Free Cold Work Permit (Enhanced) template for construction you can edit online and download as PDF. Covers permit information, hazard identification, attached documents.
PTW REFERENCE: PTW-______________ CONTRACTOR: ______________
PROJECT NAME: ______________ NO. OF EMPLOYEES INVOLVED: _____
STARTING FROM: ______________ DATE: ______________ TIME: ______________
EXPECTED COMPLETION: ______________ DATE: ______________ TIME: ______________
ACTIVITY: ______________
WORK DESCRIPTION: ______________
______________
LOCATION OF JOB TO BE PERFORMED: ______________
TOOLS/EQUIPMENT TO BE USED: ______________
______________
Identify risk associated with this Cold Work:
☐ Fall from Height ☐ Adverse Weather ☐ Flying particles ☐ Moving Vehicle/Equipment
☐ Falling Debris/Objects ☐ Protruding objects ☐ Tripping / Slipping ☐ Faulty Tool/Material
☐ Noise ☐ Heat ☐ Vibration ☐ Poor Illumination
☐ Manual Handling ☐ Chemical Exposure ☐ Biological Hazards ☐ Dust / Fibers
☐ Electrical ☐ Pressure Test ☐ Hot Surfaces ☐ Sharp Edges
OTHER HAZARDS (Specify): ______________
______________
The following document must be attached with this permit:
| DOCUMENT | ATTACHED | REFERENCE NUMBER |
|---|---|---|
| Method Statement Risk Assessment (RAMS) Other (specify): ______________ | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | Rev #: ______________ Ref #: ______________ Ref #: ______________ |
| Precaution required to complete the work safely | Yes | No | N/A | Remarks |
|---|---|---|---|---|
| Have tools and devices to be used been tested and adjusted? Have all hazards related to this activity been identified and assessed? Are work area barricades/warning signs in place? Is adequate lighting provided? Are emergency procedures known and understood? Is first aid kit available at worksite? Have all personnel been briefed on task hazards? | ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ☐ ☐ ☐ ☐ ☐ ☐ ☐ | ________ ________ ________ ________ ________ ________ ________ |
WORK ACTIVITY SPECIFIC CONTROLS:
| Working at Height: ☐ Scaffolding ☐ Ladder ☐ MEWP ☐ Fall Protection | ☐ | ☐ | ☐ | ________ |
|---|---|---|---|---|
| Pressure Test: ☐ Test plan ☐ Isolation ☐ Bleed points ☐ Pressure rating | ☐ | ☐ | ☐ | ________ |
| Chemical Handling: ☐ SDS available ☐ Containment ☐ Spill kit ☐ Decontamination | ☐ | ☐ | ☐ | ________ |
| Electrical Work (Cold): ☐ LOTO applied ☐ Verified ☐ Grounded ☐ Insulated tools | ☐ | ☐ | ☐ | ________ |
| Saw/Cold Cut: ☐ Guards in place ☐ Spark control ☐ Fire watch ☐ Coolant/flush | ☐ | ☐ | ☐ | ________ |
| Hot Surfaces: ☐ Insulated ☐ Warning signs ☐ Cool down ☐ Contact protection | ☐ | ☐ | ☐ | ________ |
| Lifting Operations: ☐ Lift plan ☐ Certified gear ☐ Barricades ☐ Banksman | ☐ | ☐ | ☐ | ________ |
| Dust / Fumes: ☐ LEV / Extraction ☐ Respiratory PPE ☐ Wet methods ☐ Monitoring | ☐ | ☐ | ☐ | ________ |
Are permits associated required for this activity? If yes, mentioned below:
| PERMIT TYPE | REQUIRED | PERMIT NUMBER |
|---|---|---|
| Hot Work Permit Working At Height Permit Excavation Permit Electrical Permit Confined Space Entry Permit Lifting Operation Permit Other (specify): ______________ | ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No ☐ Yes ☐ No | #: ______________ #: ______________ #: ______________ #: ______________ #: ______________ #: ______________ #: ______________ |
The following areas / items have been inspected by issuer and receiver:
| ITEM | STATUS | COMMENTS |
|---|---|---|
| Access / Egress Danger / Warning Signs Lighting / Illumination Safety Barriers / Barricades Hand Tools - Condition Power Tools - Condition Housekeeping - Work Area Fire Extinguisher (if required) First Aid Kit Emergency Contact Numbers Posted PPE Availability | Good ☐ Poor ☐ In Place ☐ Not Adequate ☐ Not In Place ☐ Not Good ☐ Fault ☐ Good ☐ Fault ☐ Good ☐ Poor ☐ Present ☐ Not Present ☐ Not Yes ☐ No ☐ Yes ☐ No ☐ | ________ ________ ________ ________ ________ ________ ________ Type: _________ Location: ______________ Location: ______________ ________ Type: ______________ |
| OTHER ITEMS (Specify): ________ ________ | ________ ________ | ________ ________ |
INSPECTED BY (Issuer): ______________ DATE: ______________ TIME: ______________
INSPECTED BY (Receiver): ______________ DATE: ______________ TIME: ______________
PPE Required for the activity:
MANDATORY PPE:
☐ Helmet / Hard hat ☐ Safety Shoes / Steel-toed boots ☐ Reflective Vest
☐ Safety Goggles / Glasses ☐ Safety Gloves ☐ Safety Ear Plugs / Muffs
ADDITIONAL PPE (as required):
☐ Dust Mask / Respirator (Type: ______________) ☐ Face Shield
☐ Chemical Suit / Coveralls ☐ Welding Apron ☐ Rubber Boots / Gumboot
☐ Safety Harness / Fall Arrest ☐ Weather Protection
☐ High Visibility Clothing ☐ Sun Protection ☐ Other: ______________
PPE VERIFIED BY: ______________ DATE: ______________ TIME: ______________
TOPICS COVERED:
☐ Scope of work ☐ Hazards identified
☐ Control measures ☐ PPE requirements
☐ Emergency procedures ☐ Communication methods
☐ Stop work authority ☐ First aid / Emergency contacts
ATTENDEES:
| NAME | ROLE | COMPANY | SIGNATURE | ||
|---|---|---|---|---|---|
| ________ ________ ________ ________ ________ | ________ ________ ________ ________ ________ | ________ ________ ________ ________ ________ | ________ ________ ________ ________ ________ |
BRIEFING CONDUCTED BY: ______________ DATE: ______________ TIME: ______________
ACCEPTANCE OF WORK PERMISSION BY THE PERSON IN-CHARGE (RECEIVER)
I certify that I have read and verified this work permit and checklist. I am aware of the risks
that can be exposed to. I commit that I will be in line with all safety rules mentioned in work
permit checklist and will not deflect any of them.
Permit Receiver Name: ______________
Signature: ______________ Date: ______________ Time: ______________
AUTHORITY TO PROCEED BY AUTHORIZED PERSON (ISSUER)
I reviewed the work permission checklist and checked the working conditions. I have reviewed
all aspects of the task/activity and am satisfied with the arrangements as detailed in the
"risk assessment" have been put in place and certify that the activity detailed above is
authorized to proceed.
Permit Issuer Name: ______________
Signature: ______________ Date: ______________ Time: ______________
ACKNOWLEDGE BY CONTRACTOR'S SAFETY ENGINEER/OFFICER
Name: ______________
Signature: ______________ Date: ______________ Time: ______________
VERIFICATION BY SEC CONSULTANT (If appointed for the project)
Name: ______________
Signature: ______________ Date: ______________ Time: ______________
WORK START TIME: ______________ DATE: ______________
WORK LOG:
| TIME | ACTIVITY / OBSERVATION | INITIALS | ||
|---|---|---|---|---|
| ______ ______ ______ ______ | ________ ________ ________ ________ | _______ _______ _______ _______ |
WORK COMPLETION TIME: ______________ DATE: ______________
ANY ISSUES / INCIDENTS DURING WORK? ☐ No ☐ Yes (describe below):
______________
______________
CLEARANCE (Site Manager)
All men, materials, tools, equipment, housekeeping etc under my charge have been withdrawn.
The permitted work is:
☐ COMPLETE - All work finished, area cleared and safe
☐ NOT COMPLETE - Work partially complete, area made safe
Name: ______________
Signature: ______________ Date: ______________ Time: ______________
SUSPENSION
This permit is suspended. I have notified the Authorized person specified that the work is not
complete and the area / equipment is not safe to use.
Reason for suspension: ______________
______________
Name: ______________
Signature: ______________ Date: ______________ Time: ______________
WORK HANDOVER (If not complete)
Work handed over to next shift:
Supervisor Name (Incoming): ______________
Signature: ______________ Date: ______________ Time: ______________
Permit extended / revalidated for next shift? ☐ Yes ☐ No New Permit #: ______________
Any incidents, near misses, or unsafe conditions during this work:
☐ No incidents/near misses
☐ Incident occurred (complete below)
☐ Near miss occurred (complete below)
☐ Unsafe condition observed (complete below)
DESCRIPTION: ______________
______________
______________
CORRECTIVE ACTIONS TAKEN: ______________
______________
REPORTED BY: ______________ Date: ______________ Time: ______________
REPORT NUMBER (if applicable): ______________
THIS PERMIT IS VALID ONLY FOR THE DATE AND TIME SPECIFIED - ONE SHIFT ONLY