ☐ In Place ☐ Not Adequate ☐ Not In Place ☐ Not Good ☐ Fault ☐ Good ☐ Fault ☐ Good ☐ Poor ☐ Present ☐ Not Present ☐ Not Yes ☐ No ☐ Yes ☐ No ☐________ ________ ________ ________ ________ ________ ________ Type: _________ Location: ______________ Location: ______________ ________ Type: ______________
OTHER ITEMS (Specify): ________ ________________ ________________ ________

INSPECTED BY (Issuer): ______________ DATE: ______________ TIME: ______________

INSPECTED BY (Receiver): ______________ DATE: ______________ TIME: ______________

Personal Protective Equipment (Ppe)

PPE Required for the activity:

MANDATORY PPE:

☐ Helmet / Hard hat ☐ Safety Shoes / Steel-toed boots ☐ Reflective Vest

☐ Safety Goggles / Glasses ☐ Safety Gloves ☐ Safety Ear Plugs / Muffs

ADDITIONAL PPE (as required):

☐ Dust Mask / Respirator (Type: ______________) ☐ Face Shield

☐ Chemical Suit / Coveralls ☐ Welding Apron ☐ Rubber Boots / Gumboot

☐ Safety Harness / Fall Arrest ☐ Weather Protection

☐ High Visibility Clothing ☐ Sun Protection ☐ Other: ______________

PPE VERIFIED BY: ______________ DATE: ______________ TIME: ______________

Toolbox Talk / Pre-Work Briefing

TOPICS COVERED:

☐ Scope of work ☐ Hazards identified

☐ Control measures ☐ PPE requirements

☐ Emergency procedures ☐ Communication methods

☐ Stop work authority ☐ First aid / Emergency contacts

ATTENDEES:

NAMEROLECOMPANYSIGNATURE
________ ________ ________ ________ ________________ ________ ________ ________ ________________ ________ ________ ________ ________________ ________ ________ ________ ________

BRIEFING CONDUCTED BY: ______________ DATE: ______________ TIME: ______________

Issue And Acceptance Before Work

ACCEPTANCE OF WORK PERMISSION BY THE PERSON IN-CHARGE (RECEIVER)

I certify that I have read and verified this work permit and checklist. I am aware of the risks

that can be exposed to. I commit that I will be in line with all safety rules mentioned in work

permit checklist and will not deflect any of them.

Permit Receiver Name: ______________

Signature: ______________ Date: ______________ Time: ______________

AUTHORITY TO PROCEED BY AUTHORIZED PERSON (ISSUER)

I reviewed the work permission checklist and checked the working conditions. I have reviewed

all aspects of the task/activity and am satisfied with the arrangements as detailed in the

"risk assessment" have been put in place and certify that the activity detailed above is

authorized to proceed.

Permit Issuer Name: ______________

Signature: ______________ Date: ______________ Time: ______________

ACKNOWLEDGE BY CONTRACTOR'S SAFETY ENGINEER/OFFICER

Name: ______________

Signature: ______________ Date: ______________ Time: ______________

VERIFICATION BY SEC CONSULTANT (If appointed for the project)

Name: ______________

Signature: ______________ Date: ______________ Time: ______________

Work Execution Record

WORK START TIME: ______________ DATE: ______________

WORK LOG:

TIMEACTIVITY / OBSERVATIONINITIALS
______ ______ ______ ______________ ________ ________ _______________ _______ _______ _______

WORK COMPLETION TIME: ______________ DATE: ______________

ANY ISSUES / INCIDENTS DURING WORK? ☐ No ☐ Yes (describe below):

______________

______________

Clearance And Cancellation After Work Or Suspension Of Permit

CLEARANCE (Site Manager)

All men, materials, tools, equipment, housekeeping etc under my charge have been withdrawn.

The permitted work is:

☐ COMPLETE - All work finished, area cleared and safe

☐ NOT COMPLETE - Work partially complete, area made safe

Name: ______________

Signature: ______________ Date: ______________ Time: ______________

SUSPENSION

This permit is suspended. I have notified the Authorized person specified that the work is not

complete and the area / equipment is not safe to use.

Reason for suspension: ______________

______________

Name: ______________

Signature: ______________ Date: ______________ Time: ______________

WORK HANDOVER (If not complete)

Work handed over to next shift:

Supervisor Name (Incoming): ______________

Signature: ______________ Date: ______________ Time: ______________

Permit extended / revalidated for next shift? ☐ Yes ☐ No New Permit #: ______________

Incident / Near Miss Reporting

Any incidents, near misses, or unsafe conditions during this work:

☐ No incidents/near misses

☐ Incident occurred (complete below)

☐ Near miss occurred (complete below)

☐ Unsafe condition observed (complete below)

DESCRIPTION: ______________

______________

______________

CORRECTIVE ACTIONS TAKEN: ______________

______________

REPORTED BY: ______________ Date: ______________ Time: ______________

REPORT NUMBER (if applicable): ______________

THIS PERMIT IS VALID ONLY FOR THE DATE AND TIME SPECIFIED - ONE SHIFT ONLY